The two‐machine permutation flow shop with state‐dependent processing times

Author

Listed:
  • E. Wagneur
  • C. Sriskandarajah

Abstract

If the processing time of each job in a flow shop also depends on the time spent prior to processing, then the choice of a sequence influences processing times. This nonstandard scheduling problem is studied here for the minimum makespan schedule in a flow shop with two machines. The problem is NP‐hard in the strong sense and already contains the main features of the general case [10]. Restricting to the case of permutation schedules, we first determine the optimal release times of the jobs for a given sequence. Permutation schedules are evaluated for this optimal policy, and the scheduling problem is solved using branch‐and‐bound techniques. We also show the surprising result that the optimal schedule may not be a permutation schedule. Numerical results on randomly generated data are provided for permutation schedules. Our numerical results confirm our preliminary study [10] that fairly good approximate solutions can efficiently be obtained in the case of limited computing time using the heuristics due to Gilmore and Gomory [7]. © 1993 John Wiley & Sons, Inc.

Suggested Citation

  • E. Wagneur & C. Sriskandarajah, 1993. "The two‐machine permutation flow shop with state‐dependent processing times," Naval Research Logistics (NRL), John Wiley & Sons, vol. 40(5), pages 697-717, August.
  • Handle: RePEc:wly:navres:v:40:y:1993:i:5:p:697-717
    DOI: 10.1002/1520-6750(199308)40:53.0.CO;2-V
    as

    Download full text from publisher

    File URL: https://doi.org/10.1002/1520-6750(199308)40:53.0.CO;2-V
    Download Restriction: no

    File URL: https://libkey.io/10.1002/1520-6750(199308)40:53.0.CO;2-V?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Moshe Dror & Helman I. Stern & Jan Karel Lenstra, 1987. "Parallel Machine Scheduling: Processing Rates Dependent on Number of Jobs in Operation," Management Science, INFORMS, vol. 33(8), pages 1001-1009, August.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Bahram Alidaee & Haibo Wang & R. Bryan Kethley & Frank Landram, 2019. "A unified view of parallel machine scheduling with interdependent processing rates," Journal of Scheduling, Springer, vol. 22(5), pages 499-515, October.
    2. Yanıkoğlu, İhsan & Yavuz, Tonguc, 2022. "Branch-and-price approach for robust parallel machine scheduling with sequence-dependent setup times," European Journal of Operational Research, Elsevier, vol. 301(3), pages 875-895.
    3. Jozefowska, Joanna & Weglarz, Jan, 1998. "On a methodology for discrete-continuous scheduling," European Journal of Operational Research, Elsevier, vol. 107(2), pages 338-353, June.
    4. Fündeling, C.-U. & Trautmann, N., 2010. "A priority-rule method for project scheduling with work-content constraints," European Journal of Operational Research, Elsevier, vol. 203(3), pages 568-574, June.
    5. Gorczyca, Mateusz & Janiak, Adam, 2010. "Resource level minimization in the discrete-continuous scheduling," European Journal of Operational Research, Elsevier, vol. 203(1), pages 32-41, May.
    6. Joanna Józefowska & Mariusz Nowak & Rafał Różycki & Grzegorz Waligóra, 2022. "Survey on Optimization Models for Energy-Efficient Computing Systems," Energies, MDPI, vol. 15(22), pages 1-20, November.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:navres:v:40:y:1993:i:5:p:697-717. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6750 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.