The main purpose of improving and varying cost calculation methods in the machine building industry is to make them more operational and efficient in supplying the information necessary to the management in taking its decisions. The present cost calculation methods used in the machine building plants - global method and the method per orders - by which a historical cost is determined a posteriori used in deducting and post factum justification of manufacturing expenses does not offer the management the possibility to fully satisfy its need for information. We are talking about a change of conception in applying certain systems, methods and work techniques, according to the needs of efficient administration of production and the plant seen as a whole. The standard-cost method best answers to the needs of the effective management of the value side of the manufacturing process and raising economic efficiency. We consider that, in the machine building industry, these objectives can be achieved by using the standard - sole cost alternative of the standard-cost method.
Download Info
To download:
If you experience problems downloading a file, check if you have the
proper application to
view it first. Information about this may be contained
in the File-Format links below. In case of further problems read
the IDEAS help
page. Note that these files are not on the IDEAS
site. Please be patient as the files may be large.
Volume (Year): 7(502) (2006) Issue (Month): 7(502) (September) Pages: 81-84 Download reference. The following formats are available: HTML
(with abstract),
plain text
(with abstract),
BibTeX,
RIS (EndNote, RefMan, ProCite),
ReDIF