This file is part of IDEAS, which uses RePEc data


[ Papers | Articles | Software | Books | Chapters | Authors | Institutions | JEL Classification | NEP reports | Search | New papers by email | Author registration | Rankings | Volunteers | FAQ | Blog | Help! ]

Scheduling system for high rise building construction

Author info | Abstract | Publisher info | Download info | Related research | Statistics
Author Info
David Arditi
Pirasak Sikangwan
Onur B. Tokdemir
Abstract

A computerized system to schedule high-rise building construction has been developed using line-of-balance technology assisted by an expert system. A review of the recent literature on the techniques available for scheduling and controlling construction projects of a repetitive nature shows that Gantt charts are inadequate, and that there are serious problems with using network methods in such circumstances. There is evidence that the construction of high rise buildings has a decidedly repetitive nature but differs in some respects from other repetitive projects such as pipelines or pavement construction. Two new concepts have been introduced into line-of-balance methodology to accommodate the special conditions encountered in high rise building construction. These two concepts, namely 'flexible' unit networks and 'multi-level' LOB diagrams have been coded into a scheduling module ('Lobplans'). A series of databases have been compiled regarding the productivity of resources. An expert system module (Lobex) has been developed to facilitate decision-making at network generation level. The scheduling module, the databases, and the expert system have been organized into an integrated system (Chriss) by means of communication and command routines that interface between the modules and the user input. A 16-storey building project has been used in testing Chriss' performance. The integrated system proved to be user friendly and reliable.

Download Info
To download:

If you experience problems downloading a file, check if you have the proper application to view it first. Information about this may be contained in the File-Format links below. In case of further problems read the IDEAS help page. Note that these files are not on the IDEAS site. Please be patient as the files may be large.

File URL: http://taylorandfrancis.metapress.com/link.asp?target=contribution&id=E06475VHGHFG2TNT
File Format: text/html
File Function:
Download Restriction: Access to full text is restricted to subscribers.

As the access to this document is restricted, you may want to look for a different version under "Related research" (further below) or search for a different version of it.

Publisher Info
Article provided by Taylor and Francis Journals in its journal Construction Management & Economics.

Volume (Year): 20 (2002)
Issue (Month): 4 (June)
Pages: 353-364
Download reference. The following formats are available: HTML (with abstract), plain text (with abstract), BibTeX, RIS (EndNote, RefMan, ProCite), ReDIF
Handle: RePEc:taf:conmgt:v:20:y:2002:i:4:p:353-364

Contact details of provider:
Web page: http://taylorandfrancis.metapress.com/link.asp?target=journal&id=100154

Order Information:
Web: http://www.tandf.co.uk/journals/subscription.html

For technical questions regarding this item, or to correct its listing, contact: (Christopher F. Baum).

Related research
Keywords: Linear Scheduling Methods; Line-OF-BALANCE; Networks; High Rise Building Construction; Expert Systems;

References listed on IDEAS
Please report citation or reference errors to , or , if you are the registered author of the cited work, log in to your RePEc Author Service profile, click on "citations" and make appropriate adjustments.:

  1. Ching-Hwang Wang, Yu-Chun Huang, 1998. "Controlling activity interval times in LOB scheduling," Construction Management & Economics, Taylor and Francis Journals, vol. 16(1), pages 5-16, January. [Downloadable!] (restricted)
Full references

Statistics
Access and download statistics

Did you know? All the bibliographic data shown here has been contributed by volunteers, thereby helping to keep this service free.

This page was last updated on 2009-12-5.


This information is provided to you by IDEAS at the Department of Economics, College of Liberal Arts and Sciences, University of Connecticut using RePEc data on a server sponsored by the Society for Economic Dynamics.