Advanced Search
MyIDEAS: Login

A production-inventory control model with a mixture of back-orders and lost sales

Contents:

Author Info

  • Talman, A.J.J.

    (Tilburg University)

  • Duyn Schouten, F.A. van der

    (Tilburg University)

  • Doshi, B.T.

Abstract

We consider a production-inventory control model of finite capacity, in which backordering up to a certain level is allowed. We assume that there exist two possible production rates. The control is based on two critical stock-levels and prescribes to change the production rate used only when one of these levels is reached. A fixed cost is associated with every switch-over. The rate at which customers arrive and the distribution of the demand of an arriving customer depend on the production rate used at that moment. A formula for the long-run average expected costs per unit time is obtained as a function of the chosen critical levels. From this formula we derive expressions for various interesting operating characteristics of this system, amongst which are the joint stationary distribution of the processes describing the production rate used and the inventory of the system and the average number of switch-overs and lost-sales per unit time.

(This abstract was borrowed from another version of this item.)

Download Info

If you experience problems downloading a file, check if you have the proper application to view it first. In case of further problems read the IDEAS help page. Note that these files are not on the IDEAS site. Please be patient as the files may be large.
File URL: http://arno.uvt.nl/show.cgi?fid=26877
Our checks indicate that this address may not be valid because: 404 Not Found. If this is indeed the case, please notify (Economists Online Support)
Download Restriction: no

Bibliographic Info

Paper provided by Tilburg University in its series Open Access publications from Tilburg University with number urn:nbn:nl:ui:12-153005.

as in new window
Length:
Date of creation: 1978
Date of revision:
Publication status: Published in Management Science (1978) v.24, p.1078-1086
Handle: RePEc:ner:tilbur:urn:nbn:nl:ui:12-153005

Contact details of provider:
Web page: http://www.tilburguniversity.edu/

Related research

Keywords:

Other versions of this item:

References

No references listed on IDEAS
You can help add them by filling out this form.

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as in new window

Cited by:
  1. van Ooijen, H. P. G. & Bertrand, J. W. M., 2003. "The effects of a simple arrival rate control policy on throughput and work-in-process in production systems with workload dependent processing rates," International Journal of Production Economics, Elsevier, vol. 85(1), pages 61-68, July.
  2. Lee, Shine-Der & Lan, Shu-Chuan, 2013. "Production lot sizing with a secondary outsourcing facility," International Journal of Production Economics, Elsevier, vol. 141(1), pages 414-424.
  3. Van der Duyn Schouten, F. A. & Vanneste, S. G., 1995. "Maintenance optimization of a production system with buffer capacity," European Journal of Operational Research, Elsevier, vol. 82(2), pages 323-338, April.

Lists

This item is not listed on Wikipedia, on a reading list or among the top items on IDEAS.

Statistics

Access and download statistics

Corrections

When requesting a correction, please mention this item's handle: RePEc:ner:tilbur:urn:nbn:nl:ui:12-153005. See general information about how to correct material in RePEc.

For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: (Economists Online Support).

If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

If references are entirely missing, you can add them using this form.

If the full references list an item that is present in RePEc, but the system did not link to it, you can help with this form.

If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your profile, as there may be some citations waiting for confirmation.

Please note that corrections may take a couple of weeks to filter through the various RePEc services.