IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v176y2007i3p1528-1558.html
   My bibliography  Save this article

A two-level hedging point policy for controlling a manufacturing system with time-delay, demand uncertainty and extra capacity

Author

Listed:
  • Chan, Felix T.S.
  • Wang, Zheng
  • Zhang, Jie

Abstract

No abstract is available for this item.

Suggested Citation

  • Chan, Felix T.S. & Wang, Zheng & Zhang, Jie, 2007. "A two-level hedging point policy for controlling a manufacturing system with time-delay, demand uncertainty and extra capacity," European Journal of Operational Research, Elsevier, vol. 176(3), pages 1528-1558, February.
  • Handle: RePEc:eee:ejores:v:176:y:2007:i:3:p:1528-1558
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(05)00862-3
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Wang, Xiao Fan & Chen, Guanrong, 2002. "Pinning control of scale-free dynamical networks," Physica A: Statistical Mechanics and its Applications, Elsevier, vol. 310(3), pages 521-531.
    2. Frayret, Jean-Marc & D&rsquo & Amours, Sophie & Montreuil, Benoit & Cloutier, Louis, 2001. "A network approach to operate agile manufacturing systems," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 239-259, December.
    3. T. Bielecki & P. R. Kumar, 1988. "Optimality of Zero-Inventory Policies for Unreliable Manufacturing Systems," Operations Research, INFORMS, vol. 36(4), pages 532-541, August.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Bricha, Naji & Nourelfath, Mustapha, 2014. "Extra-capacity versus protection for supply networks under attack," Reliability Engineering and System Safety, Elsevier, vol. 131(C), pages 185-196.
    2. Behnamfar, Reza & Sajadi, Seyed Mojtaba & Tootoonchy, Mahshid, 2022. "Developing environmental hedging point policy with variable demand: A machine learning approach," International Journal of Production Economics, Elsevier, vol. 254(C).
    3. Zhiyang Jia & Liang Zhang & Jorge Arinez & Guoxian Xiao, 2016. "Performance analysis for serial production lines with Bernoulli Machines and Real-time WIP-based Machine switch-on/off control," International Journal of Production Research, Taylor & Francis Journals, vol. 54(21), pages 6285-6301, November.
    4. Bricha, Naji & Nourelfath, Mustapha, 2015. "Protection of warehouses and plants under capacity constraint," Reliability Engineering and System Safety, Elsevier, vol. 138(C), pages 93-104.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Xiang Li, 2017. "Optimal procurement strategies from suppliers with random yield and all-or-nothing risks," Annals of Operations Research, Springer, vol. 257(1), pages 167-181, October.
    2. Pi, Xiaochen & Tang, Longkun & Chen, Xiangzhong, 2021. "A directed weighted scale-free network model with an adaptive evolution mechanism," Physica A: Statistical Mechanics and its Applications, Elsevier, vol. 572(C).
    3. T. Botmart & N. Yotha & P. Niamsup & W. Weera, 2017. "Hybrid Adaptive Pinning Control for Function Projective Synchronization of Delayed Neural Networks with Mixed Uncertain Couplings," Complexity, Hindawi, vol. 2017, pages 1-18, August.
    4. Wenle Zhang & Jianchang Liu, 2016. "Ultra-fast consensus of discrete-time multi-agent systems with multi-step predictive output feedback," International Journal of Systems Science, Taylor & Francis Journals, vol. 47(6), pages 1465-1479, April.
    5. B. Khoury, 2009. "A discrete approach to designing optimal hedging-point control policies for production-inventory systems with general stochastic behavior," Computational Management Science, Springer, vol. 6(4), pages 399-409, October.
    6. Barış Tan, 2019. "Production Control with Price, Cost, and Demand Uncertainty," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(4), pages 1057-1085, December.
    7. Miao, Qingying & Rong, Zhihai & Tang, Yang & Fang, Jianan, 2008. "Effects of degree correlation on the controllability of networks," Physica A: Statistical Mechanics and its Applications, Elsevier, vol. 387(24), pages 6225-6230.
    8. Wang, Fei & Yang, Yongqing & Hu, Manfeng & Xu, Xianyun, 2015. "Projective cluster synchronization of fractional-order coupled-delay complex network via adaptive pinning control," Physica A: Statistical Mechanics and its Applications, Elsevier, vol. 434(C), pages 134-143.
    9. Yunlong Wu & Qian Zhao & Hui Li, 2018. "Synchronization of directed complex networks with uncertainty and time-delay," International Journal of Distributed Sensor Networks, , vol. 14(5), pages 15501477187, May.
    10. Yan, Jiaye & Zhou, Jiaying & Wu, Zhaoyan, 2019. "Structure identification of unknown complex-variable dynamical networks with complex coupling," Physica A: Statistical Mechanics and its Applications, Elsevier, vol. 525(C), pages 256-265.
    11. B C Giri & T Dohi, 2005. "Exact formulation of stochastic EMQ model for an unreliable production system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(5), pages 563-575, May.
    12. Jingfu Huang & Gaoke Wu & Yiju Wang, 2021. "Retailer’s Emergency Ordering Policy When Facing an Impending Supply Disruption," Sustainability, MDPI, vol. 13(13), pages 1-21, June.
    13. S. P. Sethi & W. Suo & M. I. Taksar & Q. Zhang, 1997. "Optimal Production Planning in a Stochastic Manufacturing System with Long-Run Average Cost," Journal of Optimization Theory and Applications, Springer, vol. 92(1), pages 161-188, January.
    14. Gharbi, A. & Pellerin, R. & Sadr, J., 2008. "Production rate control for stochastic remanufacturing systems," International Journal of Production Economics, Elsevier, vol. 112(1), pages 37-47, March.
    15. Li, Chunguang & Chen, Guanrong, 2004. "Synchronization in general complex dynamical networks with coupling delays," Physica A: Statistical Mechanics and its Applications, Elsevier, vol. 343(C), pages 263-278.
    16. Taleizadeh, Ata Allah & Cárdenas-Barrón, Leopoldo Eduardo & Mohammadi, Babak, 2014. "A deterministic multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing process," International Journal of Production Economics, Elsevier, vol. 150(C), pages 9-27.
    17. Yi, Chengbo & Feng, Jianwen & Wang, Jingyi & Xu, Chen & Zhao, Yi, 2017. "Synchronization of delayed neural networks with hybrid coupling via partial mixed pinning impulsive control," Applied Mathematics and Computation, Elsevier, vol. 312(C), pages 78-90.
    18. Süleyman Demirel & Roman Kapuscinski & Man Yu, 2018. "Strategic Behavior of Suppliers in the Face of Production Disruptions," Management Science, INFORMS, vol. 64(2), pages 533-551, February.
    19. Francis De Vericourt & Fikri Karaesmen & Yves Dallery, 2000. "Dynamic Scheduling in a Make-to-Stock System: A Partial Characterization of Optimal Policies," Operations Research, INFORMS, vol. 48(5), pages 811-819, October.
    20. Om Prakash & A.R. Roy & A. Goswami, 2014. "Stochastic manufacturing system with process deterioration and machine breakdown," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(12), pages 2539-2551, December.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:176:y:2007:i:3:p:1528-1558. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.