IDEAS home Printed from https://ideas.repec.org/p/zbw/grewdp/062003.html
   My bibliography  Save this paper

Ellipsenverfahren zur betriebsübergreifenden simultanen Losgrößen- und Bestellmengenplanung

Author

Listed:
  • Lerm, Michael
  • Rollberg, Roland

Abstract

No abstract is available for this item.

Suggested Citation

  • Lerm, Michael & Rollberg, Roland, 2003. "Ellipsenverfahren zur betriebsübergreifenden simultanen Losgrößen- und Bestellmengenplanung," Wirtschaftswissenschaftliche Diskussionspapiere 06/2003, University of Greifswald, Faculty of Law and Economics.
  • Handle: RePEc:zbw:grewdp:062003
    as

    Download full text from publisher

    File URL: https://www.econstor.eu/bitstream/10419/48889/1/368813177.pdf
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Stadtler, Hartmut & Kilger, C., 2000. "Supply chain management and advanced planning: concepts, models, software and case studies," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 4691, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Brun, Alessandro & Caridi, Maria & Fahmy Salama, Kamal & Ravelli, Ivan, 2006. "Value and risk assessment of supply chain management improvement projects," International Journal of Production Economics, Elsevier, vol. 99(1-2), pages 186-201, February.
    2. Zhenying Zhao & Michael Ball & Masahiro Kotake, 2005. "Optimization-Based Available-To-Promise with Multi-Stage Resource Availability," Annals of Operations Research, Springer, vol. 135(1), pages 65-85, March.
    3. Meixell, Mary J., 2005. "The impact of setup costs, commonality, and capacity on schedule stability: An exploratory study," International Journal of Production Economics, Elsevier, vol. 95(1), pages 95-107, January.
    4. Holten, Roland, 2002. "Metainformationssysteme: Backbone der Anwendungssystemkopplung," Arbeitsberichte des Instituts für Wirtschaftsinformatik 89, University of Münster, Department of Information Systems.
    5. Fandel, G. & Stammen, M., 2004. "A general model for extended strategic supply chain management with emphasis on product life cycles including development and recycling," International Journal of Production Economics, Elsevier, vol. 89(3), pages 293-308, June.
    6. Brunelle Marche & Vincent Boly & Roland Ortt, 2016. "Observing New Product Impacts On Sectors Value Chains: The Case Of A French Electronic Sme," Post-Print hal-01891016, HAL.
    7. I. Chitou, 2010. "Organizational Logistics, Response to Structural Change in the Operational Functioning of the Company," Economic Studies journal, Bulgarian Academy of Sciences - Economic Research Institute, issue 4, pages 97-113.
    8. Venkatadri, Uday & Srinivasan, Ashok & Montreuil, Benoit & Saraswat, Ashish, 2006. "Optimization-based decision support for order promising in supply chain networks," International Journal of Production Economics, Elsevier, vol. 103(1), pages 117-130, September.
    9. Sucky, Eric, 2006. "A bargaining model with asymmetric information for a single supplier-single buyer problem," European Journal of Operational Research, Elsevier, vol. 171(2), pages 516-535, June.
    10. She-I Chang & David C. Yen & Celeste See-Pui Ng & I-Cheng Chang & Sheng-Yu Yu, 2011. "An ERP system performance assessment model development based on the balanced scorecard approach," Information Systems Frontiers, Springer, vol. 13(3), pages 429-450, July.
    11. Long Gao & Susan H. Xu & Michael O. Ball, 2012. "Managing an Available-to-Promise Assembly System with Dynamic Short-Term Pseudo-Order Forecast," Management Science, INFORMS, vol. 58(4), pages 770-790, April.
    12. De Boeck, L. & Vandaele, N., 2008. "Coordination and synchronization of material flows in supply chains: An analytical approach," International Journal of Production Economics, Elsevier, vol. 116(2), pages 199-207, December.
    13. Xiong, M.H. & Tor, S.B. & Bhatnagar, Rohit & Khoo, L.P. & Venkat, S., 2006. "A DSS approach to managing customer enquiries for SMEs at the customer enquiry stage," International Journal of Production Economics, Elsevier, vol. 103(1), pages 332-346, September.
    14. Brunelle Marche & Vincent Boly & J. Roland Ortt, 2016. "Observing innovation impacts on supply chain: the case of the Swatch," Post-Print hal-01891266, HAL.
    15. Anna Nagurney & Ke Ke & Jose Cruz & Kitty Hancock & Frank Southworth, 2002. "Dynamics of Supply Chains: A Multilevel (Logistical–Informational–Financial) Network Perspective," Environment and Planning B, , vol. 29(6), pages 795-818, December.
    16. Olhager, Jan & Selldin, Erik, 2004. "Supply chain management survey of Swedish manufacturing firms," International Journal of Production Economics, Elsevier, vol. 89(3), pages 353-361, June.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:zbw:grewdp:062003. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: ZBW - Leibniz Information Centre for Economics (email available below). General contact details of provider: https://edirc.repec.org/data/wwgrede.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.