IDEAS home Printed from https://ideas.repec.org/a/pal/jorsoc/v68y2017i10d10.1057_s41274-016-0156-5.html
   My bibliography  Save this article

Maximizing the profit per unit of time for the TSP with convex resource-dependent travelling times

Author

Listed:
  • Moshe Zofi

    (Ben-Gurion University of the Negev
    Sapir Academic College)

  • Ron Teller

    (Ben-Gurion University of the Negev)

  • Moshe Kaspi

    (Ben-Gurion University of the Negev)

Abstract

This paper introduces a new problem that is an extension of the travelling salesman problem (TSP) in which the travelling times are resource dependent and the objective is to maximize the profit per unit of time. We present an optimal solution approach comprised of three main steps: (1) calculating the optimal amount of total resource required (regardless of the selected tour); (2) constructing the tour; and (3) assigning the optimal resource to each connection between vertices using the equivalent load method. This solution approach finds the optimal solution with the same computational complexity for solving the classic TSP.

Suggested Citation

  • Moshe Zofi & Ron Teller & Moshe Kaspi, 2017. "Maximizing the profit per unit of time for the TSP with convex resource-dependent travelling times," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(10), pages 1177-1182, October.
  • Handle: RePEc:pal:jorsoc:v:68:y:2017:i:10:d:10.1057_s41274-016-0156-5
    DOI: 10.1057/s41274-016-0156-5
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1057/s41274-016-0156-5
    File Function: Abstract
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1057/s41274-016-0156-5?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Richard L. Daniels & Rakesh K. Sarin, 1989. "Technical Note—Single Machine Scheduling with Controllable Processing Times and Number of Jobs Tardy," Operations Research, INFORMS, vol. 37(6), pages 981-984, December.
    2. Van Wassenhove, Luk N. & Baker, Kenneth R., 1982. "A bicriterion approach to time/cost trade-offs in sequencing," European Journal of Operational Research, Elsevier, vol. 11(1), pages 48-54, September.
    3. Clyde L. Monma & Alexander Schrijver & Michael J. Todd & Victor K. Wei, 1990. "Convex Resource Allocation Problems on Directed Acyclic Graphs: Duality, Complexity, Special Cases, and Extensions," Mathematics of Operations Research, INFORMS, vol. 15(4), pages 736-748, November.
    4. Janiak, Adam & Kovalyov, Mikhail Y., 1996. "Single machine scheduling subject to deadlines and resource dependent processing times," European Journal of Operational Research, Elsevier, vol. 94(2), pages 284-291, October.
    5. Dominique Feillet & Pierre Dejax & Michel Gendreau, 2005. "Traveling Salesman Problems with Profits," Transportation Science, INFORMS, vol. 39(2), pages 188-205, May.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Carrasco, Rodrigo A. & Iyengar, Garud & Stein, Cliff, 2018. "Resource cost aware scheduling," European Journal of Operational Research, Elsevier, vol. 269(2), pages 621-632.
    2. Dvir Shabtay & Moshe Kaspi, 2006. "Minimizing the makespan in open‐shop scheduling problems with a convex resource consumption function," Naval Research Logistics (NRL), John Wiley & Sons, vol. 53(3), pages 204-216, April.
    3. Shabtay, Dvir & Kaspi, Moshe, 2006. "Parallel machine scheduling with a convex resource consumption function," European Journal of Operational Research, Elsevier, vol. 173(1), pages 92-107, August.
    4. Yaron Leyvand & Dvir Shabtay & George Steiner & Liron Yedidsion, 2010. "Just-in-time scheduling with controllable processing times on parallel machines," Journal of Combinatorial Optimization, Springer, vol. 19(3), pages 347-368, April.
    5. Dvir Shabtay & George Steiner, 2007. "Optimal Due Date Assignment and Resource Allocation to Minimize the Weighted Number of Tardy Jobs on a Single Machine," Manufacturing & Service Operations Management, INFORMS, vol. 9(3), pages 332-350, March.
    6. Leyvand, Yaron & Shabtay, Dvir & Steiner, George, 2010. "A unified approach for scheduling with convex resource consumption functions using positional penalties," European Journal of Operational Research, Elsevier, vol. 206(2), pages 301-312, October.
    7. Wan, Guohua & Vakati, Sudheer R. & Leung, Joseph Y.-T. & Pinedo, Michael, 2010. "Scheduling two agents with controllable processing times," European Journal of Operational Research, Elsevier, vol. 205(3), pages 528-539, September.
    8. Zong-Jun Wei & Li-Yan Wang & Lei Zhang & Ji-Bo Wang & Ershen Wang, 2023. "Single-Machine Maintenance Activity Scheduling with Convex Resource Constraints and Learning Effects," Mathematics, MDPI, vol. 11(16), pages 1-21, August.
    9. Yim, Seho & Hong, Sung-Pil & Park, Myoung-Ju & Chung, Yerim, 2022. "Inverse interval scheduling via reduction on a single machine," European Journal of Operational Research, Elsevier, vol. 303(2), pages 541-549.
    10. Yedidsion, Liron & Shabtay, Dvir & Korach, Ephraim & Kaspi, Moshe, 2009. "A bicriteria approach to minimize number of tardy jobs and resource consumption in scheduling a single machine," International Journal of Production Economics, Elsevier, vol. 119(2), pages 298-307, June.
    11. Shabtay, Dvir & Bensoussan, Yaron & Kaspi, Moshe, 2012. "A bicriteria approach to maximize the weighted number of just-in-time jobs and to minimize the total resource consumption cost in a two-machine flow-shop scheduling system," International Journal of Production Economics, Elsevier, vol. 136(1), pages 67-74.
    12. Hoogeveen, Han, 2005. "Multicriteria scheduling," European Journal of Operational Research, Elsevier, vol. 167(3), pages 592-623, December.
    13. Du-Juan Wang & Yunqiang Yin & Mengqi Liu, 2016. "Bicriteria scheduling problems involving job rejection, controllable processing times and rate-modifying activity," International Journal of Production Research, Taylor & Francis Journals, vol. 54(12), pages 3691-3705, June.
    14. Shabtay, Dvir, 2022. "Single-machine scheduling with machine unavailability periods and resource dependent processing times," European Journal of Operational Research, Elsevier, vol. 296(2), pages 423-439.
    15. Shabtay, Dvir & Zofi, Moshe, 2018. "Single machine scheduling with controllable processing times and an unavailability period to minimize the makespan," International Journal of Production Economics, Elsevier, vol. 198(C), pages 191-200.
    16. Oron, Daniel, 2016. "Scheduling controllable processing time jobs with position-dependent workloads," International Journal of Production Economics, Elsevier, vol. 173(C), pages 153-160.
    17. Dvir Shabtay & George Steiner, 2008. "The single-machine earliness-tardiness scheduling problem with due date assignment and resource-dependent processing times," Annals of Operations Research, Springer, vol. 159(1), pages 25-40, March.
    18. Liu Guiqing & Li Kai & Cheng Bayi, 2015. "Preemptive Scheduling with Controllable Processing Times on Parallel Machines," Journal of Systems Science and Information, De Gruyter, vol. 3(1), pages 68-76, February.
    19. Lingfa Lu & Liqi Zhang, 2023. "Scheduling problems with rejection to minimize the k-th power of the makespan plus the total rejection cost," Journal of Combinatorial Optimization, Springer, vol. 46(1), pages 1-17, August.
    20. Cheng, T. C. Edwin & Janiak, Adam & Kovalyov, Mikhail Y., 2001. "Single machine batch scheduling with resource dependent setup and processing times," European Journal of Operational Research, Elsevier, vol. 135(1), pages 177-183, November.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pal:jorsoc:v:68:y:2017:i:10:d:10.1057_s41274-016-0156-5. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.palgrave-journals.com/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.