Method of planning construction projects, taking into account risk factors
Abstract
This paper presents an original method of planning construction projects, taking into account the influence of potential risk factors. The method is called the Method of Construction Risk Assessment (MOCRA). According to this method, first the material-financial plan of a project (a construction project in the example provided) is analyzed. Then risk factors are identified, taking into account the project’s specificity. The end result of this stage is a list of risk factors. In the third stage the risk is reduced or minimized where possible. Finally, the specified risk factors are quantified, which is a difficult task. The effectiveness of the risk assessment depends on how thoroughly this task is carried out. Since point scale assessment of risk does not appeal to engineers, in MOCRA quantified risk is allocated in the material-financial plan. Thanks to this, one can prepare contingency plans, i.e. plans (action variants) to be implemented when particular risk factors occur. Having completed the project, one can use MOCRA to check the accuracy of the assessment (forecast) and select the best contingency action variant, whereby the method’s effectiveness in planning future projects is improved.Download Info
If you experience problems downloading a file, check if you have the proper application to view it first. In case of further problems read the IDEAS help page. Note that these files are not on the IDEAS site. Please be patient as the files may be large.Bibliographic Info
Article provided by Wroclaw University of Technology, Institute of Organization and Management in its journal Operations Research and Decisions.
Volume (Year): 3 (2009)
Issue (Month): ()
Pages: 119-128
Download reference. The following formats are available: HTML
(with abstract),
plain text
(with abstract),
BibTeX,
RIS (EndNote, RefMan, ProCite),
ReDIF
Handle: RePEc:wut:journl:v:3:y:2009:p:119-128
Contact details of provider:
Email:
Web page: http://www.ioz.pwr.wroc.pl/boid/
More information through EDIRC
For corrections or technical questions regarding this item, or to correct its listing, contact: (Ewelina Czykirska).
Related research
Keywords: risk; scheduling; construction project;References
No references listed on IDEASYou can help add them by filling out this form.
Citations
Lists
This item is not listed on Wikipedia, on a reading list or among the top items on IDEAS.Statistics
Access and download statisticsCorrections
When requesting a correction, please mention this item's handle: RePEc:wut:journl:v:3:y:2009:p:119-128For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: (Ewelina Czykirska).
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If references are entirely missing, you can add them using this form.
If the full references list an item that is present in RePEc, but the system did not link to it, you can help with this form.
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your profile, as there may be some citations waiting for confirmation.
Please note that corrections may take a couple of weeks to filter through the various RePEc services.