Advanced Search
MyIDEAS: Login

Merchant Transmission Investment

Contents:

Author Info

  • Joskow, Paul L.
  • Tirole, Jean

Abstract

We examine the performance attributes of a merchant transmission investment framework that relies on 'market driven' investment to increase transmission network capacity needed to support competitive wholesale markets for electricity. Under a stringent set of assumptions, the merchant investment model has a remarkable set of attributes that appears to solve the natural monopoly problem and the associated need for regulating electric transmission companies. We expand the merchant model to incorporate several attributes of wholesale power markets and transmission networks that the merchant model ignores. These include market power in wholesale electricity markets, lumpiness in transmission investment opportunities, stochastic attributes of transmission networks and associated property rights definition issues, strategic behavior by potential merchant transmission investors and issues related to the coordination of transmission system operators and merchant transmission owners. Incorporating these more realistic attributes of transmission networks and the behavior of transmission owners and system operators leads to the conclusion that several potentially significant inefficiencies may result from reliance on the merchant transmission investment framework. Accordingly, it is inappropriate for policymakers to assume that they can avoid dealing with the many challenges associated with stimulating efficient levels of investment in electric transmission networks by adopting the merchant model. Copyright Blackwell Publishing Ltd. 2005.

(This abstract was borrowed from another version of this item.)

Download Info

If you experience problems downloading a file, check if you have the proper application to view it first. In case of further problems read the IDEAS help page. Note that these files are not on the IDEAS site. Please be patient as the files may be large.
File URL: http://neeo.univ-tlse1.fr/65/1/merchant_05.pdf
Download Restriction: no

Bibliographic Info

Paper provided by University of Toulouse 1 Capitole in its series Open Access publications from University of Toulouse 1 Capitole with number http://neeo.univ-tlse1.fr/65/.

as in new window
Length:
Date of creation: Jun 2005
Date of revision:
Publication status: Published in The Journal of Industrial Economics (2005-06) v.53, p.233-264
Handle: RePEc:ner:toulou:http://neeo.univ-tlse1.fr/65/

Contact details of provider:
Web page: http://www.univ-tlse1.fr/

Related research

Keywords:

Other versions of this item:

Find related papers by JEL classification:

References

References listed on IDEAS
Please report citation or reference errors to , or , if you are the registered author of the cited work, log in to your RePEc Author Service profile, click on "citations" and make appropriate adjustments.:
as in new window
  1. Holmstrom, Bengt & Tirole, Jean, 2000. "Liquidity and Risk Management," Journal of Money, Credit and Banking, Blackwell Publishing, vol. 32(3), pages 295-319, August.
  2. Paul Joskow, 2003. "Electricity Sector Restructuring and Competition: Lessons Learned," Latin American Journal of Economics-formerly Cuadernos de Economía, Instituto de Economía. Pontificia Universidad Católica de Chile., vol. 40(121), pages 548-558.
  3. Jean Tirole, 1988. "The Theory of Industrial Organization," MIT Press Books, The MIT Press, edition 1, volume 1, number 0262200716.
  4. Bushnell, James B & Stoft, Steven E, 1996. "Electric Grid Investment under a Contract Network Regime," Journal of Regulatory Economics, Springer, vol. 10(1), pages 61-79, July.
  5. Oren, Shmuel S. & Spiller, Pablo T. & Varaiya, Pravin & Wu, Felix, 1995. "Nodal prices and transmission rights: A critical appraisal," The Electricity Journal, Elsevier, vol. 8(3), pages 24-35, April.
  6. Chisari, Omar O. & Dal-Bó, Pedro & Romero, Carlos A., 2000. "High-Tension Electricity Network Expansions in Argentina: Decision Mechanisms and Willigness-to-Pay Revelation," UADE Working Papers 9_2000, Instituto de Economía, Universidad Argentina de la Empresa.
  7. Thomas-Olivier Leautier, 2000. "Regulation of an Electric Power Transmission Company," The Energy Journal, International Association for Energy Economics, vol. 0(Number 4), pages 61-92.
  8. Joskow, Paul L & Tirole, Jean, 1999. "Transmission Rights and Market Power on Electric Power Networks I: Financial Rights," CEPR Discussion Papers 2093, C.E.P.R. Discussion Papers.
  9. Robert Wilson, 2002. "Architecture of Power Markets," Econometrica, Econometric Society, vol. 70(4), pages 1299-1340, July.
  10. Roger E. Bohn & Michael C. Caramanis & Fred C. Schweppe, 1984. "Optimal Pricing in Electrical Networks over Space and Time," RAND Journal of Economics, The RAND Corporation, vol. 15(3), pages 360-376, Autumn.
  11. Bushnell, James & Stoft, Steven, 1997. "Improving Private Incentives for Electric Grid Investment," Staff General Research Papers 31549, Iowa State University, Department of Economics.
  12. Bengt Holmstrom, 1981. "Moral Hazard in Teams," Discussion Papers 471, Northwestern University, Center for Mathematical Studies in Economics and Management Science.
  13. Bushnell, James, 1999. "Transmission Rights and Market Power," The Electricity Journal, Elsevier, vol. 12(8), pages 77-85, October.
  14. Green, Richard, 1997. "Transmission pricing in England and Wales," Utilities Policy, Elsevier, vol. 6(3), pages 185-193, September.
  15. Wu, Felix, et al, 1996. "Folk Theorems on Transmission Access: Proofs and Counterexamples," Journal of Regulatory Economics, Springer, vol. 10(1), pages 5-23, July.
  16. Green, Richard, 1999. "The Electricity Contract Market in England and Wales," Journal of Industrial Economics, Wiley Blackwell, vol. 47(1), pages 107-24, March.
  17. Aghion, Philippe & Bolton, Patrick, 1987. "Contracts as a Barrier to Entry," American Economic Review, American Economic Association, vol. 77(3), pages 388-401, June.
  18. Glachant, Jean-Michel & Pignon, Virginie, 2005. "Nordic congestion's arrangement as a model for Europe? Physical constraints vs. economic incentives," Utilities Policy, Elsevier, vol. 13(2), pages 153-162, June.
  19. Chao, Hung-Po & Peck, Stephen, 1996. "A Market Mechanism for Electric Power Transmission," Journal of Regulatory Economics, Springer, vol. 10(1), pages 25-59, July.
  20. Vogelsang, Ingo, 2001. "Price Regulation for Independent Transmission Companies," Journal of Regulatory Economics, Springer, vol. 20(2), pages 141-65, September.
  21. Hogan, William W, 1992. "Contract Networks for Electric Power Transmission," Journal of Regulatory Economics, Springer, vol. 4(3), pages 211-42, September.
  22. Steven Stoft, 1999. "Financial Transmission Rights Meet Cournot: How TCCs Curb Market Power," The Energy Journal, International Association for Energy Economics, vol. 0(Number 1), pages 1-23.
  23. Joshua S. Gans & Stephen P. King, 2000. "Options for Electricity Transmission Regulation in Australia," Australian Economic Review, The University of Melbourne, Melbourne Institute of Applied Economic and Social Research, vol. 33(2), pages 145-160.
Full references (including those not matched with items on IDEAS)

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as in new window

Cited by:
This item has more than 25 citations. To prevent cluttering this page, these citations are listed on a separate page.

Lists

This item is not listed on Wikipedia, on a reading list or among the top items on IDEAS.

Statistics

Access and download statistics

Corrections

When requesting a correction, please mention this item's handle: RePEc:ner:toulou:http://neeo.univ-tlse1.fr/65/

For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: (Main contact person).

If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

If references are entirely missing, you can add them using this form.

If the full references list an item that is present in RePEc, but the system did not link to it, you can help with this form.

If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your profile, as there may be some citations waiting for confirmation.

Please note that corrections may take a couple of weeks to filter through the various RePEc services.