IDEAS home Printed from https://ideas.repec.org/p/zbw/euvwdp/378.html
   My bibliography  Save this paper

A general production and recovery EOQ model with stationary demand and return rates

Author

Listed:
  • Kozlovskaya, Nadezhda
  • Pakhomova, Nadezhda
  • Richter, Knut

Abstract

This paper considers the general production and recovery EOQ model (GPRM), which generalizes the model of Saadany and Jaber (2008). In this general model, one supplier and one or several buyers constitute the underlying supply chain. The supplier is supposed to manufacture new products, which are then delivered to the buyers according to fixed demand rates. The supplier is also capable of recovering used products (cores),which are returned back by the buyers. Our modelling approach generalizes a whole class of various other models that draw attention to different aspects of production, inventory, and recovery. A complete solution in the form of a theorem for that general model class is provided. Furthermore, the paper illustrates how that theorem can be applied to one of the mentioned models from the literature.

Suggested Citation

  • Kozlovskaya, Nadezhda & Pakhomova, Nadezhda & Richter, Knut, 2016. "A general production and recovery EOQ model with stationary demand and return rates," Discussion Papers 378, European University Viadrina Frankfurt (Oder), Department of Business Administration and Economics.
  • Handle: RePEc:zbw:euvwdp:378
    as

    Download full text from publisher

    File URL: https://www.econstor.eu/bitstream/10419/125925/1/845579401.pdf
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. El Saadany, Ahmed M.A. & Jaber, Mohamad Y. & Bonney, Maurice, 2013. "How many times to remanufacture?," International Journal of Production Economics, Elsevier, vol. 143(2), pages 598-604.
    2. Andriolo, Alessandro & Battini, Daria & Grubbström, Robert W. & Persona, Alessandro & Sgarbossa, Fabio, 2014. "A century of evolution from Harris׳s basic lot size model: Survey and research agenda," International Journal of Production Economics, Elsevier, vol. 155(C), pages 16-38.
    3. Schulz, Tobias & Voigt, Guido, 2014. "A flexibly structured lot sizing heuristic for a static remanufacturing system," Omega, Elsevier, vol. 44(C), pages 21-31.
    4. André Gascon & Robert C. Leachman, 1988. "A Dynamic Programming Solution to the Dynamic, Multi-Item, Single-Machine Scheduling Problem," Operations Research, INFORMS, vol. 36(1), pages 50-56, February.
    5. Richter, Knut, 1996. "The extended EOQ repair and waste disposal model," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 443-447, August.
    6. Konstantaras, I. & Papachristos, S., 2008. "A note on: Developing an exact solution for an inventory system with product recovery," International Journal of Production Economics, Elsevier, vol. 111(2), pages 707-712, February.
    7. Richter, Knut & Dobos, Imre, 1999. "Analysis of the EOQ repair and waste disposal problem with integer setup numbers," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 463-467, March.
    8. de Brito, M.P. & Flapper, S.D.P. & Dekker, R., 2002. "Reverse logistics," Econometric Institute Research Papers EI 2002-21, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    9. Richter, Knut, 1996. "The EOQ repair and waste disposal model with variable setup numbers," European Journal of Operational Research, Elsevier, vol. 95(2), pages 313-324, December.
    10. Jaber, Mohamad Y. & El Saadany, Ahmed M.A., 2009. "The production, remanufacture and waste disposal model with lost sales," International Journal of Production Economics, Elsevier, vol. 120(1), pages 115-124, July.
    11. Mabini, Marilyn C. & Pintelon, Liliane M. & Gelders, Ludo F., 1992. "EOQ type formulations for controlling repairable inventories," International Journal of Production Economics, Elsevier, vol. 28(1), pages 21-33, November.
    12. Dobos, Imre & Gobsch, Barbara & Pakhomova, Nadezhda & Pishchulov, Grigory & Richter, Knut, 2011. "A vendor-purchaser economic lot size problem with remanufacturing and deposit," Discussion Papers 304, European University Viadrina Frankfurt (Oder), Department of Business Administration and Economics.
    13. de Brito, M.P. & Dekker, R., 2003. "A Framework for Reverse Logistics," ERIM Report Series Research in Management ERS-2003-045-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
    14. Fleischmann, Moritz & Bloemhof-Ruwaard, Jacqueline M. & Dekker, Rommert & van der Laan, Erwin & van Nunen, Jo A. E. E. & Van Wassenhove, Luk N., 1997. "Quantitative models for reverse logistics: A review," European Journal of Operational Research, Elsevier, vol. 103(1), pages 1-17, November.
    15. Choi, Dae-Won & Hwang, Hark & Koh, Shie-Gheun, 2007. "A generalized ordering and recovery policy for reusable items," European Journal of Operational Research, Elsevier, vol. 182(2), pages 764-774, October.
    16. Dobos, Imre & Richter, Knut, 2004. "An extended production/recycling model with stationary demand and return rates," International Journal of Production Economics, Elsevier, vol. 90(3), pages 311-323, August.
    17. Konstantaras, I. & Skouri, K., 2010. "Lot sizing for a single product recovery system with variable setup numbers," European Journal of Operational Research, Elsevier, vol. 203(2), pages 326-335, June.
    18. Zhou, Feng & Blocher, James D. & Hu, Xinxin & Sebastian Heese, H., 2014. "Optimal single machine scheduling of products with components and changeover cost," European Journal of Operational Research, Elsevier, vol. 233(1), pages 75-83.
    19. Kozlovskaya, Nadezhda & Pakhomova, Nadezhda & Richter, Knut, 2015. "Complete solution of the extended EOQ repair and waste disposal model with switching costs," Discussion Papers 376, European University Viadrina Frankfurt (Oder), Department of Business Administration and Economics.
    20. Ruud H. Teunter, 2001. "Economic ordering quantities for recoverable item inventory systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(6), pages 484-495, September.
    21. van der Laan, Erwin & Salomon, Marc & Dekker, Rommert, 1999. "An investigation of lead-time effects in manufacturing/remanufacturing systems under simple PUSH and PULL control strategies," European Journal of Operational Research, Elsevier, vol. 115(1), pages 195-214, May.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Kozlovskaya, Nadezhda & Pakhomova, Nadezhda & Richter, Knut, 2015. "Complete solution of the extended EOQ repair and waste disposal model with switching costs," Discussion Papers 376, European University Viadrina Frankfurt (Oder), Department of Business Administration and Economics.
    2. Hsieh, Chung-Chi & Lathifah, Artya, 2022. "Ordering and waste reuse decisions in a make-to-order system under demand uncertainty," European Journal of Operational Research, Elsevier, vol. 303(3), pages 1290-1303.
    3. Omar, Mohd & Yeo, Ivan, 2014. "A production–repair inventory model with time-varying demand and multiple setups," International Journal of Production Economics, Elsevier, vol. 155(C), pages 398-405.
    4. Bimal Kumar Mawandiya & J. K. Jha & Jitesh J. Thakkar, 2020. "Optimal production-inventory policy for closed-loop supply chain with remanufacturing under random demand and return," Operational Research, Springer, vol. 20(3), pages 1623-1664, September.
    5. Sumit Maheshwari & Amrina Kausar & Ahmad Hasan & Chandra K. Jaggi, 2023. "Sustainable inventory model for a three-layer supply chain using optimal waste management," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 14(1), pages 216-235, March.
    6. Lucas Dias Condeixa & Pierry Silva & Diego Moah & Brenda Farias & Adriana Leiras, 2022. "Evaluating cost impacts on reverse logistics using an Economic Order Quantity (EOQ) model with environmental and social considerations," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 30(3), pages 921-940, September.
    7. Adel A. Alamri, 2023. "A Sustainable Closed-Loop Supply Chains Inventory Model Considering Optimal Number of Remanufacturing Times," Sustainability, MDPI, vol. 15(12), pages 1-23, June.
    8. Jaber, Mohamad Y. & El Saadany, Ahmed M.A., 2009. "The production, remanufacture and waste disposal model with lost sales," International Journal of Production Economics, Elsevier, vol. 120(1), pages 115-124, July.
    9. Omar, Mohd & Yeo, Ivan, 2009. "A model for a production-repair system under a time-varying demand process," International Journal of Production Economics, Elsevier, vol. 119(1), pages 17-23, May.
    10. Mostafa Parsa & Ali Shahandeh Nookabadi & Zümbül Atan & Yaser Malekian, 2022. "An optimal inventory policy for a multi-echelon closed-loop supply chain of postconsumer recycled content products," Operational Research, Springer, vol. 22(3), pages 1887-1938, July.
    11. El Saadany, Ahmed M.A. & Jaber, Mohamad Y., 2011. "A production/remanufacture model with returns' subassemblies managed differently," International Journal of Production Economics, Elsevier, vol. 133(1), pages 119-126, September.
    12. Taleizadeh, Ata Allah & Moshtagh, Mohammad Sadegh, 2019. "A consignment stock scheme for closed loop supply chain with imperfect manufacturing processes, lost sales, and quality dependent return: Multi Levels Structure," International Journal of Production Economics, Elsevier, vol. 217(C), pages 298-316.
    13. El Saadany, Ahmed M.A. & Jaber, Mohamad Y. & Bonney, Maurice, 2013. "How many times to remanufacture?," International Journal of Production Economics, Elsevier, vol. 143(2), pages 598-604.
    14. Choi, Dae-Won & Hwang, Hark & Koh, Shie-Gheun, 2007. "A generalized ordering and recovery policy for reusable items," European Journal of Operational Research, Elsevier, vol. 182(2), pages 764-774, October.
    15. Felix T.S. Chan & Nan Li & S.H. Chung & Mozafar Saadat, 2017. "Management of sustainable manufacturing systems-a review on mathematical problems," International Journal of Production Research, Taylor & Francis Journals, vol. 55(4), pages 1210-1225, February.
    16. Tahirov, Nail & Hasanov, Parviz & Jaber, Mohamad Y., 2016. "Optimization of closed-loop supply chain of multi-items with returned subassemblies," International Journal of Production Economics, Elsevier, vol. 174(C), pages 1-10.
    17. Konstantaras, I. & Skouri, K., 2010. "Lot sizing for a single product recovery system with variable setup numbers," European Journal of Operational Research, Elsevier, vol. 203(2), pages 326-335, June.
    18. Byung Duk Song & Young Dae Ko, 2017. "Effect of Inspection Policies and Residual Value of Collected Used Products: A Mathematical Model and Genetic Algorithm for a Closed-Loop Green Manufacturing System," Sustainability, MDPI, vol. 9(9), pages 1-14, September.
    19. Meherishi, Lavanya & Narayana, Sushmita A. & Ranjani, K.S., 2021. "Integrated product and packaging decisions with secondary packaging returns and protective packaging management," European Journal of Operational Research, Elsevier, vol. 292(3), pages 930-952.
    20. Jaber, Mohamad Y. & Rosen, Marc A., 2008. "The economic order quantity repair and waste disposal model with entropy cost," European Journal of Operational Research, Elsevier, vol. 188(1), pages 109-120, July.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:zbw:euvwdp:378. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: ZBW - Leibniz Information Centre for Economics (email available below). General contact details of provider: https://edirc.repec.org/data/fwffode.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.