IDEAS home Printed from https://ideas.repec.org/p/pra/mprapa/33877.html
   My bibliography  Save this paper

Adopting Contractors’ Risk Management (CIRIM) Framework using Multi Dimensional Theories

Author

Listed:
  • Ahmad Zaini, Afzan
  • Endut, Intan Rohani
  • Takim, Roshana
  • Mohammad, Mohammad Fadhil

Abstract

In general, many contractors in Malaysia are found to have a limited expertise in developing an appropriate strategy to mitigate project risks. Consequently, this has led contractors struggling to complete the project on schedule, within the client’s budget and quality parameters. This was proven by the current issues on the delayed projects reported in the Ninth Malaysian Plan. Currently in Malaysia, there is no existing risk management framework specifically designed for contractors. Thus, the idea of introducing CIRIM among the Malaysian contractors is a proactive approach to achieve better project objectives. This paper therefore proposes to introduce the CIRIM framework to be adopted by the Malaysian contractors. The research methodology applied in the main research includes literature reviews, questionnaires and interviews. It is found that although there are some forms of risk management systems being used in the Malaysian construction industry, most of them are not well structured, documented and implemented in a formal manner. Therefore, the idea of establishing the CIRIM framework among Malaysian contractors is paramount and justified.

Suggested Citation

  • Ahmad Zaini, Afzan & Endut, Intan Rohani & Takim, Roshana & Mohammad, Mohammad Fadhil, 2011. "Adopting Contractors’ Risk Management (CIRIM) Framework using Multi Dimensional Theories," MPRA Paper 33877, University Library of Munich, Germany.
  • Handle: RePEc:pra:mprapa:33877
    as

    Download full text from publisher

    File URL: https://mpra.ub.uni-muenchen.de/33877/1/MPRA_paper_33877.pdf
    File Function: original version
    Download Restriction: no
    ---><---

    More about this item

    Keywords

    Keywords: Risk Management; Contractors; CIRIM; Construction; Malaysia;
    All these keywords.

    JEL classification:

    • N6 - Economic History - - Manufacturing and Construction
    • L7 - Industrial Organization - - Industry Studies: Primary Products and Construction

    NEP fields

    This paper has been announced in the following NEP Reports:

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pra:mprapa:33877. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Joachim Winter (email available below). General contact details of provider: https://edirc.repec.org/data/vfmunde.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.