IDEAS home Printed from https://ideas.repec.org/a/taf/uiiexx/v46y2014i10p1050-1065.html
   My bibliography  Save this article

The variable sampling interval control chart for finite-horizon processes

Author

Listed:
  • George Nenes
  • Philippe Castagliola
  • Giovanni Celano
  • Sofia Panagiotidou

Abstract

The requirement to be globally competitive requires companies to have a high level of flexibility to allow for the production of a large variety of products. To limit work-in-process, decision makers periodically schedule according to a make-to-order management strategy i.e. the production of finite batches of the same product code. Scheduling calls for frequent set up activities, which require the reconfiguration of a manufacturing process, and allows manufacturers to switch between different codes. This can limit the production horizon of one product code to a few hours or shifts. In this context, efficient online quality control monitoring using control charts is strategic to eliminate scrap or rework and to meet the demand at the time specified by the production plan. The design of control charts for a process with a limited production horizon is a challenge for statistical process control practitioners. Under this framework, this article investigates the issues related to the implementation of the Variable Sampling Interval (VSI) Shewhart control chart in a process with finite production horizon. When the production horizon is finite, the statistical properties of a control chart are known to be a function of the number of scheduled inspections. In the case of a VSI control chart, the quality practitioner cannot fix the number of inspections a priori due to the stochastic nature of the sampling interval selection. Therefore, the aim of this article is to propose a new Markov chain approach for the exact computation of the statistical performance of the VSI control chart in processes with an unknown and finite number of inspections. The proposed approach is general and does not depend on the monitored sample statistic. With reference to the process mean monitoring, an extensive numerical analysis compares the performance of the VSI X‾$\skew5\bar X $ chart to the Variable Sample Size and Fixed Sampling Rate z charts. Numerical results show that the VSI X‾$\skew5\bar X $ chart outperforms other charts for moderate to large shift sizes. An illustrative example shows the implementation of the VSI X‾$\skew5\bar X $ chart in a short run producing a finite batch of mechanical parts.

Suggested Citation

  • George Nenes & Philippe Castagliola & Giovanni Celano & Sofia Panagiotidou, 2014. "The variable sampling interval control chart for finite-horizon processes," IISE Transactions, Taylor & Francis Journals, vol. 46(10), pages 1050-1065, October.
  • Handle: RePEc:taf:uiiexx:v:46:y:2014:i:10:p:1050-1065
    DOI: 10.1080/0740817X.2013.876128
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/0740817X.2013.876128
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/0740817X.2013.876128?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Asma Amdouni & Philippe Castagliola & Hassen Taleb & Giovanni Celano, 2017. "A variable sampling interval Shewhart control chart for monitoring the coefficient of variation in short production runs," International Journal of Production Research, Taylor & Francis Journals, vol. 55(19), pages 5521-5536, October.
    2. Chenglong Li & Qin Su & Min Xie, 2016. "Economic modelling for statistical process control subject to a general quality deterioration," International Journal of Production Research, Taylor & Francis Journals, vol. 54(6), pages 1753-1770, March.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:uiiexx:v:46:y:2014:i:10:p:1050-1065. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/uiie .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.