Advanced Search
MyIDEAS: Login to save this paper or follow this series

Defining Business Process Maturity. A Journey towards Excellence

Contents:

Author Info

  • A. VAN LOOY

    ()

  • M. DE BACKER
  • G. POELS

Abstract

Organisations are increasingly focusing on their business processes to excel. Since the journey towards process excellence is challenging, various authors have proposed a business process maturity model (BPMM) to gradually improve maturity and capability. Nonetheless, a comprehensive definition for BPMM, maturity and capability is missing. Moreover, the differences between maturity and capability are frequently neglected. Therefore, this study elaborates on the lacking foundation. In particular, a thorough literature study is conducted to address three gaps regarding the BPMM scope, terminology and design. It reveals six basic BPMM components within a business process lifecycle (scope gap): (1) modelling, (2) deployment, (3) optimisation, (4) management, (5) culture, and (6) structure. Their overall growth refers to maturity, whereas the growth of an individual component includes capability (terminology gap). To increase its usability, a BPMM gives guidance on both assessing and improving business processes (design gap).The findings allow clear communication about BPMMs, and new models based on the identified components. This unambiguous understanding helps to avoid confusion and inappropriate assumptions in the business process literature. Future research will further validate the definitions by comparing BPMMs.

Download Info

If you experience problems downloading a file, check if you have the proper application to view it first. In case of further problems read the IDEAS help page. Note that these files are not on the IDEAS site. Please be patient as the files may be large.
File URL: http://www.feb.ugent.be/nl/Ondz/wp/Papers/wp_11_725.pdf
Download Restriction: no

Bibliographic Info

Paper provided by Ghent University, Faculty of Economics and Business Administration in its series Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium with number 11/725.

as in new window
Length: 35 pages
Date of creation: Jun 2011
Date of revision:
Handle: RePEc:rug:rugwps:11/725

Contact details of provider:
Postal: Hoveniersberg 4, B-9000 Gent
Phone: ++ 32 (0) 9 264 34 61
Fax: ++ 32 (0) 9 264 35 92
Web page: http://www.ugent.be/eb
More information through EDIRC

Related research

Keywords: business process maturity; business process capability; business process management; business process orientation; continuous improvement; process excellence; business excellence;

This paper has been announced in the following NEP Reports:

References

No references listed on IDEAS
You can help add them by filling out this form.

Citations

Lists

This item is not listed on Wikipedia, on a reading list or among the top items on IDEAS.

Statistics

Access and download statistics

Corrections

When requesting a correction, please mention this item's handle: RePEc:rug:rugwps:11/725. See general information about how to correct material in RePEc.

For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: (Nathalie Verhaeghe).

If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

If references are entirely missing, you can add them using this form.

If the full references list an item that is present in RePEc, but the system did not link to it, you can help with this form.

If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your profile, as there may be some citations waiting for confirmation.

Please note that corrections may take a couple of weeks to filter through the various RePEc services.