IDEAS home Printed from https://ideas.repec.org/a/spr/opmare/v16y2023i3d10.1007_s12063-023-00371-2.html
   My bibliography  Save this article

Heterogeneous worker multi-functionality and efficiency in dual resource constrained manufacturing lines: an assessment by simulation

Author

Listed:
  • Federica Costa

    (Politecnico di Milano)

  • Matthias Thürer

    (Chemnitz University of Technology)

  • Alberto Portioli-Staudacher

    (Politecnico di Milano)

Abstract

Flexibility is a main mean to create resilient supply chains. The most flexible resources are often human resources but creating high, homogenous skill levels is not cost efficient. Heterogenous labour provides an alternative. The literature on Dual Resource Constrained (DRC) shops modelled heterogeneous labour with multi-functionality and efficiency matrices that indicate if a worker can perform at a station and according to which level of efficiency. However, this literature typically considered these matrices as a given environmental factor rather than a factor under firm control. Consequently, it typically neglected literature that can be used to guide matrix design. In response, this study draws on the literature on unbalanced lines to test eight different matrices to guide worker training. Discrete event simulation is then used to evaluate their performance in a DRC pure flow shop with high variability in demand and processing times. Results demonstrate that the matrix design impacts performance and that an unbalanced design has the potential to improve performance compared to a balanced design and full multi-functionality. Specifically, the bowl configuration shows much promise, which further confirms the “bowl phenomenon”. However, performance gains are dependent on the combination of When, Where and Who rules used to guide the worker assignment decision. So, the decision on worker training is also contingent on the decision which worker assignment rule to use. Findings have important implications for research and practice, providing guidance on how to design more resilient shops and supply chains.

Suggested Citation

  • Federica Costa & Matthias Thürer & Alberto Portioli-Staudacher, 2023. "Heterogeneous worker multi-functionality and efficiency in dual resource constrained manufacturing lines: an assessment by simulation," Operations Management Research, Springer, vol. 16(3), pages 1476-1489, September.
  • Handle: RePEc:spr:opmare:v:16:y:2023:i:3:d:10.1007_s12063-023-00371-2
    DOI: 10.1007/s12063-023-00371-2
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s12063-023-00371-2
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s12063-023-00371-2?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Anis Assad Neto & Jessyca Sampaio & Silvana Pereira Detro & Fernando Deschamps & Eduardo Alves Portela Santos & Eduardo de Freitas Rocha Loures, 2021. "Reconciling process flexibility and standardization: a case study in the automotive industry," Operations Management Research, Springer, vol. 14(3), pages 507-524, December.
    2. Frederick S. Hillier & Ronald W. Boling, 1979. "On the Optimal Allocation of Work in Symmetrically Unbalanced Production Line Systems with Variable Operation Times," Management Science, INFORMS, vol. 25(8), pages 721-728, August.
    3. Rajesh Pansare & Gunjan Yadav, 2022. "Repurposing production operations during COVID-19 pandemic by integrating Industry 4.0 and reconfigurable manufacturing practices: an emerging economy perspective," Operations Management Research, Springer, vol. 15(3), pages 1270-1289, December.
    4. Rosser T. Nelson, 1967. "Labor and Machine Limited Production Systems," Management Science, INFORMS, vol. 13(9), pages 648-671, May.
    5. Nina Edh Mirzaei & Per Hilletofth & Rudrajeet Pal, 2021. "Challenges to competitive manufacturing in high-cost environments: checklist and insights from Swedish manufacturing firms," Operations Management Research, Springer, vol. 14(3), pages 272-292, December.
    6. Vimal K.E.K & Simon Peter Nadeem & Mahadharsan Ravichandran & Manavalan Ethirajan & Jayakrishna Kandasamy, 2022. "Resilience strategies to recover from the cascading ripple effect in a copper supply chain through project management," Operations Management Research, Springer, vol. 15(1), pages 440-460, June.
    7. Lei, Deming & Guo, Xiuping, 2015. "An effective neighborhood search for scheduling in dual-resource constrained interval job shop with environmental objective," International Journal of Production Economics, Elsevier, vol. 159(C), pages 296-303.
    8. Lau, Hon-Shiang, 1992. "On balancing variances of station processing times in unpaced lines," European Journal of Operational Research, Elsevier, vol. 61(3), pages 345-356, September.
    9. Matthias Thürer & Mark Stevenson & Paolo Renna, 2019. "Workload control in dual-resource constrained high-variety shops: an assessment by simulation," International Journal of Production Research, Taylor & Francis Journals, vol. 57(3), pages 931-947, February.
    10. Marco Ardolino & Andrea Bacchetti & Dmitry Ivanov, 2022. "Analysis of the COVID-19 pandemic’s impacts on manufacturing: a systematic literature review and future research agenda," Operations Management Research, Springer, vol. 15(1), pages 551-566, June.
    11. William C. Jordan & Stephen C. Graves, 1995. "Principles on the Benefits of Manufacturing Process Flexibility," Management Science, INFORMS, vol. 41(4), pages 577-594, April.
    12. Xu, J. & Xu, X. & Xie, S.Q., 2011. "Recent developments in Dual Resource Constrained (DRC) system research," European Journal of Operational Research, Elsevier, vol. 215(2), pages 309-318, December.
    13. Romero-Silva, Rodrigo & Shaaban, Sabry & Marsillac, Erika & Laarraf, Zouhair, 2021. "The impact of unequal processing time variability on reliable and unreliable merging line performance," International Journal of Production Economics, Elsevier, vol. 235(C).
    14. Tom Mcnamara & Sabry Shaaban & Sarah Hudson, 2016. "Fifty years of the bowl phenomenon," Post-Print hal-02010636, HAL.
    15. Xuran Gong & Qianwang Deng & Guiliang Gong & Wei Liu & Qinghua Ren, 2018. "A memetic algorithm for multi-objective flexible job-shop problem with worker flexibility," International Journal of Production Research, Taylor & Francis Journals, vol. 56(7), pages 2506-2522, April.
    16. Xiao-long Zheng & Ling Wang, 2016. "A knowledge-guided fruit fly optimization algorithm for dual resource constrained flexible job-shop scheduling problem," International Journal of Production Research, Taylor & Francis Journals, vol. 54(18), pages 5554-5566, September.
    17. Hoda Parvin & Mark Van Oyen & Dimitrios Pandelis & Damon Williams & Junghee Lee, 2012. "Fixed task zone chaining: worker coordination and zone design for inexpensive cross-training in serial CONWIP lines," IISE Transactions, Taylor & Francis Journals, vol. 44(10), pages 894-914.
    18. Thürer, Matthias & Stevenson, Mark & Protzman, Charles W., 2015. "COBACABANA (Control of Balance by Card Based Navigation): An alternative to kanban in the pure flow shop?," International Journal of Production Economics, Elsevier, vol. 166(C), pages 143-151.
    19. Jing Zhang & Wanliang Wang & Xinli Xu, 2017. "A hybrid discrete particle swarm optimization for dual-resource constrained job shop scheduling with resource flexibility," Journal of Intelligent Manufacturing, Springer, vol. 28(8), pages 1961-1972, December.
    20. Rodrigo Romero-Silva & Sabry Shaaban, 2019. "Influence of unbalanced operation time means and uneven buffer allocation on unreliable merging assembly line efficiency," International Journal of Production Research, Taylor & Francis Journals, vol. 57(6), pages 1645-1666, March.
    21. Jensen, John B., 2000. "The impact of resource flexibility and staffing decisions on cellular and departmental shop performance," European Journal of Operational Research, Elsevier, vol. 127(2), pages 279-296, December.
    22. Frederick S. Hillier & Ronald W. Boling, 1967. "Finite Queues in Series with Exponential or Erlang Service Times—A Numerical Approach," Operations Research, INFORMS, vol. 15(2), pages 286-303, April.
    23. Ming Liu & Zhongzheng Liu & Feng Chu & Rongfan Liu & Feifeng Zheng & Chengbin Chu, 2022. "Risk-averse assembly line worker assignment and balancing problem with limited temporary workers and moving workers," International Journal of Production Research, Taylor & Francis Journals, vol. 60(23), pages 7074-7092, December.
    24. Sabry Shaaban & Tom Mcnamara, 2009. "The effects of joint operations time means and variability unbalance on production line performance," Post-Print hal-04072929, HAL.
    25. Sabry Shaaban & Tom McNamara, 2009. "The effects of joint operations time means and variability unbalance on production line performance," International Journal of Manufacturing Technology and Management, Inderscience Enterprises Ltd, vol. 18(1), pages 59-78.
    26. Gaurav Kumar Badhotiya & Gunjan Soni & Vipul Jain & Rohit Joshi & Sameer Mittal, 2022. "Assessing supply chain resilience to the outbreak of COVID-19 in Indian manufacturing firms," Operations Management Research, Springer, vol. 15(3), pages 1161-1180, December.
    27. Matthias Thürer & Haiwen Zhang & Mark Stevenson & Federica Costa & Lin Ma, 2020. "Worker assignment in dual resource constrained assembly job shops with worker heterogeneity: an assessment by simulation," International Journal of Production Research, Taylor & Francis Journals, vol. 58(20), pages 6336-6349, October.
    28. Gerard M. Campbell, 1999. "Cross-Utilization of Workers Whose Capabilities Differ," Management Science, INFORMS, vol. 45(5), pages 722-732, May.
    29. Geurtsen, M. & Didden, Jeroen B.H.C. & Adan, J. & Atan, Z. & Adan, I., 2023. "Production, maintenance and resource scheduling: A review," European Journal of Operational Research, Elsevier, vol. 305(2), pages 501-529.
    30. Arsalan Zahid Piprani & Noor Ismawati Jaafar & Suhana Mohezar Ali & Muhammad Shujaat Mubarik & Muhammad Shahbaz, 2022. "Multi-dimensional supply chain flexibility and supply chain resilience: the role of supply chain risks exposure," Operations Management Research, Springer, vol. 15(1), pages 307-325, June.
    31. Park, Paul Sungchil, 1991. "The examination of worker cross-training in a dual resource constrained job shop," European Journal of Operational Research, Elsevier, vol. 52(3), pages 291-299, June.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Jose L. Andrade-Pineda & David Canca & Pedro L. Gonzalez-R & M. Calle, 2020. "Scheduling a dual-resource flexible job shop with makespan and due date-related criteria," Annals of Operations Research, Springer, vol. 291(1), pages 5-35, August.
    2. Geurtsen, M. & Didden, Jeroen B.H.C. & Adan, J. & Atan, Z. & Adan, I., 2023. "Production, maintenance and resource scheduling: A review," European Journal of Operational Research, Elsevier, vol. 305(2), pages 501-529.
    3. Xu, J. & Xu, X. & Xie, S.Q., 2011. "Recent developments in Dual Resource Constrained (DRC) system research," European Journal of Operational Research, Elsevier, vol. 215(2), pages 309-318, December.
    4. Olivella, Jordi & Nembhard, David, 2016. "Calibrating cross-training to meet demand mix variation and employee absence," European Journal of Operational Research, Elsevier, vol. 248(2), pages 462-472.
    5. Sabry Shaaban & Rodrigo Romero-Silva, 2021. "Performance of merging lines with uneven buffer capacity allocation: the effects of unreliability under different inventory-related costs," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 29(4), pages 1253-1288, December.
    6. Alejandro Vital-Soto & Mohammed Fazle Baki & Ahmed Azab, 2023. "A multi-objective mathematical model and evolutionary algorithm for the dual-resource flexible job-shop scheduling problem with sequencing flexibility," Flexible Services and Manufacturing Journal, Springer, vol. 35(3), pages 626-668, September.
    7. Romero-Silva, Rodrigo & Shaaban, Sabry & Marsillac, Erika & Laarraf, Zouhair, 2021. "The impact of unequal processing time variability on reliable and unreliable merging line performance," International Journal of Production Economics, Elsevier, vol. 235(C).
    8. Syed Imran Zaman & Sharfuddin Ahmed Khan & Sahar Qabool & Himanshu Gupta, 2023. "How digitalization in banking improve service supply chain resilience of e-commerce sector? a technological adoption model approach," Operations Management Research, Springer, vol. 16(2), pages 904-930, June.
    9. Wallace J. Hopp & Eylem Tekin & Mark P. Van Oyen, 2004. "Benefits of Skill Chaining in Serial Production Lines with Cross-Trained Workers," Management Science, INFORMS, vol. 50(1), pages 83-98, January.
    10. Federica Costa & Alberto Portioli-Staudacher, 2021. "Labor flexibility integration in workload control in Industry 4.0 era," Operations Management Research, Springer, vol. 14(3), pages 420-433, December.
    11. Battaïa, Olga & Dolgui, Alexandre, 2022. "Hybridizations in line balancing problems: A comprehensive review on new trends and formulations," International Journal of Production Economics, Elsevier, vol. 250(C).
    12. Henao, César Augusto & Ferrer, Juan Carlos & Muñoz, Juan Carlos & Vera, Jorge, 2016. "Multiskilling with closed chains in a service industry: A robust optimization approach," International Journal of Production Economics, Elsevier, vol. 179(C), pages 166-178.
    13. Paul, Jomon Aliyas & MacDonald, Leo, 2014. "Modeling the benefits of cross-training to address the nursing shortage," International Journal of Production Economics, Elsevier, vol. 150(C), pages 83-95.
    14. Gnanlet, Adelina & Gilland, Wendell G., 2014. "Impact of productivity on cross-training configurations and optimal staffing decisions in hospitals," European Journal of Operational Research, Elsevier, vol. 238(1), pages 254-269.
    15. Hillier, Frederick S. & So, Kut C., 1996. "On the robustness of the bowl phenomenon," European Journal of Operational Research, Elsevier, vol. 89(3), pages 496-515, March.
    16. Xiuli Wu & Junjian Peng & Xiao Xiao & Shaomin Wu, 2021. "An effective approach for the dual-resource flexible job shop scheduling problem considering loading and unloading," Journal of Intelligent Manufacturing, Springer, vol. 32(3), pages 707-728, March.
    17. Berti, Nicola & Finco, Serena & Battaïa, Olga & Delorme, Xavier, 2021. "Ageing workforce effects in Dual-Resource Constrained job-shop scheduling," International Journal of Production Economics, Elsevier, vol. 237(C).
    18. Sachs, F.E. & Helber, S. & Kiesmüller, G.P., 2022. "Evaluation of Unreliable Flow Lines with Limited Buffer Capacities and Spare Part Provisioning," European Journal of Operational Research, Elsevier, vol. 302(2), pages 544-559.
    19. Fügener, Andreas & Pahr, Alexander & Brunner, Jens O., 2018. "Mid-term nurse rostering considering cross-training effects," International Journal of Production Economics, Elsevier, vol. 196(C), pages 176-187.
    20. Dominik Kress & David Müller & Jenny Nossack, 2019. "A worker constrained flexible job shop scheduling problem with sequence-dependent setup times," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(1), pages 179-217, March.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:opmare:v:16:y:2023:i:3:d:10.1007_s12063-023-00371-2. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.