Embedding extreme events to mine project planning: Implications on cost, time, and disclosure standards

Author

Listed:
  • Senses, Sena
  • Kumral, Mustafa

Abstract

Extreme events, characterized as infrequent and catastrophic occurrences, can present significant challenges in various industries. These events can be associated with earthquakes, landslides, hurricanes, floods, rainfalls, and wildfires. The mining industry is also highly vulnerable to extreme events because it threats operation sustainability, employees' safety, and environmental compliance. This paper presents a comprehensive analysis of earthquakes in a mining area and evaluates their impacts on a mining operation through a case study based on a mine construction project. To this end, Extreme Value Theory (EVT) using both the Block Maxima (BM) and Peaks Over Threshold (POT) methods was employed to analyze the historical earthquake data and estimate the return levels corresponding to the planned mine project completion time. Furthermore, a Discrete Event Simulation (DES) model was developed to perform a comprehensive risk assessment, allowing for a detailed examination of the potential consequences that a specified magnitude earthquake could have on the project's cost and duration. 1000 earthquake scenarios for the period covering the project life were generated for a thorough risk assessment. The case study focused on a hypothetical open pit mine construction project located in the province of British Columbia, Canada. Historical earthquake data specific to the selected region were analyzed, and the potential consequences of earthquakes on the project were evaluated. According to the results, the return level of 4.7 ML earthquake was obtained corresponding to the return period defined as the planned project completion time. In the event of an earthquake with this specified magnitude, simulation results revealed that there is a 95% probability that the project will experience a delay of at least 6.28% of the project completion time, ultimately leading to project costs exceeding the normal project cost by a minimum of 4.85%. The study highlights the importance of considering extreme natural events, such as earthquakes, in mining project planning and risk mitigation. The results provide valuable insights into the likelihood and potential consequences of earthquakes, contributing to better risk assessment, strategic planning, informed decision-making, and improved project management practices in the mining industry.

Suggested Citation

  • Senses, Sena & Kumral, Mustafa, 2023. "Embedding extreme events to mine project planning: Implications on cost, time, and disclosure standards," Resources Policy, Elsevier, vol. 86(PA).
  • Handle: RePEc:eee:jrpoli:v:86:y:2023:i:pa:s0301420723008735
    DOI: 10.1016/j.resourpol.2023.104162
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0301420723008735
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.resourpol.2023.104162?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:jrpoli:v:86:y:2023:i:pa:s0301420723008735. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/inca/30467 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.