IDEAS home Printed from https://ideas.repec.org/a/gam/jjrfmx/v14y2021i6p269-d574405.html
   My bibliography  Save this article

Construction Cash Flow Risk Index

Author

Listed:
  • Hasan Mahmoud

    (Civil Engineering Department, American University of Sharjah, Sharjah 26666, United Arab Emirates
    Industrial Engineering Department, American University of Sharjah, Sharjah 26666, United Arab Emirates)

  • Vian Ahmed

    (Civil Engineering Department, American University of Sharjah, Sharjah 26666, United Arab Emirates
    Industrial Engineering Department, American University of Sharjah, Sharjah 26666, United Arab Emirates)

  • Salwa Beheiry

    (Civil Engineering Department, American University of Sharjah, Sharjah 26666, United Arab Emirates
    Industrial Engineering Department, American University of Sharjah, Sharjah 26666, United Arab Emirates)

Abstract

As investment increases in capital projects, financial risks increase, and cash flow prediction and control become more paramount. Higher risks could hinder project performance and increase the chances of failure in multiple aspects of a project. While there are models that aim to assess and forecast risks in the construction industry, none present a technique to include the impact of risks on a project’s cash flow. Therefore, cash flow forecasts tend to exceed the actual cash flow of a project due to inaccurate risk assessment. Thus, this paper presents the Cash Flow Risk Index (CFRI) development process quantifying the impact of risks on a project’s cash flow from an owner’s perspective. To that end, the study explored the literature to identify the risk factors that might impact a construction projects’ cash flow and uncovered 44 factors. The study also validated and consolidated these factors to build a CFRI via a Delphi exercise, which reduced the factors from 44 to 36. In further iterations, the 36 factors were also shared with 32 construction industry professionals to rate their relative importance on a five-point Likert scale, from which relative importance index and weights were obtained. As a result, the CFRI was developed to measure the impact of different risk factors on a typical construction project’s cash flow.

Suggested Citation

  • Hasan Mahmoud & Vian Ahmed & Salwa Beheiry, 2021. "Construction Cash Flow Risk Index," JRFM, MDPI, vol. 14(6), pages 1-17, June.
  • Handle: RePEc:gam:jjrfmx:v:14:y:2021:i:6:p:269-:d:574405
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/1911-8074/14/6/269/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/1911-8074/14/6/269/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. J. H. M. Tah & V. Carr, 2000. "A proposal for construction project risk assessment using fuzzy logic," Construction Management and Economics, Taylor & Francis Journals, vol. 18(4), pages 491-500.
    2. Jasper Mbachu, 2011. "Sources of contractor’s payment risks and cash flow problems in the New Zealand construction industry: project team’s perceptions of the risks and mitigation measures," Construction Management and Economics, Taylor & Francis Journals, vol. 29(10), pages 1027-1041.
    3. Nguyen, Phong Thanh & Phu Nguyen, Cuong, 2019. "Risk Management in Engineering and Construction," MPRA Paper 103509, University Library of Munich, Germany, revised 09 Jan 2020.
    4. Peter Christoffersen & Silvia Gonçalves, 2004. "Estimation Risk in Financial Risk Management," CIRANO Working Papers 2004s-15, CIRANO.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Tarawneh Sultan & Almahmoud Anoud Fawwaz & Hajjeh Hassan, 2023. "Impact of cash flow variation on project performance: contractors’ perspective," Engineering Management in Production and Services, Sciendo, vol. 15(1), pages 73-85, March.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Gaglianone, Wagner Piazza & Lima, Luiz Renato & Linton, Oliver & Smith, Daniel R., 2011. "Evaluating Value-at-Risk Models via Quantile Regression," Journal of Business & Economic Statistics, American Statistical Association, vol. 29(1), pages 150-160.
    2. Silvia Stanescu & Radu Tunaru, 2013. "Quantifying the uncertainty in VaR and expected shortfall estimates," Chapters, in: Adrian R. Bell & Chris Brooks & Marcel Prokopczuk (ed.), Handbook of Research Methods and Applications in Empirical Finance, chapter 15, pages 357-372, Edward Elgar Publishing.
    3. Genest, Benoit & Cao, Zhili, 2014. "Value-at-Risk in turbulence time," MPRA Paper 62906, University Library of Munich, Germany.
    4. Hartz, Christoph & Mittnik, Stefan & Paolella, Marc S., 2006. "Accurate Value-at-Risk forecast with the (good old) normal-GARCH model," CFS Working Paper Series 2006/23, Center for Financial Studies (CFS).
    5. Hani Alyami & Paul Tae-Woo Lee & Zaili Yang & Ramin Riahi & Stephen Bonsall & Jin Wang, 2014. "An advanced risk analysis approach for container port safety evaluation," Maritime Policy & Management, Taylor & Francis Journals, vol. 41(7), pages 634-650, December.
    6. Alexandros Gabrielsen & Axel Kirchner & Zhuoshi Liu & Paolo Zagaglia, 2015. "Forecasting Value-At-Risk With Time-Varying Variance, Skewness And Kurtosis In An Exponential Weighted Moving Average Framework," Annals of Financial Economics (AFE), World Scientific Publishing Co. Pte. Ltd., vol. 10(01), pages 1-29.
    7. Wasel Shadat, 2011. "On the Nonparametric Tests of Univariate GARCH Regression Models," Economics Discussion Paper Series 1115, Economics, The University of Manchester.
    8. repec:thr:techub:1005:y:2020:i:1:p:185-216 is not listed on IDEAS
    9. Chen, Yi-Hsuan & Tu, Anthony H., 2013. "Estimating hedged portfolio value-at-risk using the conditional copula: An illustration of model risk," International Review of Economics & Finance, Elsevier, vol. 27(C), pages 514-528.
    10. Tien Ha Duong, My & Van Nguyen, Diep & Thanh Nguyen, Phong, 2019. "Using Fuzzy Approach to Model Skill Shortage in Vietnam’s Labor Market in the Context of Industry 4.0," MPRA Paper 103512, University Library of Munich, Germany, revised 07 May 2020.
    11. Gholamreza Dehdasht & Rosli Mohamad Zin & M. Salim Ferwati & Mu’azu Mohammed Abdullahi & Ali Keyvanfar & Ronald McCaffer, 2017. "DEMATEL-ANP Risk Assessment in Oil and Gas Construction Projects," Sustainability, MDPI, vol. 9(8), pages 1-24, August.
    12. International Monetary Fund, 2014. "Switzerland: Technical Note-Systemic Risk and Contagion Analysis," IMF Staff Country Reports 2014/268, International Monetary Fund.
    13. Patricia Romero-Lankao & Daniel M. Gnatz & Olga Wilhelmi & Mary Hayden, 2016. "Urban Sustainability and Resilience: From Theory to Practice," Sustainability, MDPI, vol. 8(12), pages 1-19, November.
    14. Abraham Park & Chen Yu Chang, 2013. "Impacts of Construction Events on the Project Equity Value of the Channel Tunnel Project," ERES eres2013_97, European Real Estate Society (ERES).
    15. Hartz, Christoph & Mittnik, Stefan & Paolella, Marc, 2006. "Accurate value-at-risk forecasting based on the normal-GARCH model," Computational Statistics & Data Analysis, Elsevier, vol. 51(4), pages 2295-2312, December.
    16. Usama H. Issa & Ashraf Balabel & Mohammed Abdelhakeem & Medhat M. A. Osman, 2021. "Developing a Risk Model for Assessment and Control of the Spread of COVID-19," Risks, MDPI, vol. 9(2), pages 1-15, February.
    17. Bauwens Luc & Storti Giuseppe, 2009. "A Component GARCH Model with Time Varying Weights," Studies in Nonlinear Dynamics & Econometrics, De Gruyter, vol. 13(2), pages 1-33, May.
    18. Usama Issa & Ibrahim Sharaky & Mamdooh Alwetaishi & Ashraf Balabel & Amal Shamseldin & Ahmed Abdelhafiz & Mohammed Al-Surf & Mosleh Al-Harthi & Medhat M. A. Osman, 2021. "Developing and Applying a Model for Evaluating Risks Affecting Greening Existing Buildings," Sustainability, MDPI, vol. 13(11), pages 1-21, June.
    19. Sabriye Topal & Emine Atasoylu, 2022. "A Fuzzy Risk Assessment Model for Small Scale Construction Work," Sustainability, MDPI, vol. 14(8), pages 1-17, April.
    20. Cabrera Llanos, Agustín I. & Ortiz Arango, Francisco & Dávila Aragón, Griselda, 2022. "Caracterización de la productividad de una empresa mexicana desarrolladora de tecnología mediante control difuso [Characterization of the productivity of a Mexican technology development company th," Revista de Métodos Cuantitativos para la Economía y la Empresa = Journal of Quantitative Methods for Economics and Business Administration, Universidad Pablo de Olavide, Department of Quantitative Methods for Economics and Business Administration, vol. 34(1), pages 281-304, December.
    21. Nguyen, Phong Thanh & Phu Pham, Cuong & Thanh Phan, Phuong & Bich Vu, Ngoc & Tien Ha Duong, My & Le Hoang Thuy To Nguyen, Quyen, 2020. "Exploring Critical Risk Factors of Office Building Projects," MPRA Paper 109901, University Library of Munich, Germany, revised 30 Dec 2020.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jjrfmx:v:14:y:2021:i:6:p:269-:d:574405. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.