A Simulation Model of Construction Projects Executed in Random Conditions with the Overlapping Construction Works

Author

Listed:
  • Sławomir Biruk

    (Faculty of Civil Engineering and Architecture, Lublin University of Technology, 40 Nadbystrzycka St., 20-618 Lublin, Poland)

  • Łukasz Rzepecki

    (Faculty of Civil Engineering and Architecture, Lublin University of Technology, 40 Nadbystrzycka St., 20-618 Lublin, Poland)

Abstract

Reducing the duration of construction works requires additional organizational measures, such as selecting construction methods that assure a shorter realization time, engaging additional resources, working overtime, or allowing construction works to be performed simultaneously in the same working units. The simultaneous work of crews may affect the quality of works and the efficiency of construction processes. This article presents a simulation model aimed at assessing the impact of the overlap period on the extension of the working time of the crews and the reduction of a repetitive project’s duration in random conditions. The purpose of simulation studies is to provide construction managers with guidelines when deciding on the dates of starting the sequential technological process lines realized by specialized working crews, for sustainable scheduling and organization of construction projects.

Suggested Citation

  • Sławomir Biruk & Łukasz Rzepecki, 2021. "A Simulation Model of Construction Projects Executed in Random Conditions with the Overlapping Construction Works," Sustainability, MDPI, vol. 13(11), pages 1-13, May.
  • Handle: RePEc:gam:jsusta:v:13:y:2021:i:11:p:5795-:d:559514
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2071-1050/13/11/5795/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2071-1050/13/11/5795/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Kyunghwan Kim, 2020. "Generalized Resource-Constrained Critical Path Method to Improve Sustainability in Construction Project Scheduling," Sustainability, MDPI, vol. 12(21), pages 1-19, October.
    2. Christian Terwiesch & Christoph H. Loch, 1999. "Measuring the Effectiveness of Overlapping Development Activities," Management Science, INFORMS, vol. 45(4), pages 455-465, April.
    3. Thomas A. Roemer & Reza Ahmadi, 2004. "Concurrent Crashing and Overlapping in Product Development," Operations Research, INFORMS, vol. 52(4), pages 606-622, August.
    4. Miao Yu & Fangwei Zhu & Xiaotian Yang & Linzhuo Wang & Xiuxia Sun, 2018. "Integrating Sustainability into Construction Engineering Projects: Perspective of Sustainable Project Planning," Sustainability, MDPI, vol. 10(3), pages 1-17, March.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Gülru F. Özkan-Seely & Cheryl Gaimon & Stylianos Kavadias, 2015. "Dynamic Knowledge Transfer and Knowledge Development for Product and Process Design Teams," Manufacturing & Service Operations Management, INFORMS, vol. 17(2), pages 177-190, May.
    2. Lin, Jun & Chai, Kah Hin & Brombacher, Aarnout C. & Wong, Yoke San, 2009. "Optimal overlapping and functional interaction in product development," European Journal of Operational Research, Elsevier, vol. 196(3), pages 1158-1169, August.
    3. Cheryl Gaimon & Manpreet Hora & Karthik Ramachandran, 2017. "Towards Building Multidisciplinary Knowledge on Management of Technology: An Introduction to the Special Issue," Production and Operations Management, Production and Operations Management Society, vol. 26(4), pages 567-578, April.
    4. Nagesh N. Murthy & Haikady N. Nagaraja & Hossein Rikhtehgar Berenji, 2023. "Managing concurrency in cyclical projects under stochastic task environments: Vaccine development projects during pandemics," Production and Operations Management, Production and Operations Management Society, vol. 32(3), pages 951-971, March.
    5. Nelson, Richard Graham & Azaron, Amir & Aref, Samin, 2016. "The use of a GERT based method to model concurrent product development processes," European Journal of Operational Research, Elsevier, vol. 250(2), pages 566-578.
    6. Lin, Jun & Chai, Kah Hin & Wong, Yoke San & Brombacher, Aarnout C., 2008. "A dynamic model for managing overlapped iterative product development," European Journal of Operational Research, Elsevier, vol. 185(1), pages 378-392, February.
    7. Annika Lorenz & Michael Raven & Knut Blind, 2019. "The role of standardization at the interface of product and process development in biotechnology," The Journal of Technology Transfer, Springer, vol. 44(4), pages 1097-1133, August.
    8. Zhaolin Li & Steven Q. Lu & Jennifer K. Ryan & Daewon Sun, 2021. "Impact of Organizational Structure on Development Strategy under Equity‐Based Incentives," Production and Operations Management, Production and Operations Management Society, vol. 30(4), pages 984-996, April.
    9. Sam Ransbotham & Sabyasachi Mitra, 2010. "Target Age and the Acquisition of Innovation in High-Technology Industries," Management Science, INFORMS, vol. 56(11), pages 2076-2093, November.
    10. Nitindra R. Joglekar & Ali A. Yassine & Steven D. Eppinger & Daniel E. Whitney, 2001. "Performance of Coupled Product Development Activities with a Deadline," Management Science, INFORMS, vol. 47(12), pages 1605-1620, December.
    11. Indranil R. Bardhan & Vish V. Krishnan & Shu Lin, 2007. "Project Performance and the Enabling Role of Information Technology: An Exploratory Study on the Role of Alignment," Manufacturing & Service Operations Management, INFORMS, vol. 9(4), pages 579-595, May.
    12. Pankaj Setia & Balaji Rajagopalan & Vallabh Sambamurthy & Roger Calantone, 2012. "How Peripheral Developers Contribute to Open-Source Software Development," Information Systems Research, INFORMS, vol. 23(1), pages 144-163, March.
    13. Victoria L. Mitchell & Barrie R. Nault, 2007. "Cooperative Planning, Uncertainty, and Managerial Control in Concurrent Design," Management Science, INFORMS, vol. 53(3), pages 375-389, March.
    14. Phanish Puranam & Murali Swamy, 2016. "How Initial Representations Shape Coupled Learning Processes," Organization Science, INFORMS, vol. 27(2), pages 323-335, April.
    15. Nadia Bhuiyan & Donald Gerwin & Vince Thomson, 2004. "Simulation of the New Product Development Process for Performance Improvement," Management Science, INFORMS, vol. 50(12), pages 1690-1703, December.
    16. Foad Iravani & Sriram Dasu & Reza Ahmadi, 2012. "A Hierarchical Framework for Organizing a Software Development Process," Operations Research, INFORMS, vol. 60(6), pages 1310-1322, December.
    17. Svenja C. Sommer & Christoph H. Loch & Jing Dong, 2009. "Managing Complexity and Unforeseeable Uncertainty in Startup Companies: An Empirical Study," Organization Science, INFORMS, vol. 20(1), pages 118-133, February.
    18. Donald Gerwin & Nicholas J. Barrowman, 2002. "An Evaluation of Research on Integrated Product Development," Management Science, INFORMS, vol. 48(7), pages 938-953, July.
    19. Johan Larsson & Lisa Larsson, 2020. "Integration, Application and Importance of Collaboration in Sustainable Project Management," Sustainability, MDPI, vol. 12(2), pages 1-17, January.
    20. Tyson R. Browning & Ernst Fricke & Herbert Negele, 2006. "Key concepts in modeling product development processes," Systems Engineering, John Wiley & Sons, vol. 9(2), pages 104-128, June.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:13:y:2021:i:11:p:5795-:d:559514. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.