IDEAS home Printed from https://ideas.repec.org/a/spr/jsched/v23y2020i2d10.1007_s10951-019-00629-3.html
   My bibliography  Save this article

An optimal online algorithm for scheduling with general machine cost functions

Author

Listed:
  • Islam Akaria

    (University of Haifa)

  • Leah Epstein

    (University of Haifa)

Abstract

We present two deterministic online algorithms for the problem of scheduling with a general machine cost function. In this problem, every machine has a cost that is given by a nonnegative cost function, and the objective function is the sum of makespan and the cost of the purchased machines. In previous work by Imreh, it was shown that no deterministic algorithm has competitive ratio below 2, and an algorithm whose competitive ratio does not exceed $$(3+\sqrt{5})/2 \approx 2.618$$(3+5)/2≈2.618 was presented. Our first algorithm imitates an optimal offline solution with respect to the number of machines used, and we show that its competitive ratio is exactly 2.5. Then, we modify our algorithm by imitating a preemptive optimal offline solution instead of a non-preemptive one. This leads to the design of a 2-competitive algorithm, which is the best possible.

Suggested Citation

  • Islam Akaria & Leah Epstein, 2020. "An optimal online algorithm for scheduling with general machine cost functions," Journal of Scheduling, Springer, vol. 23(2), pages 155-162, April.
  • Handle: RePEc:spr:jsched:v:23:y:2020:i:2:d:10.1007_s10951-019-00629-3
    DOI: 10.1007/s10951-019-00629-3
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s10951-019-00629-3
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s10951-019-00629-3?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Robert McNaughton, 1959. "Scheduling with Deadlines and Loss Functions," Management Science, INFORMS, vol. 6(1), pages 1-12, October.
    2. György Dósa & Yong He, 2006. "Scheduling with machine cost and rejection," Journal of Combinatorial Optimization, Springer, vol. 12(4), pages 337-350, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Xu, Jun & Wang, Jun-Qiang & Liu, Zhixin, 2022. "Parallel batch scheduling: Impact of increasing machine capacity," Omega, Elsevier, vol. 108(C).
    2. Yinfeng Xu & Rongteng Zhi & Feifeng Zheng & Ming Liu, 2022. "Competitive algorithm for scheduling of sharing machines with rental discount," Journal of Combinatorial Optimization, Springer, vol. 44(1), pages 414-434, August.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Liu Guiqing & Li Kai & Cheng Bayi, 2015. "Preemptive Scheduling with Controllable Processing Times on Parallel Machines," Journal of Systems Science and Information, De Gruyter, vol. 3(1), pages 68-76, February.
    2. Liqi Zhang & Lingfa Lu & Shisheng Li, 2016. "New results on two-machine flow-shop scheduling with rejection," Journal of Combinatorial Optimization, Springer, vol. 31(4), pages 1493-1504, May.
    3. Yinfeng Xu & Rongteng Zhi & Feifeng Zheng & Ming Liu, 2022. "Competitive algorithm for scheduling of sharing machines with rental discount," Journal of Combinatorial Optimization, Springer, vol. 44(1), pages 414-434, August.
    4. Hoogeveen, J. A. & Lenstra, J. K. & Veltman, B., 1996. "Preemptive scheduling in a two-stage multiprocessor flow shop is NP-hard," European Journal of Operational Research, Elsevier, vol. 89(1), pages 172-175, February.
    5. Yung-Chia Chang & Kuei-Hu Chang & Ching-Ping Zheng, 2022. "Application of a Non-Dominated Sorting Genetic Algorithm to Solve a Bi-Objective Scheduling Problem Regarding Printed Circuit Boards," Mathematics, MDPI, vol. 10(13), pages 1-21, July.
    6. Scholl, Armin & Becker, Christian, 2006. "State-of-the-art exact and heuristic solution procedures for simple assembly line balancing," European Journal of Operational Research, Elsevier, vol. 168(3), pages 666-693, February.
    7. C N Potts & V A Strusevich, 2009. "Fifty years of scheduling: a survey of milestones," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(1), pages 41-68, May.
    8. Slotnick, Susan A., 2011. "Order acceptance and scheduling: A taxonomy and review," European Journal of Operational Research, Elsevier, vol. 212(1), pages 1-11, July.
    9. Leah Epstein, 2023. "Parallel solutions for preemptive makespan scheduling on two identical machines," Journal of Scheduling, Springer, vol. 26(1), pages 61-76, February.
    10. Djellab, Housni & Djellab, Khaled, 2002. "Preemptive Hybrid Flowshop Scheduling problem of interval orders," European Journal of Operational Research, Elsevier, vol. 137(1), pages 37-49, February.
    11. Han, Bin & Zhang, Wenjun & Lu, Xiwen & Lin, Yingzi, 2015. "On-line supply chain scheduling for single-machine and parallel-machine configurations with a single customer: Minimizing the makespan and delivery cost," European Journal of Operational Research, Elsevier, vol. 244(3), pages 704-714.
    12. Huo, Yumei & Zhao, Hairong, 2015. "Total completion time minimization on multiple machines subject to machine availability and makespan constraints," European Journal of Operational Research, Elsevier, vol. 243(2), pages 547-554.
    13. Chen, Lin & Ye, Deshi & Zhang, Guochuan, 2018. "Parallel machine scheduling with speed-up resources," European Journal of Operational Research, Elsevier, vol. 268(1), pages 101-112.
    14. Xu, Jun & Wang, Jun-Qiang & Liu, Zhixin, 2022. "Parallel batch scheduling: Impact of increasing machine capacity," Omega, Elsevier, vol. 108(C).
    15. Zeynep Adak & Mahmure Övül Arıoğlu Akan & Serol Bulkan, 0. "Multiprocessor open shop problem: literature review and future directions," Journal of Combinatorial Optimization, Springer, vol. 0, pages 1-23.
    16. Mehdi Rajabi Asadabadi, 2017. "A developed slope order index (SOI) for bottlenecks in projects and production lines," Computational Management Science, Springer, vol. 14(2), pages 281-291, April.
    17. Jiang, Xiaojuan & Lee, Kangbok & Pinedo, Michael L., 2021. "Ideal schedules in parallel machine settings," European Journal of Operational Research, Elsevier, vol. 290(2), pages 422-434.
    18. Yiwei Jiang & Zewei Weng & Jueliang Hu, 2014. "Algorithms with limited number of preemptions for scheduling on parallel machines," Journal of Combinatorial Optimization, Springer, vol. 27(4), pages 711-723, May.
    19. Viswanath Nagarajan & Joel Wolf & Andrey Balmin & Kirsten Hildrum, 2019. "Malleable scheduling for flows of jobs and applications to MapReduce," Journal of Scheduling, Springer, vol. 22(4), pages 393-411, August.
    20. Qian, Fubin & Strusevich, Vitaly & Gribkovskaia, Irina & Halskau, Øyvind, 2015. "Minimization of passenger takeoff and landing risk in offshore helicopter transportation: Models, approaches and analysis," Omega, Elsevier, vol. 51(C), pages 93-106.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:jsched:v:23:y:2020:i:2:d:10.1007_s10951-019-00629-3. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.