Advanced Search
MyIDEAS: Login to save this paper or follow this series

Paying the price for unreliable power supplies : in-house generation of electricity by firms in Africa

Contents:

Author Info

  • Foster, Vivien
  • Steinbuks, Jevgenijs

Abstract

This paper documents the prevalence of in-house generation of electric power by firms in Sub-Saharan Africa and attempts to identify the underlying causes. The analysis is based on two data sources. The UDI World Electric Power Plants Data Base (WEPP), a global inventory of electric power generating units, provides a detailed inventory of in-house generation at the country level. The World Bank's Enterprise Survey Database captures business perceptions of the obstacles to enterprise growth for 8,483 currently operating firms in 25 African countries. Overall, so-called own generation by firms-which has been on the rise in recent years-accounts for about 6 percent of installed generation capacity in Sub-Saharan Africa (equivalent to at least 4,000 MW of installed capacity). However, this share doubles to around 12 percent in the low-income countries, the post-conflict countries, and more generally on the Western side of the continent. In a handful of countries own generation represents more than 20 percent of capacity. Rigorous empirical analysis shows that unreliable public power supplies is far from being the only or even the largest factor driving generator ownership. Firm characteristics have a major influence-in particular, the probability of owning a generator doubles in large firms relative to small ones. Our model predicts that the prevalence of own generation would remain high (at around 20 percent) even if power supplies were perfectly reliable, suggesting that other factors, such as emergency back-up and export regulations, play a critical role in the decision to own a generator.

Download Info

If you experience problems downloading a file, check if you have the proper application to view it first. In case of further problems read the IDEAS help page. Note that these files are not on the IDEAS site. Please be patient as the files may be large.
File URL: http://www-wds.worldbank.org/servlet/WDSContentServer/WDSP/IB/2009/04/30/000158349_20090430142027/Rendered/PDF/WPS4913.pdf
Download Restriction: no

Bibliographic Info

Paper provided by The World Bank in its series Policy Research Working Paper Series with number 4913.

as in new window
Length:
Date of creation: 01 Apr 2009
Date of revision:
Handle: RePEc:wbk:wbrwps:4913

Contact details of provider:
Postal: 1818 H Street, N.W., Washington, DC 20433
Phone: (202) 477-1234
Email:
Web page: http://www.worldbank.org/
More information through EDIRC

Related research

Keywords: Energy Production and Transportation; Infrastructure Economics; Power&Energy Conversion; E-Business; Energy Technology&Transmission;

This paper has been announced in the following NEP Reports:

References

No references listed on IDEAS
You can help add them by filling out this form.

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as in new window

Cited by:
This item has more than 25 citations. To prevent cluttering this page, these citations are listed on a separate page.

Lists

This item is not listed on Wikipedia, on a reading list or among the top items on IDEAS.

Statistics

Access and download statistics

Corrections

When requesting a correction, please mention this item's handle: RePEc:wbk:wbrwps:4913. See general information about how to correct material in RePEc.

For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: (Roula I. Yazigi).

If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

If references are entirely missing, you can add them using this form.

If the full references list an item that is present in RePEc, but the system did not link to it, you can help with this form.

If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your profile, as there may be some citations waiting for confirmation.

Please note that corrections may take a couple of weeks to filter through the various RePEc services.