IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v280y2020i2p469-478.html
   My bibliography  Save this article

Optimal production-inventory policy for the multi-period fixed proportions co-production system

Author

Listed:
  • Liu, Hengyu
  • Zhang, Juliang
  • Cheng, T.C.E.
  • Ru, Yihong

Abstract

Consider the multi-period production-inventory problem where a manufacturer purchases and processes a raw material into two products in fixed proportions when facing uncertain demands. In each period, the manufacturer first reviews the on-hand inventories of the products and then decides the purchase/processing quantity of the raw material. After processing the raw material into the end products, the demands of the two products are realized and satisfied by the available inventories. Any leftover inventories are carried to the next period while the unsatisfied demands are backordered. By proving the concavity and submodularity of the expected profit-to-go function, we establish that the one-dimensional produce-up-to policy is optimal. We also study the case where the raw material is seasonal and the manufacturer has only one chance to purchase. Modeling it as a dynamic program, we establish that the one-dimensional produce-down-to policy is optimal. Finally, we conduct numerical studies to examine the impacts of supply-demand balance and price fluctuation on the optimal policy, and derive managerial insights from the analytical findings.

Suggested Citation

  • Liu, Hengyu & Zhang, Juliang & Cheng, T.C.E. & Ru, Yihong, 2020. "Optimal production-inventory policy for the multi-period fixed proportions co-production system," European Journal of Operational Research, Elsevier, vol. 280(2), pages 469-478.
  • Handle: RePEc:eee:ejores:v:280:y:2020:i:2:p:469-478
    DOI: 10.1016/j.ejor.2019.07.025
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377221719305892
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ejor.2019.07.025?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Zhou, Pin & Xu, He & Chen, Jiguang, 2020. "Value of down-conversion policy in a vertical differentiated co-production system," International Journal of Production Economics, Elsevier, vol. 228(C).
    2. Boxi Zuo & Chengqi Peng & Wenying Liu, 2023. "Research on Inventory Simulation of Pulse Supply Chain Based on Controllable Lead Time," International Journal of Science and Business, IJSAB International, vol. 27(1), pages 216-225.
    3. Hezarkhani, Behzad & Demirel, Guven & Bouchery, Yann & Dora, Manoj, 2023. "Can “ugly veg” supply chains reduce food loss?," European Journal of Operational Research, Elsevier, vol. 309(1), pages 117-132.
    4. He, Shuang & Zhang, Jian & Zhang, Juliang & Cheng, T.C.E., 2022. "Production/inventory competition between firms with fixed-proportions co-production systems," European Journal of Operational Research, Elsevier, vol. 299(2), pages 497-509.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:280:y:2020:i:2:p:469-478. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.