The accuracy of pre-tender building cost estimates in Australia

Author info | Abstract | Publisher info | Download info | Related research | Statistics
Author Info
Ajibade Ayodeji Aibinu
Thomas Pasco
Abstract

A pre-tender building cost estimate is an important piece of information when making decisions at the project planning and design stage. The important project characteristics influencing the accuracy of pre-tender building cost estimates are examined and practical improvement for increasing the accuracy of estimates are considered. A quantitative approach is used to address the research problem. Analysis of data from 56 projects and from a postal questionnaire survey of 102 quantity surveying firms suggests that the accuracy of pre-tender building cost estimates varies according to project size and principal structural material. When eight identified project characteristics are controlled in a multiple regression analysis, the accuracy of estimates is influenced by project size. The estimates of smaller projects are more biased than the estimates of larger projects. It was discovered that pre-tender building costs are more often overestimated than are underestimated. Overestimated forecasts are incorrect by a larger amount than underestimated forecasts. Data analysis also revealed that the accuracy of pre-tender building cost estimates has not improved over time. The majority of the respondents are somewhat dissatisfied with the accuracy of estimates in the industry. Probability estimation and simulation of past estimates, reducing quantity surveying and cost engineering skill turnover, incorporating market sentiments into estimates, early involvement of the quantity surveyor at the brief stage, and proper documentation of experience gained in the estimation of projects should help firms increase the accuracy of estimates for new projects.

Download Info
To download:

If you experience problems downloading a file, check if you have the proper application to view it first. Information about this may be contained in the File-Format links below. In case of further problems read the IDEAS help page. Note that these files are not on the IDEAS site. Please be patient as the files may be large.

File URL: http://www.informaworld.com/openurl?genre=article&doi=10.1080/01446190802527514&magic=repec&7C&7C8674ECAB8BB840C6AD35DC6213A474B5
File Format: text/html
File Function:
Download Restriction: Access to full text is restricted to subscribers.

As the access to this document is restricted, you may want to look for a different version under "Related research" (further below) or search for a different version of it.

Publisher Info
Article provided by Taylor and Francis Journals in its journal Construction Management and Economics.

Volume (Year): 26 (2008)
Issue (Month): 12 ()
Pages: 1257-1269
Download reference. The following formats are available: HTML (with abstract), plain text (with abstract), BibTeX, RIS (EndNote, RefMan, ProCite), ReDIF
Handle: RePEc:taf:conmgt:v:26:y:2008:i:12:p:1257-1269

Contact details of provider:
Web page: http://taylorandfrancis.metapress.com/link.asp?target=journal&id=100154

Order Information:
Web: http://www.tandf.co.uk/journals/subscription.html

For technical questions regarding this item, or to correct its listing, contact: (Christopher F. Baum).

Related research
Keywords: Australia; estimating accuracy; pre-tender estimates; quantity surveying; tendering;

Statistics
Access and download statistics

Did you know? There are over 21000 authors registered on RePEc Author Service.

This page was last updated on 2009-12-5.


This information is provided to you by IDEAS at the Department of Economics, College of Liberal Arts and Sciences, University of Connecticut using RePEc data on a server sponsored by the Society for Economic Dynamics.