Advanced Search
MyIDEAS: Login

A case study of activity-based costing in allocating rebar fabrication costs to projects

Contents:

Author Info

  • Yong-Woo Kim
  • Seungheon Han
  • Sungwon Shin
  • Kunhee Choi
Registered author(s):

    Abstract

    How to improve cost allocation for reinforced steel bar (rebar) is an ongoing topic of debate among construction manufacturers and contractors. Traditionally, many fabrication shops have used a single overhead-cost pool accounting system. However, a new costing method, activity-based costing (ABC), may provide more advantages than the traditional system. In this case study, a single overhead-cost pool system is compared with the ABC method to demonstrate how ABC improves cost allocation and provides other benefits. The case study findings indicate that ABC provides such benefits as (1) accurate manufacturing costs; (2) cost information on processes; and (3) information on cost drivers. This paper also bridges the construction and cost accounting literature. Our study contributes to the construction management literature by offering a different cost allocation method to refine fabrication costs assigned to projects. The findings are expected to serve as a reference for industry professionals who recognize the shortcomings of a traditional single overhead-cost pool system and are in need of a more accurate costing system.

    Download Info

    If you experience problems downloading a file, check if you have the proper application to view it first. In case of further problems read the IDEAS help page. Note that these files are not on the IDEAS site. Please be patient as the files may be large.
    File URL: http://www.tandfonline.com/doi/abs/10.1080/01446193.2011.570354
    Download Restriction: Access to full text is restricted to subscribers.

    As the access to this document is restricted, you may want to look for a different version under "Related research" (further below) or search for a different version of it.

    Bibliographic Info

    Article provided by Taylor & Francis Journals in its journal Construction Management and Economics.

    Volume (Year): 29 (2011)
    Issue (Month): 5 ()
    Pages: 449-461

    as in new window
    Handle: RePEc:taf:conmgt:v:29:y:2011:i:5:p:449-461

    Contact details of provider:
    Web page: http://www.tandfonline.com/RCME20

    Order Information:
    Web: http://www.tandfonline.com/pricing/journal/RCME20

    Related research

    Keywords: Rebar fabrication; activity-based costing; overhead cost allocation;

    References

    No references listed on IDEAS
    You can help add them by filling out this form.

    Citations

    Lists

    This item is not listed on Wikipedia, on a reading list or among the top items on IDEAS.

    Statistics

    Access and download statistics

    Corrections

    When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:29:y:2011:i:5:p:449-461. See general information about how to correct material in RePEc.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: (Michael McNulty).

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If references are entirely missing, you can add them using this form.

    If the full references list an item that is present in RePEc, but the system did not link to it, you can help with this form.

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your profile, as there may be some citations waiting for confirmation.

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.