IDEAS home Printed from https://ideas.repec.org/a/vrs/otamic/v10y2018i1p1778-1793n13.html
   My bibliography  Save this article

Analysis of Rework Risk Triggers in the Nigerian Construction Industry

Author

Listed:
  • Eze Emmanuel Chidiebere

    (Department of Quantity Surveying, Federal University of Technology Minna, Niger State,Minna, Nigeria)

Abstract

The construction industry plays a significant role in the infrastructure development of many countries. Construction projects suffer from a lot of setbacks despite sophistication and advancement in technology and pro­fessionalism. This study, therefore, assessed the factors that triggered the emergence of rework and the benefits derived from eliminating such triggers in the Nigerian construction industry. The study adopted a quantitative survey approach in which a structured questionnaire was adopted as the research instrument. Factor analysis using principal component analysis was adopted to determine the factors that triggered the rework and the pattern of relationship that existed amongst the factors; relative importance index (RII) was used to assess the benefits of eliminating rework triggers. The study concluded that the factors that triggered the emergence of rework were omis­sion and planning issues, change issues, funding and communication issues, and poor workers and resource control. Repeat patronage, higher productivity, and reduced delivery time reduced the rework and waste and improved the employee job satisfaction and morale; they were the benefits derived from eliminating rework trig­gers. It was recommended that there is a need for clarity, effectiveness, and timeliness of instruction and informa­tion dissemination amongst project participants and the participation of contractors, subcontractors, and other stakeholders at the design stages to avoid omissions and construction changes

Suggested Citation

  • Eze Emmanuel Chidiebere, 2018. "Analysis of Rework Risk Triggers in the Nigerian Construction Industry," Organization, Technology and Management in Construction, Sciendo, vol. 10(1), pages 1778-1793, August.
  • Handle: RePEc:vrs:otamic:v:10:y:2018:i:1:p:1778-1793:n:13
    DOI: 10.2478/otmcj-2018-0008
    as

    Download full text from publisher

    File URL: https://doi.org/10.2478/otmcj-2018-0008
    Download Restriction: no

    File URL: https://libkey.io/10.2478/otmcj-2018-0008?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. P. E. D. Love & P. Mandal & H. Li, 1999. "Determining the causal structure of rework influences in construction," Construction Management and Economics, Taylor & Francis Journals, vol. 17(4), pages 505-517.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Hosang Hyun & Hyunsoo Kim & Hyun-Soo Lee & Moonseo Park & Jeonghoon Lee, 2020. "Integrated Design Process for Modular Construction Projects to Reduce Rework," Sustainability, MDPI, vol. 12(2), pages 1-19, January.
    2. Fatemeh Mostofi & Vedat Toğan & Yunus Emre Ayözen & Onur Behzat Tokdemir, 2022. "Predicting the Impact of Construction Rework Cost Using an Ensemble Classifier," Sustainability, MDPI, vol. 14(22), pages 1-19, November.
    3. Woong-Gi Kim & Namhyuk Ham & Jae-Jun Kim, 2021. "Enhanced Subcontractors Allocation for Apartment Construction Project Applying Conceptual 4D Digital Twin Framework," Sustainability, MDPI, vol. 13(21), pages 1-21, October.
    4. Ramin Ansari & Mohammad Khalilzadeh & Roohollah Taherkhani & Jurgita Antucheviciene & Darius Migilinskas & Shohreh Moradi, 2022. "Performance Prediction of Construction Projects Based on the Causes of Claims: A System Dynamics Approach," Sustainability, MDPI, vol. 14(7), pages 1-19, March.
    5. Yehiel Rosenfeld, 2009. "Cost of quality versus cost of non-quality in construction: the crucial balance," Construction Management and Economics, Taylor & Francis Journals, vol. 27(2), pages 107-117.
    6. Hossein Kiani & Seyed Hossein Hosseini & Farshid Abdi, 2018. "A Model to Investigate the Effect of Work Ethic Culture on Dynamics of Rework in Management of Projects," Interdisciplinary Description of Complex Systems - scientific journal, Croatian Interdisciplinary Society Provider Homepage: http://indecs.eu, vol. 16(1), pages 40-59.
    7. Jahangirian, Mohsen & Eldabi, Tillal & Naseer, Aisha & Stergioulas, Lampros K. & Young, Terry, 2010. "Simulation in manufacturing and business: A review," European Journal of Operational Research, Elsevier, vol. 203(1), pages 1-13, May.
    8. Zezhou Wu & Kaijie Yang & Xiaofan Lai & Maxwell Fordjour Antwi-Afari, 2020. "A Scientometric Review of System Dynamics Applications in Construction Management Research," Sustainability, MDPI, vol. 12(18), pages 1-16, September.
    9. Ewelina Kania & Elżbieta Radziszewska-Zielina & Grzegorz Śladowski, 2020. "Communication and Information Flow in Polish Construction Projects," Sustainability, MDPI, vol. 12(21), pages 1-23, November.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:vrs:otamic:v:10:y:2018:i:1:p:1778-1793:n:13. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Peter Golla (email available below). General contact details of provider: https://www.sciendo.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.