IDEAS home Printed from https://ideas.repec.org/a/wly/syseng/v14y2011i1p17-28.html
   My bibliography  Save this article

Risk‐based multiobjective resource allocation in hierarchical systems with multiple decisionmakers. Part II. A case study

Author

Listed:
  • Zhenyu Yan
  • Yacov Y. Haimes

Abstract

This paper demonstrates an application of the Multiobjective Multi‐decisionmaker Resource Allocation (MOMDRA) risk management framework proposed in Part I. A case study of a pumping system, which is a critical component of the hurricane protection system, in the greater New Orleans area during the Katrina event, is discussed. Based on the MOMDRA methodology, the case study models how pumping capacity might be allocated during the initial construction or subsequent enhancement of a pumping system as a multiobjective resource allocation process for managing hurricane risks. Pareto optimal risk management alternatives are generated, and tradeoff analyses are performed across different levels of decisionmakers. The case study demonstrates the applicability and effectiveness of the MOMDRA methodology in risk‐based modeling and management of real‐world large‐scale systems. © 2010 Wiley Periodicals, Inc. Syst Eng 14: 17–28, 2011

Suggested Citation

  • Zhenyu Yan & Yacov Y. Haimes, 2011. "Risk‐based multiobjective resource allocation in hierarchical systems with multiple decisionmakers. Part II. A case study," Systems Engineering, John Wiley & Sons, vol. 14(1), pages 17-28, March.
  • Handle: RePEc:wly:syseng:v:14:y:2011:i:1:p:17-28
    DOI: 10.1002/sys.20160
    as

    Download full text from publisher

    File URL: https://doi.org/10.1002/sys.20160
    Download Restriction: no

    File URL: https://libkey.io/10.1002/sys.20160?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Dengsheng Wu & Xiaoqian Zhu & Jie Wan & Chunbing Bao & Jianping Li, 2019. "A Multiobjective Optimization Approach for Selecting Risk Response Strategies of Software Project: From the Perspective of Risk Correlations," International Journal of Information Technology & Decision Making (IJITDM), World Scientific Publishing Co. Pte. Ltd., vol. 18(01), pages 339-364, January.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:syseng:v:14:y:2011:i:1:p:17-28. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6858 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.