IDEAS home Printed from https://ideas.repec.org/a/ids/ijcist/v19y2023i2p95-107.html
   My bibliography  Save this article

BIM-based cycle control method for the whole process of building production and construction

Author

Listed:
  • Xinjie Yuan

Abstract

In order to overcome the problems of poor convergence and low control accuracy of conventional cycle control for the whole process of building production and construction due to the lack of consideration of parameter fusion and resource scheduling, a new BIM-based cycle control method for the whole process is proposed. A whole-process cycle control constraint model is constructed for parameter analysis, and with the BIM technology, parameter fusion is carried out to judge control convergence. With the BIM scheduling method, a resource scheduling control model for cycle control is constructed, so as to effective control and manage the whole process cycle. The experimental results show that the method proposed in this paper can deliver better convergence and lower control error for whole-process cycle control, the lowest difference of safety quality control was less than 0.01, which demonstrates that the method has a strong ability in carrying out whole-process cycle control.

Suggested Citation

  • Xinjie Yuan, 2023. "BIM-based cycle control method for the whole process of building production and construction," International Journal of Critical Infrastructures, Inderscience Enterprises Ltd, vol. 19(2), pages 95-107.
  • Handle: RePEc:ids:ijcist:v:19:y:2023:i:2:p:95-107
    as

    Download full text from publisher

    File URL: http://www.inderscience.com/link.php?id=130447
    Download Restriction: Access to full text is restricted to subscribers.
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ids:ijcist:v:19:y:2023:i:2:p:95-107. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sarah Parker (email available below). General contact details of provider: http://www.inderscience.com/browse/index.php?journalID=58 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.