IDEAS home Printed from https://ideas.repec.org/p/bei/00bewp/0046.html
   My bibliography  Save this paper

Market design for the procurement of reactive power: the current state in Germany

Author

Listed:
  • Anna Pechan
  • Marius Buchmann

Abstract

The market-based procurement of system services for network operators is gaining momentum in the current debate about the future market design in the energy sector. Since current sources of reactive power are primarily fossil-fuel power plants which will not be available in a carbon neutral energy system, reactive power will be sources from distributed assets in the electricity networks. The German regulator has proposed new rules for reactive power procurement, which are based on three pillars: The technical connection agreements, fully integrated network components owned by the network operators and market-based procurement. While this approach is primarily aiming at the reactive power demand on the transmission grid level, assets from the medium voltage grid can participate in this process as well. We evaluate this approach from an economic perspective and conclude that while such a three-pillar system can secure an effective provision of reactive power, the efficiency heavily depends on the regulatory system and that it provides the correct incentives for the network operator.

Suggested Citation

  • Anna Pechan & Marius Buchmann, 2023. "Market design for the procurement of reactive power: the current state in Germany," Bremen Energy Working Papers 0046, Bremen Energy Research.
  • Handle: RePEc:bei:00bewp:0046
    as

    Download full text from publisher

    File URL: https://bremen-energy-research.de/wp-content/bewp/bewp46.pdf
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Anaya, Karim L. & Pollitt, Michael G., 2020. "Reactive power procurement: A review of current trends," Applied Energy, Elsevier, vol. 270(C).
    2. Karim L. Anaya & Michael G. Pollitt, 2021. "How to Procure Flexibility Services within the Electricity Distribution System: Lessons from an International Review of Innovation Projects," Energies, MDPI, vol. 14(15), pages 1-26, July.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Anaya, Karim L. & Pollitt, Michael G., 2022. "A social cost benefit analysis for the procurement of reactive power: The case of Power Potential," Applied Energy, Elsevier, vol. 312(C).
    2. Karim Anaya & Michael Pollitt, 2021. "An evaluation of a local reactive power market: the case of Power Potential," Working Papers EPRG2124, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
    3. Karim L. Anaya & Michael G. Pollitt, 2021. "How to Procure Flexibility Services within the Electricity Distribution System: Lessons from an International Review of Innovation Projects," Energies, MDPI, vol. 14(15), pages 1-26, July.
    4. Wilkinson, Sam & Maticka, Martin J. & Liu, Yue & John, Michele, 2021. "The duck curve in a drying pond: The impact of rooftop PV on the Western Australian electricity market transition," Utilities Policy, Elsevier, vol. 71(C).
    5. Covatariu, A. & Duma, D. & Giulietti, M. & Pollitt M., 2023. "Toward an operational definition and a. methodology for measurement of the active DSO (distribution system operator) for electricity and gas," Cambridge Working Papers in Economics 2348, Faculty of Economics, University of Cambridge.
    6. Davi-Arderius, Daniel & Schittekatte, Tim, 2023. "Carbon emissions impacts of operational network constraints: The case of Spain during the Covid-19 crisis," Energy Economics, Elsevier, vol. 128(C).
    7. Dong, Hanjiang & Zhu, Jizhong & Li, Shenglin & Wu, Wanli & Zhu, Haohao & Fan, Junwei, 2023. "Short-term residential household reactive power forecasting considering active power demand via deep Transformer sequence-to-sequence networks," Applied Energy, Elsevier, vol. 329(C).
    8. Jerzy Andruszkiewicz & Józef Lorenc & Agnieszka Weychan, 2023. "Determination of the Optimal Level of Reactive Power Compensation That Minimizes the Costs of Losses in Distribution Networks," Energies, MDPI, vol. 17(1), pages 1-24, December.
    9. Pollitt, M. G., 2023. "Locational Marginal Prices (LMPs) for Electricity in Europe? The Untold Story," Cambridge Working Papers in Economics 2352, Faculty of Economics, University of Cambridge.
    10. Duma, Daniel & Pollitt, Michael G. & Covatariu, Andrei & Giulietti, Monica, 2024. "Defining and measuring active distribution system operators for the electricity and natural gas sectors," Utilities Policy, Elsevier, vol. 87(C).
    11. Dranka, Géremi Gilson & Ferreira, Paula & Vaz, A. Ismael F., 2021. "A review of co-optimization approaches for operational and planning problems in the energy sector," Applied Energy, Elsevier, vol. 304(C).
    12. Davi-Arderius, D. & Jamasb, T. & Rosellon, J., 2024. "Renewable Integration: The Role of Market Conditions," Cambridge Working Papers in Economics 2421, Faculty of Economics, University of Cambridge.
    13. Davi-Arderius, Daniel & Jamasb, Tooraj & Rosellon, Juan, 2024. "Renewable Integration and Power System Operation: The Role of Market Conditions," Working Papers 3-2024, Copenhagen Business School, Department of Economics.
    14. Martha N. Acosta & Francisco Gonzalez-Longatt & Danijel Topić & Manuel A. Andrade, 2021. "Optimal Microgrid–Interactive Reactive Power Management for Day–Ahead Operation," Energies, MDPI, vol. 14(5), pages 1-20, February.
    15. Sarah Fanta & Ksenia Tolstrup & Markus Riegler & Lukas Obernosterer & Christina Wirrer, 2024. "Efficient Operationalization of Flexibility Procurement: Market Design Analysis and Process Definition," Energies, MDPI, vol. 17(12), pages 1-19, June.
    16. Lange, Sebastian & Sokolowski, Peter & Yu, Xinghuo, 2022. "An efficient, open-bid procurement auction for small-scale electricity markets," Applied Energy, Elsevier, vol. 314(C).
    17. Karim L. Anaya & Monica Giulietti & Michael G. Pollitt, 2022. "Where next for the electricity distribution system operator? Evidence from a survey of European DSOs and National Regulatory Authorities," Competition and Regulation in Network Industries, , vol. 23(4), pages 245-269, December.
    18. Glismann, Samuel, 2021. "Ancillary Services Acquisition Model: Considering market interactions in policy design," Applied Energy, Elsevier, vol. 304(C).
    19. Azarnia, Mahsa & Rahimiyan, Morteza & Siano, Pierluigi, 2024. "Offering of active distribution network in real-time energy market by integrated energy management system and Volt-Var optimization," Applied Energy, Elsevier, vol. 358(C).
    20. Ander Zubiria & Álvaro Menéndez & Hans-Jürgen Grande & Pilar Meneses & Gregorio Fernández, 2022. "Multi-Criteria Decision-Making Problem for Energy Storage Technology Selection for Different Grid Applications," Energies, MDPI, vol. 15(20), pages 1-25, October.

    More about this item

    Keywords

    resilience; reactive power; electricity; network; market design;
    All these keywords.

    JEL classification:

    • D47 - Microeconomics - - Market Structure, Pricing, and Design - - - Market Design
    • L51 - Industrial Organization - - Regulation and Industrial Policy - - - Economics of Regulation
    • L94 - Industrial Organization - - Industry Studies: Transportation and Utilities - - - Electric Utilities

    NEP fields

    This paper has been announced in the following NEP Reports:

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:bei:00bewp:0046. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Marius Buchmann (email available below). General contact details of provider: http://bremen-energy-research.de/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.