IDEAS home Printed from https://ideas.repec.org/a/spr/annopr/v312y2022i1d10.1007_s10479-020-03791-6.html
   My bibliography  Save this article

Preventive replacement policies for parallel systems with deviation costs between replacement and failure

Author

Listed:
  • Xufeng Zhao

    (Nanjing University of Aeronautics and Astronautics)

  • Satoshi Mizutani

    (Aichi Institute of Technology)

  • Mingchih Chen

    (Fu Jen Catholic University)

  • Toshio Nakagawa

    (Aichi Institute of Technology)

Abstract

In order to balance the deviation time between replacement and failure, a new notion of cost named as deviation cost is taken into account for planning replacement policies. We firstly take up a standard parallel system with n identical units and model replacement policies that are done at planned time and at periodic times. Next, we model again the above replacement policies when the number of units is a random variable that has a Poisson distribution. Thirdly, replacement policies are planned preventively at the completion of random working times. Optimum number of units is scheduled for a total working interval that is constantly and randomly given. Finally, we give reliability functions of k-out-of-n systems for extensions of parallel systems. We give analytical discussions for the above replacement policies and illustrate numerical examples when the failure time of each unit has an exponential distribution.

Suggested Citation

  • Xufeng Zhao & Satoshi Mizutani & Mingchih Chen & Toshio Nakagawa, 2022. "Preventive replacement policies for parallel systems with deviation costs between replacement and failure," Annals of Operations Research, Springer, vol. 312(1), pages 533-551, May.
  • Handle: RePEc:spr:annopr:v:312:y:2022:i:1:d:10.1007_s10479-020-03791-6
    DOI: 10.1007/s10479-020-03791-6
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s10479-020-03791-6
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s10479-020-03791-6?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Toshio Nakagawa, 2014. "Random Maintenance Policies," Springer Series in Reliability Engineering, Springer, edition 127, number 978-1-4471-6575-0, December.
    2. Abouei Ardakan, Mostafa & Zeinal Hamadani, Ali, 2014. "Reliability optimization of series–parallel systems with mixed redundancy strategy in subsystems," Reliability Engineering and System Safety, Elsevier, vol. 130(C), pages 132-139.
    3. Jingyuan Shen & Jiawen Hu & Zhi-Sheng Ye, 2020. "Optimal switching policy for warm standby systems subjected to standby failure mode," IISE Transactions, Taylor & Francis Journals, vol. 52(11), pages 1262-1274, November.
    4. Mingchih Chen & Xufeng Zhao & Toshio Nakagawa, 2019. "Replacement policies with general models," Annals of Operations Research, Springer, vol. 277(1), pages 47-61, June.
    5. Rui Peng & Qingqinq Zhai & Liudong Xing & Jun Yang, 2016. "Reliability analysis and optimal structure of series-parallel phased-mission systems subject to fault-level coverage," IISE Transactions, Taylor & Francis Journals, vol. 48(8), pages 736-746, August.
    6. Toshio Nakagawa, 2008. "Advanced Reliability Models and Maintenance Policies," Springer Series in Reliability Engineering, Springer, number 978-1-84800-294-4, December.
    7. Hamidi, Maryam & Szidarovszky, Ferenc & Szidarovszky, Miklos, 2016. "New one cycle criteria for optimizing preventive replacement policies," Reliability Engineering and System Safety, Elsevier, vol. 154(C), pages 42-48.
    8. Ibrahim Yusuf, 2016. "Reliability modelling of a parallel system with a supporting device and two types of preventive maintenance," International Journal of Operational Research, Inderscience Enterprises Ltd, vol. 25(3), pages 269-287.
    9. Zhao, Xufeng & Al-Khalifa, Khalifa N. & Magid Hamouda, Abdel & Nakagawa, Toshio, 2017. "Age replacement models: A summary with new perspectives and methods," Reliability Engineering and System Safety, Elsevier, vol. 161(C), pages 95-105.
    10. Zhao, Xufeng & Nakagawa, Toshio, 2012. "Optimization problems of replacement first or last in reliability theory," European Journal of Operational Research, Elsevier, vol. 223(1), pages 141-149.
    11. Remzi Saltoğlu & Nazmia Humaira & Gökhan İnalhan, 2016. "Aircraft Scheduled Airframe Maintenance and Downtime Integrated Cost Model," Advances in Operations Research, Hindawi, vol. 2016, pages 1-12, February.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Xufeng Zhao & Mingchih Chen & Toshio Nakagawa, 2022. "Periodic replacement policies with shortage and excess costs," Annals of Operations Research, Springer, vol. 311(1), pages 469-487, April.
    2. Zhao, Xufeng & Al-Khalifa, Khalifa N. & Magid Hamouda, Abdel & Nakagawa, Toshio, 2017. "Age replacement models: A summary with new perspectives and methods," Reliability Engineering and System Safety, Elsevier, vol. 161(C), pages 95-105.
    3. Zheng, Junjun & Okamura, Hiroyuki & Dohi, Tadashi, 2021. "Age replacement with Markovian opportunity process," Reliability Engineering and System Safety, Elsevier, vol. 216(C).
    4. Wu, Jing & Qian, Cunhua & Dohi, Tadashi, 2024. "Optimal opportunity-based age replacement policies in discrete time," Reliability Engineering and System Safety, Elsevier, vol. 241(C).
    5. Mingchih Chen & Xufeng Zhao & Toshio Nakagawa, 2019. "Replacement policies with general models," Annals of Operations Research, Springer, vol. 277(1), pages 47-61, June.
    6. Zhao, Xufeng & Chen, Mingchih & Nakagawa, Toshio, 2016. "Replacement policies for a parallel system with shortage and excess costs," Reliability Engineering and System Safety, Elsevier, vol. 150(C), pages 89-95.
    7. Kanchan Jain & Sudheesh K. Kattumannil & Anjana Rajagopal, 2023. "Replacement model with random replacement time," Statistical Papers, Springer, vol. 64(1), pages 1-15, February.
    8. Mizutani, Satoshi & Zhao, Xufeng & Nakagawa, Toshio, 2021. "Age and periodic replacement policies with two failure modes in general replacement models," Reliability Engineering and System Safety, Elsevier, vol. 214(C).
    9. Hamidi, Maryam & Szidarovszky, Ferenc & Szidarovszky, Miklos, 2016. "New one cycle criteria for optimizing preventive replacement policies," Reliability Engineering and System Safety, Elsevier, vol. 154(C), pages 42-48.
    10. Sheu, Shey-Huei & Tsai, Hsin-Nan & Sheu, Uan-Yu & Zhang, Zhe George, 2019. "Optimal replacement policies for a system based on a one-cycle criterion," Reliability Engineering and System Safety, Elsevier, vol. 191(C).
    11. Zhang, Qin & Fang, Zhigeng & Cai, Jiajia, 2021. "Extended block replacement policies with mission durations and maintenance triggering approaches," Reliability Engineering and System Safety, Elsevier, vol. 207(C).
    12. Meisam Sadeghi & Emad Roghanian, 2017. "Reliability optimization for non-repairable series-parallel systems with a choice of redundancy strategies: Erlang time-to-failure distribution," Journal of Risk and Reliability, , vol. 231(5), pages 587-604, October.
    13. Shang, Lijun & Liu, Baoliang & Qiu, Qingan & Yang, Li, 2023. "Three-dimensional warranty and post-warranty maintenance of products with monitored mission cycles," Reliability Engineering and System Safety, Elsevier, vol. 239(C).
    14. Safaei, Fatemeh & Ahmadi, Jafar & Taghipour, Sharareh, 2022. "A maintenance policy for a k-out-of-n system under enhancing the system’s operating time and safety constraints, and selling the second-hand components," Reliability Engineering and System Safety, Elsevier, vol. 218(PA).
    15. Yongjun Du & Lijun Shang & Qingan Qiu & Li Yang, 2022. "Optimum Post-Warranty Maintenance Policies for Products with Random Working Cycles," Mathematics, MDPI, vol. 10(10), pages 1-16, May.
    16. Junyuan Wang & Jimin Ye, 2022. "A new repair model and its optimization for cold standby system," Operational Research, Springer, vol. 22(1), pages 105-122, March.
    17. Zhao, Xufeng & Qian, Cunhua & Nakagawa, Toshio, 2017. "Comparisons of replacement policies with periodic times and repair numbers," Reliability Engineering and System Safety, Elsevier, vol. 168(C), pages 161-170.
    18. Jiang, R., 2018. "Performance evaluation of seven optimization models of age replacement policy," Reliability Engineering and System Safety, Elsevier, vol. 180(C), pages 302-311.
    19. Abdossaber Peiravi & Mahdi Karbasian & Mostafa Abouei Ardakan, 2018. "K-mixed strategy: A new redundancy strategy for reliability problems," Journal of Risk and Reliability, , vol. 232(1), pages 38-51, February.
    20. Zhao, Xufeng & Qian, Cunhua & Nakagawa, Toshio, 2013. "Optimal policies for cumulative damage models with maintenance last and first," Reliability Engineering and System Safety, Elsevier, vol. 110(C), pages 50-59.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:annopr:v:312:y:2022:i:1:d:10.1007_s10479-020-03791-6. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.