IDEAS home Printed from https://ideas.repec.org/h/spr/sprchp/978-981-15-8892-1_132.html
   My bibliography  Save this book chapter

Design and Application of Prefabricated Substation Based on BIM Technology

In: Proceedings of the 24th International Symposium on Advancement of Construction Management and Real Estate

Author

Listed:
  • Clyde Zhengdao Li

    (Shenzhen University)

  • Zhe Chen

    (Shenzhen University)

  • Yiyu Zhao

    (Shenzhen University)

  • Meizhuan Zhou

    (Shenzhen University)

  • Limei Zhang

    (Shenzhen University)

Abstract

As the core of advanced digital management application technology, BIM is widely used in various infrastructure construction. Prefabricated assembly substation uses advanced, reliable and environmentally friendly intelligent modular units to form an intensive closed substation. It takes digitization, networking and standardization of information as its basic requirements. Compared with conventional substation, it occupies less space, has shorter construction period, lower cost, no noise and no detection. Radiation-free and maintenance-free environment-friendly intelligent substation. A real digital information model of the whole substation depth is established by combining the Internet, big data, IoT and the construction process. Decomposition is performed in accordance with construction management and control steps to achieve model construction growth, according to Gantt chart schedule. The corresponding mechanism between the 2D code scan and the model is established, and the relationship between the digital model and the real nodes in the construction process is implemented. The life cycle of power transmission and transformation projects is facilitated by establishing appropriate management and control platform and developing the functional modules of the app. The Building Information Modeling technology is used to accurately calculate project quantities, strengthen the management and control of material cost information, provide efficient engineering quantities calculation and reduce cost. Based on the prefabricated assembly substation of 110 kV Longhua Center, this paper gives the corresponding case introduction and promotion suggestions from the aspects of prefabricated component production, assembly construction, information management technology and so on, aiming at applying it to the construction management stage of the substation industrialization project.

Suggested Citation

  • Clyde Zhengdao Li & Zhe Chen & Yiyu Zhao & Meizhuan Zhou & Limei Zhang, 2021. "Design and Application of Prefabricated Substation Based on BIM Technology," Springer Books, in: Gui Ye & Hongping Yuan & Jian Zuo (ed.), Proceedings of the 24th International Symposium on Advancement of Construction Management and Real Estate, pages 1889-1907, Springer.
  • Handle: RePEc:spr:sprchp:978-981-15-8892-1_132
    DOI: 10.1007/978-981-15-8892-1_132
    as

    Download full text from publisher

    To our knowledge, this item is not available for download. To find whether it is available, there are three options:
    1. Check below whether another version of this item is available online.
    2. Check on the provider's web page whether it is in fact available.
    3. Perform a search for a similarly titled item that would be available.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:sprchp:978-981-15-8892-1_132. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.