Advanced Search
MyIDEAS: Login

Prediction of schedule performance of Indian construction projects using an artificial neural network

Contents:

Author Info

  • Kumar Neeraj Jha
  • CT Chockalingam
Registered author(s):

    Abstract

    Approximately 42% of Indian government-funded construction projects are facing time overruns. With a number of challenging projects around the corner, there is a definite need to overcome these delays. In an earlier study conducted by one of the authors, 55 project performance attributes were identified based on expert opinions and literature surveys, which were subsequently reduced to 20 factors (11 success and nine failure factors) using factor analysis. A second-stage questionnaire survey based on these factors was used to identify the significant schedule performance factors. The analysis of the survey responses led us to conclude that factors such as: a project manager’s competence; monitoring and feedback by project participants; commitment of all project participants; owner’s competence; interaction between external project participants; and good coordination between project participants significantly affect schedule performance. The survey also provided the basis for the development of a schedule performance prediction model. For this, an artificial neural network (ANN) method was used to construct the model, and the best was determined to be a 6-3-1 feed-forward neural network based on a back-propagation algorithm with a mean absolute percentage deviation (MAPD) of 11%. This enables project team members to understand the factors they must monitor closely in order to complete the projects on schedule and to predict performance throughout the course of the project.

    Download Info

    If you experience problems downloading a file, check if you have the proper application to view it first. In case of further problems read the IDEAS help page. Note that these files are not on the IDEAS site. Please be patient as the files may be large.
    File URL: http://hdl.handle.net/10.1080/01446193.2011.608691
    Download Restriction: Access to full text is restricted to subscribers.

    As the access to this document is restricted, you may want to look for a different version under "Related research" (further below) or search for a different version of it.

    Bibliographic Info

    Article provided by Taylor & Francis Journals in its journal Construction Management and Economics.

    Volume (Year): 29 (2011)
    Issue (Month): 9 (July)
    Pages: 901-911

    as in new window
    Handle: RePEc:taf:conmgt:v:29:y:2011:i:9:p:901-911

    Contact details of provider:
    Web page: http://www.tandfonline.com/RCME20

    Order Information:
    Web: http://www.tandfonline.com/pricing/journal/RCME20

    Related research

    Keywords:

    References

    No references listed on IDEAS
    You can help add them by filling out this form.

    Citations

    Lists

    This item is not listed on Wikipedia, on a reading list or among the top items on IDEAS.

    Statistics

    Access and download statistics

    Corrections

    When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:29:y:2011:i:9:p:901-911. See general information about how to correct material in RePEc.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: (Michael McNulty).

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If references are entirely missing, you can add them using this form.

    If the full references list an item that is present in RePEc, but the system did not link to it, you can help with this form.

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your profile, as there may be some citations waiting for confirmation.

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.