IDEAS home Printed from https://ideas.repec.org/p/qut/dpaper/208d.html
   My bibliography  Save this paper

Modelling the initial pit design: the first step for project valuation

Author

Listed:
  • Rodney C Wolff
  • Luis A Martinez

    (School of Economics and Finance, Queensland University of Technology)

Abstract

One critical factor in open pit mining projects is the estimation of the recoverable reserves. The reason for this is that at the valuation stage there is a lack of information about future metal prices and production costs. Consequently, the estimation of the recoverable reserves needs to be done based on a fixed break-even cut-off grade (BECG), in which fixed expected metal prices and production costs are assumed throughout the operating life of the mine (OLM). In this paper, an alternative technique for estimating the recoverable reserves of an open pit mining project is presented and explained in detail. The main characteristic of this technique is that it estimates the recoverable reserves of the project using mining costs as reference: this is done due to the fact that mining costs are easier to model than metal prices. Another important characteristic of this technique is that it uses the uncertainty of the geology of the orebody, given by simulations of the deposit, to make final strategic decisions, such as the selection of the operating life of the mine and the optimal production rate, which minimise the risk of not achieving future production targets while maximising the upside potential of future rewards. As it will be shown, the final outcome of the proposed technique is the generation of a robust open pit design, that include cutbacks and ultimate pit limits, called the marginal open pit mine design (MOPMD). One characteristic of the MOPMD is that, at each production period, it will be characterised by their respective geological uncertainty, given as probability distributions of ore, waste and metal quantities, and by marginal economical project indicators, such as cut-off grades and metal prices, among others. The details follow in the paper.

Suggested Citation

  • Rodney C Wolff & Luis A Martinez, 2006. "Modelling the initial pit design: the first step for project valuation," School of Economics and Finance Discussion Papers and Working Papers Series 208d, School of Economics and Finance, Queensland University of Technology.
  • Handle: RePEc:qut:dpaper:208d
    as

    Download full text from publisher

    File URL: http://eprints.qut.edu.au/5940/
    Download Restriction: no

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:qut:dpaper:208d. See general information about how to correct material in RePEc.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: (Angela Fletcher). General contact details of provider: http://edirc.repec.org/data/sequtau.html .

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service hosted by the Research Division of the Federal Reserve Bank of St. Louis . RePEc uses bibliographic data supplied by the respective publishers.