IDEAS home Printed from https://ideas.repec.org/a/spr/annopr/v107y2001i1p189-20910.1023-a1014955216633.html
   My bibliography  Save this article

Operational Decisions in AGV-Served Flowshop Loops: Fleet Sizing and Decomposition

Author

Listed:
  • Nicholas Hall
  • Chelliah Sriskandarajah
  • Tharmarajah Ganesharajah

Abstract

This paper considers design and operational issues that arise in repetitive manufacturing systems served by automated guided vehicles (AGVs) in loop layouts with unidirectional material flow. Such systems are in widespread industrial use, and play an important role in modern manufacturing environments. The objective considered is the minimization of AGV fleet size, given the minimum steady state cycle time required to produce a minimal job set (or equivalently, given the maximum throughput rate). We also study whether the decomposition of a large AGV-served flowshop loop into several smaller loops improves productivity. The original loop and the decomposed design are compared with respect to the minimum cycle time needed for the repetitive manufacture of a minimal job set. When there are three or more machines in the loop, finding the optimal cycle time is an intractable problem. We therefore use the genetic algorithm developed in the companion paper [17], to identify whether the original or the decomposed design is more efficient. Our study suggests that many systems perform more productively as a result of decomposition. Finally, we discuss a joint sequencing issue that arises in decomposed systems with limited buffers between the loops, and analyze the tractability of all the relevant joint sequencing problems. Copyright Kluwer Academic Publishers 2001

Suggested Citation

  • Nicholas Hall & Chelliah Sriskandarajah & Tharmarajah Ganesharajah, 2001. "Operational Decisions in AGV-Served Flowshop Loops: Fleet Sizing and Decomposition," Annals of Operations Research, Springer, vol. 107(1), pages 189-209, October.
  • Handle: RePEc:spr:annopr:v:107:y:2001:i:1:p:189-209:10.1023/a:1014955216633
    DOI: 10.1023/A:1014955216633
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1023/A:1014955216633
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1023/A:1014955216633?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Grzegorz Bocewicz & Zbigniew Banaszak & Izabela Nielsen, 2019. "Multimodal processes prototyping subject to grid-like network and fuzzy operation time constraints," Annals of Operations Research, Springer, vol. 273(1), pages 561-585, February.
    2. Amjath, Mohamed & Kerbache, Laoucine & Smith, James MacGregor & Elomri, Adel, 2022. "Fleet sizing of trucks for an inter-facility material handling system using closed queueing networks," Operations Research Perspectives, Elsevier, vol. 9(C).
    3. Chelliah Sriskandarajah & Inna Drobouchevitch & Suresh P. Sethi & Ramaswamy Chandrasekaran, 2004. "Scheduling Multiple Parts in a Robotic Cell Served by a Dual-Gripper Robot," Operations Research, INFORMS, vol. 52(1), pages 65-82, February.
    4. Asef-Vaziri, Ardavan & Laporte, Gilbert, 2005. "Loop based facility planning and material handling," European Journal of Operational Research, Elsevier, vol. 164(1), pages 1-11, July.
    5. Vis, Iris F.A., 2006. "Survey of research in the design and control of automated guided vehicle systems," European Journal of Operational Research, Elsevier, vol. 170(3), pages 677-709, May.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:annopr:v:107:y:2001:i:1:p:189-209:10.1023/a:1014955216633. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.