IDEAS home Printed from https://ideas.repec.org/a/vrs/otamic/v12y2020i1p2095-2108n13.html
   My bibliography  Save this article

Demystifying progressive design build: implementation issues and lessons learned through case study analysis

Author

Listed:
  • Shang Luming

    (Department of Construction Management, The University of Washington, Seattle, WA, USA)

  • Migliaccio Giovanni C.

    (Department of Construction Management, The University of Washington, Seattle, WA, USA)

Abstract

The design–build (DB) project delivery method has been used for several decades in the US construction market. DB contracts are usually awarded on the basis of a multicriteria evaluation, with price as one of the most salient criteria. To ensure the project’s success, an owner usually has to invest enough time and effort during scoping and early design to define a program, scope, and budget, ready for procurement and price generation. However, this process can become a burden for the owner and may lengthen the project development duration. As an alternative to the traditional DB, the progressive design–build (PDB) approach permits the selection of the DB team prior to defining the project program and/or budget. PDB has the advantage of maintaining a single point of accountability and allowing team selection based mainly on qualifications, with a limited consideration of price. Under PDB, the selected team works with the project stakeholders during the early design stage, while helping the owner balance scope and budget. However, the key to the effectiveness of PDB is its provision for the ongoing and complete involvement of the owner in the early design phase. Due to the differences between PDB and the other project delivery methods (e.g., traditional DB), project teams must carefully consider several factors to ensure its successful implementation. The research team conducted a case study of the University of Washington’s pilot PDB project to complete the West Campus Utility Plant (WCUP). This paper carefully explores and summarizes the project’s entire delivery process (e.g., planning, solicitation, design, and construction), its organizational structures, and the project performance outcomes. The lessons learned from the WCUP project will contribute to best practices for future PDB implementation.

Suggested Citation

  • Shang Luming & Migliaccio Giovanni C., 2020. "Demystifying progressive design build: implementation issues and lessons learned through case study analysis," Organization, Technology and Management in Construction, Sciendo, vol. 12(1), pages 2095-2108, January.
  • Handle: RePEc:vrs:otamic:v:12:y:2020:i:1:p:2095-2108:n:13
    DOI: 10.2478/otmcj-2020-0006
    as

    Download full text from publisher

    File URL: https://doi.org/10.2478/otmcj-2020-0006
    Download Restriction: no

    File URL: https://libkey.io/10.2478/otmcj-2020-0006?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:vrs:otamic:v:12:y:2020:i:1:p:2095-2108:n:13. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Peter Golla (email available below). General contact details of provider: https://www.sciendo.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.