Determination of construction process duration based on labor productivity estimation: A case study

Author

Listed:
  • Kubečková Darja

    (VŠB-Technical University of Ostrava, Faculty of Civil Engineering Department of Construction L. Podeště 1875, 708 00 Ostrava-Poruba, Czech Republic)

  • Smugala Stanislav

    (Department of Construction, Faculty of Civil Engineering, VŠB – Technical University Ostrava, Ludvíka Podéště 1875/17, 708 33 Ostrava – Poruba, Czech Republic)

Abstract

Monitoring labor productivity and how to decrease construction costs are the key issues in the planning process of a construction project. The CONTEC automated system combined with statistical methods assists in predicting the amount of time required to complete construction works according to the specified number of deployed work crews, technological processes, and labor required for certain production in person-hours. This study applies statistical analyses and probability theories for plastering work, which represents a labor-intensive construction process. The goal of the research is to determine the probability of completion of the construction process based on monitoring the mean value of performance. By application of statistical analyses a decrease in the performance standard has been proved compared with the planned values given in the CONTEC database. The decrease in performance, which was also caused by the number of days with unfavorable climatic conditions and demonstrated by performing interval estimates based on the collection of statistical data, was later confirmed by a relative frequency test. The measures taken were in terms of establishing the required number of personnel capacities for complying with the construction schedule.

Suggested Citation

  • Kubečková Darja & Smugala Stanislav, 2021. "Determination of construction process duration based on labor productivity estimation: A case study," Organization, Technology and Management in Construction, Sciendo, vol. 13(2), pages 2521-2538, July.
  • Handle: RePEc:vrs:otamic:v:13:y:2021:i:2:p:2521-2538:n:1
    DOI: 10.2478/otmcj-2021-0031
    as

    Download full text from publisher

    File URL: https://doi.org/10.2478/otmcj-2021-0031
    Download Restriction: no

    File URL: https://libkey.io/10.2478/otmcj-2021-0031?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Walter Briec & Kristiaan Kerstens & Nicolas Peypoch, 2012. "Exact Relations Between Four Definitions Of Productivity Indices And Indicators," Bulletin of Economic Research, Wiley Blackwell, vol. 64(2), pages 265-274, April.
    2. P. Urgilés & J. Claver & M. A. Sebastián, 2019. "Analysis of the Earned Value Management and Earned Schedule Techniques in Complex Hydroelectric Power Production Projects: Cost and Time Forecast," Complexity, Hindawi, vol. 2019, pages 1-11, April.
    3. M Vanhoucke & S Vandevoorde, 2007. "A simulation and evaluation of earned value metrics to forecast the project duration," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(10), pages 1361-1374, October.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Richard E. Wendell & Timothy J. Lowe & Mike M. Gordon, 2023. "Dangers in using earned duration and other earned value metrics to measure a project’s schedule performance," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 31(2), pages 665-680, June.
    2. Litsiou, Konstantia & Polychronakis, Yiannis & Karami, Azhdar & Nikolopoulos, Konstantinos, 2022. "Relative performance of judgmental methods for forecasting the success of megaprojects," International Journal of Forecasting, Elsevier, vol. 38(3), pages 1185-1196.
    3. Mocholi-Arce, Manuel & Sala-Garrido, Ramon & Molinos-Senante, Maria & Maziotis, Alexandros, 2023. "Profit productivity change in the English and Welsh water sector: Impact of the price reviews," Utilities Policy, Elsevier, vol. 82(C).
    4. D. Vantomme & M. Geuens & S. Dewitte, 2005. "How to Portray Men and Women in Advertisements? Explicit and Implicit Evaluations of Ads Depicting Different Gender Roles," Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium 05/319, Ghent University, Faculty of Economics and Business Administration.
    5. Pastor, Jesus T. & Lovell, C.A. Knox & Aparicio, Juan, 2020. "Defining a new graph inefficiency measure for the proportional directional distance function and introducing a new Malmquist productivity index," European Journal of Operational Research, Elsevier, vol. 281(1), pages 222-230.
    6. Walter Briec & Laurence Lasselle, 2022. "On some relations between a continuous time Luenberger productivity indicator and the Solow model," Bulletin of Economic Research, Wiley Blackwell, vol. 74(2), pages 484-502, April.
    7. E. Labro & M. Vanhoucke, 2005. "A simulation analysis of interactions between errors in costing system design," Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium 05/333, Ghent University, Faculty of Economics and Business Administration.
    8. J. Albrecht & M. Neyt & T. Verbeke, 2005. "Bureaucratisation and the growth of health care expenditures in Europe," Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium 05/335, Ghent University, Faculty of Economics and Business Administration.
    9. Ünsal-Altuncan, Izel & Vanhoucke, Mario, 2024. "A hybrid forecasting model to predict the duration and cost performance of projects with Bayesian Networks," European Journal of Operational Research, Elsevier, vol. 315(2), pages 511-527.
    10. Merino, Fernando, 2012. "Firms' internationalization and productivity growth," Research in Economics, Elsevier, vol. 66(4), pages 349-354.
    11. Wauters, Mathieu & Vanhoucke, Mario, 2017. "A Nearest Neighbour extension to project duration forecasting with Artificial Intelligence," European Journal of Operational Research, Elsevier, vol. 259(3), pages 1097-1111.
    12. Knockaert, M. & Lockett, A. & Clarysse, B. & Wright, M., 2005. "Do human capital and fund characteristics drive follow-up behaviour of early stage high tech vcs?," Vlerick Leuven Gent Management School Working Paper Series 2005-20, Vlerick Leuven Gent Management School.
    13. P. Windels & J. Christiaens, 2005. "Management Reform in Flemish Local Authorities: Testing the Institutional Framework," Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium 05/331, Ghent University, Faculty of Economics and Business Administration.
    14. Mostafa Salari & Homayoun Khamooshi, 2016. "A better project performance prediction model using fuzzy time series and data envelopment analysis," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 67(10), pages 1274-1287, October.
    15. W. Bruggeman & P. Everaert & S. R. Anderson & Y. Levant, 2005. "Modeling Logistics Costs using Time-Driven ABC: A Case in a Distribution Company," Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium 05/332, Ghent University, Faculty of Economics and Business Administration.
    16. Jan Lepoutre & Nikolay Dentchev & Aimé Heene, 2007. "Dealing With Uncertainties When Governing CSR Policies," Journal of Business Ethics, Springer, vol. 73(4), pages 391-408, July.
    17. V. Vansteeger, 2005. "The current state of accounting harmonization: impediments to and benefits from harmonization," Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium 05/322, Ghent University, Faculty of Economics and Business Administration.
    18. Gustavo Ferro & María Eugenia Labaronnie & Carlos A. Romero, 2011. "Medición de cambios en productividad con indicador de Luenberger en el sector de seguros en Argentina a la salida de la crisis," Working Papers hal-00597947, HAL.
    19. Vanhoucke, Mario, 2010. "Using activity sensitivity and network topology information to monitor project time performance," Omega, Elsevier, vol. 38(5), pages 359-370, October.
    20. Picazo-Tadeo, Andrés J. & Castillo-Giménez, Juana & Beltrán-Esteve, Mercedes, 2014. "An intertemporal approach to measuring environmental performance with directional distance functions: Greenhouse gas emissions in the European Union," Ecological Economics, Elsevier, vol. 100(C), pages 173-182.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:vrs:otamic:v:13:y:2021:i:2:p:2521-2538:n:1. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Peter Golla (email available below). General contact details of provider: https://www.sciendo.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.