IDEAS home Printed from https://ideas.repec.org/h/era/chaptr/2015-rpr-16-2.html
   My bibliography  Save this book chapter

Road Map for Power Market Integration in the Brunei-Indonesia-Malaysia-Philippines (BIMP) Region

In: Achieving an Integrated Electricity Market in Southeast Asia: Addressing the Economic, Technical, Institutional, and Geo-political Barriers

Author

Listed:
  • Romeo Pacudan

Abstract

The research is divided into four interdependent research clusters. Clusters 1 and 2 apply case studies on the BIMP countries (Brunei-Indonesia-Malaysia-Philippines) using different methods. Cluster 1, led by the Institute of Energy Economics, Japan, conducts dynamic linear programming model to simulate the development of power infrastructure, interconnection, and exchange of power in this subregion of ASEAN. It emphasises the economic rationale and feasibility of electricity market integration in the region. Cluster 2, led by the Brunei National Energy Research Institute, focuses on the regulatory, institutional, and technical barriers in BIMP, and develops a road map to solve these issues. This study thus gives some insight regarding regional specific barriers or issues for other regions based on an established understanding of the common issues in principle from previous studies. Cluster 3 is conducted jointly by the Economic Research Institute for ASEAN and East Asia and the Energy Research Institute at Nanyang Technological University. The study mainly refers to the Nordic and European cases of electricity market integration and analyses both their business models and overall market design for grid interconnection and cross-border trading of electricity. In doing so, the study eventually tries to deliver implications on the possible business model and market design for ASEAN. The Cluster 4 study, carried out by a researcher from the University of Western Australia, discusses political and institutional barriers to the formation of an integrated ASEAN electricity market and derives several practical strategies in addressing such barriers as policy implications.

Suggested Citation

  • Romeo Pacudan, 2016. "Road Map for Power Market Integration in the Brunei-Indonesia-Malaysia-Philippines (BIMP) Region," Chapters, in: Yanfei Li & Shigeru Kimura (ed.), Achieving an Integrated Electricity Market in Southeast Asia: Addressing the Economic, Technical, Institutional, and Geo-political Barriers, chapter 2, pages 41-58, Economic Research Institute for ASEAN and East Asia (ERIA).
  • Handle: RePEc:era:chaptr:2015-rpr-16-2
    as

    Download full text from publisher

    File URL: http://www.eria.org/RPR_FY2015_No.16_Chapter_2.pdf
    Download Restriction: no
    ---><---

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:era:chaptr:2015-rpr-16-2. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Ranti Amelia (email available below). General contact details of provider: https://edirc.repec.org/data/eriadid.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.