Advanced Search
MyIDEAS: Login to save this article or follow this journal

Delays Factors In Construction Projects Development: The Case Of Klang Valley, Malaysia

Contents:

Author Info

  • ABDELNASER OMRAN
  • OOI AI LING
  • ABDUL HAMID KADIR PAKIR
  • MAHYUDDIN RAMLI
Registered author(s):

    Abstract

    The problem of project delays in construction industry is a global phenomenon; Malaysia is no exceptional. Delays are always considered as costly to all parties involved in the project and very often it will results in dispute, claims, total abandonment and blight the feasibility for project owners and retard the development of construction industry. Therefore, the objectives of this paper are to identify the main causes and contributor to the project delays because delays can be minimized only when their causes are identified. Moreover, it is also aimed to investigate the most critical stage throughout the process of project development pertaining to the project delays as well as to recommend various methods that could be adopted by the construction industry players to mitigate the problems. In order to achieve the said objectives, a total of twenty one factors of delays which was then grouped under owner related, contractor related and consultant related delay factors and ten methods to mitigate the project delays were based on literature review. The structural questionnaires were distributed to the targeted respondents in Klang Valley, Malaysia. The findings from this paper shown that owner’s slow in decision making was perceived to be the most significant factor and main causes to the project delays. All of the respondents claimed that working drawing stage being the most critical stage in governing all of these owner’s related delay factors. Besides that, the contractor is deemed to be the main contributor to the project delays in Malaysia construction industry. It is assumed by all of the respondents that the contractor should be responsible for any delays at the construction stage which is considered as the most critical stage in governing the project delays. In order to mitigate the project delays, awarding bids to the right and experience contractor was suggested to be the utmost effective solution in resolving those contractor’s related delay factors.

    Download Info

    If you experience problems downloading a file, check if you have the proper application to view it first. In case of further problems read the IDEAS help page. Note that these files are not on the IDEAS site. Please be patient as the files may be large.
    File URL: http://www.jare-sh.com/downloads/abstract_nov_2010/omran.pdf
    Download Restriction: no

    Bibliographic Info

    Article provided by Spiru Haret University, Faculty of Accounting and Financial Management Constanta in its journal Journal of Academic Research in Economics.

    Volume (Year): 2 (2010)
    Issue (Month): 2 (November) ()
    Pages: 135-158

    as in new window
    Handle: RePEc:shc:jaresh:v:2:y:2010:i:2:p:135-158

    Contact details of provider:
    Web page: http://www2.spiruharet.ro/facultati/facultate.php?id=9
    More information through EDIRC

    Related research

    Keywords: CSFs; Project delay; construction industry; construction project development; mitigates delays; Malaysia;

    Find related papers by JEL classification:

    References

    No references listed on IDEAS
    You can help add them by filling out this form.

    Citations

    Lists

    This item is not listed on Wikipedia, on a reading list or among the top items on IDEAS.

    Statistics

    Access and download statistics

    Corrections

    When requesting a correction, please mention this item's handle: RePEc:shc:jaresh:v:2:y:2010:i:2:p:135-158. See general information about how to correct material in RePEc.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: (Claudiu Chiru).

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If references are entirely missing, you can add them using this form.

    If the full references list an item that is present in RePEc, but the system did not link to it, you can help with this form.

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your profile, as there may be some citations waiting for confirmation.

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.