IDEAS home Printed from https://ideas.repec.org/r/eee/ejores/v258y2017i1p343-357.html
   My bibliography  Save this item

A generalized classification scheme for crane scheduling with interference

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Peng, Ling & Kloeden, Peter E., 2021. "Time-consistent portfolio optimization," European Journal of Operational Research, Elsevier, vol. 288(1), pages 183-193.
  2. Lennart Zey & Dirk Briskorn & Nils Boysen, 2022. "Twin-crane scheduling during seaside workload peaks with a dedicated handshake area," Journal of Scheduling, Springer, vol. 25(1), pages 3-34, February.
  3. Chen, Ran & Yang, Jingjing & Yu, Yugang & Guo, Xiaolong, 2023. "Retrieval request scheduling in a shuttle-based storage and retrieval system with two lifts," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 174(C).
  4. Schulz, Arne & Fliedner, Malte & Fiedrich, Benedikt & Pfeiffer, Christian, 2021. "Levelling crane workload in multi-yard rail-road container terminals," European Journal of Operational Research, Elsevier, vol. 293(3), pages 941-954.
  5. Simon Emde, 2017. "Optimally scheduling interfering and non‐interfering cranes," Naval Research Logistics (NRL), John Wiley & Sons, vol. 64(6), pages 476-489, September.
  6. Dirk Briskorn & Lennart Zey, 2018. "Resolving interferences of triple‐crossover‐cranes by determining paths in networks," Naval Research Logistics (NRL), John Wiley & Sons, vol. 65(6-7), pages 477-498, September.
  7. Gang Ren & Xiaohan Wang & Jiaxin Cai & Shujuan Guo, 2021. "Allocation and Scheduling of Handling Resources in the Railway Container Terminal Based on Crossing Crane Area," Sustainability, MDPI, vol. 13(3), pages 1-24, January.
  8. Sara El Mekkaoui & Loubna Benabbou & Abdelaziz Berrado, 2023. "Deep learning models for vessel’s ETA prediction: bulk ports perspective," Flexible Services and Manufacturing Journal, Springer, vol. 35(1), pages 5-28, March.
  9. Amelie Eilken, 2019. "A decomposition-based approach to the scheduling of identical automated yard cranes at container terminals," Journal of Scheduling, Springer, vol. 22(5), pages 517-541, October.
  10. Wang, Mengyao & Zhou, Chenhao & Wang, Aihu, 2022. "A cluster-based yard template design integrated with yard crane deployment using a placement heuristic," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 160(C).
  11. Dirk Briskorn & Lennart Zey, 2020. "Interference aware scheduling of triple-crossover-cranes," Journal of Scheduling, Springer, vol. 23(4), pages 465-485, August.
  12. David Füßler & Stefan Fedtke & Nils Boysen, 2019. "The cafeteria problem: order sequencing and picker routing in on-the-line picking systems," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(3), pages 727-756, September.
  13. Kress, Dominik & Dornseifer, Jan & Jaehn, Florian, 2019. "An exact solution approach for scheduling cooperative gantry cranes," European Journal of Operational Research, Elsevier, vol. 273(1), pages 82-101.
  14. Damla Kizilay & Deniz Türsel Eliiyi, 2021. "A comprehensive review of quay crane scheduling, yard operations and integrations thereof in container terminals," Flexible Services and Manufacturing Journal, Springer, vol. 33(1), pages 1-42, March.
  15. Gharehgozli, Amir & Zaerpour, Nima, 2018. "Stacking outbound barge containers in an automated deep-sea terminal," European Journal of Operational Research, Elsevier, vol. 267(3), pages 977-995.
  16. Vallada, Eva & Belenguer, Jose Manuel & Villa, Fulgencia & Alvarez-Valdes, Ramon, 2023. "Models and algorithms for a yard crane scheduling problem in container ports," European Journal of Operational Research, Elsevier, vol. 309(2), pages 910-924.
  17. Kong, Lingrui & Ji, Mingjun & Gao, Zhendi, 2022. "An exact algorithm for scheduling tandem quay crane operations in container terminals," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 168(C).
  18. Dirk Briskorn, 2021. "Routing two stacking cranes with predetermined container sequences," Journal of Scheduling, Springer, vol. 24(4), pages 367-380, August.
  19. Florian Jaehn & Andreas Wiehl, 2020. "Approximation algorithms for the twin robot scheduling problem," Journal of Scheduling, Springer, vol. 23(1), pages 117-133, February.
  20. Qin, Tianbao & Du, Yuquan & Chen, Jiang Hang & Sha, Mei, 2020. "Combining mixed integer programming and constraint programming to solve the integrated scheduling problem of container handling operations of a single vessel," European Journal of Operational Research, Elsevier, vol. 285(3), pages 884-901.
  21. Gharehgozli, Amir & Yu, Yugang & de Koster, René & Du, Shaofu, 2019. "Sequencing storage and retrieval requests in a container block with multiple open locations," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 125(C), pages 261-284.
  22. Dirk Briskorn & Florian Jaehn & Andreas Wiehl, 2019. "A generator for test instances of scheduling problems concerning cranes in transshipment terminals," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(1), pages 45-69, March.
  23. Basallo-Triana, Mario José & Bravo-Bastidas, Juan José & Vidal-Holguín, Carlos Julio, 2022. "A rail-road transshipment yard picture," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 159(C).
  24. Tanaka, Shunji & Tierney, Kevin, 2018. "Solving real-world sized container pre-marshalling problems with an iterative deepening branch-and-bound algorithm," European Journal of Operational Research, Elsevier, vol. 264(1), pages 165-180.
  25. Agra, Agostinho & Oliveira, Maryse, 2018. "MIP approaches for the integrated berth allocation and quay crane assignment and scheduling problem," European Journal of Operational Research, Elsevier, vol. 264(1), pages 138-148.
  26. Jiang Hang Chen, 2019. "A note on: a flexible crane scheduling methodology for container terminals," Flexible Services and Manufacturing Journal, Springer, vol. 31(1), pages 34-40, March.
  27. Anne Ehleiter & Florian Jaehn, 2018. "Scheduling crossover cranes at container terminals during seaside peak times," Journal of Heuristics, Springer, vol. 24(6), pages 899-932, December.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.