Advanced Search
MyIDEAS: Login

Investeringar i kraftvärme – Ekonomiska och miljömässiga fördelar

Contents:

Author Info

  • Bergendahl, Göran

    () (Department of Business Administration, School of Business, Economics and Law, Göteborg University)

Registered author(s):

    Abstract

    This study investigates the advantages of investing in plants for cogeneration, i.e. combined heat and power (CHP), when the heat is utilized for district heating. A focus is set on Swedish municipalities. The demand for heat is visualized in terms of load curves and duration diagrams. A standard diagram is chosen in order to analyze the dimensioning of a CHP plant. Two alternative sizes are studied: operating a plant with full capacity in eight or in six months of the year. For each alternative, a CHP plant is compared to a heat water plant (a “boiler”) and biological fuel is compared to natural gas. It is shown a) that a CHP plant based on biological fuel is profitable and outstanding, and that it is an economic advantage to expand the dimension of such a plant in order to operate with full capacity in six months of the year only. These theoretical findings are then illustrated by case studies from eight large Swedish municipalities – Göteborg, Helsingborg, Linköping, Lund, Malmö, Stockholm, Uppsala, and Västerås. From these studies it becomes evident that the use of cogeneration is often limited both by contracted deliveries of waste heat from industries and sewage destruction plants and by the slope of the duration diagram. The flatter the duration diagram is, the more efficient the use of cogeneration will become.

    Download Info

    If you experience problems downloading a file, check if you have the proper application to view it first. In case of further problems read the IDEAS help page. Note that these files are not on the IDEAS site. Please be patient as the files may be large.
    File URL: http://hdl.handle.net/2077/9629
    Download Restriction: no

    Bibliographic Info

    Paper provided by University of Gothenburg, Department of Business Administration in its series FE rapport with number 2008-413.

    as in new window
    Length: 32 pages
    Date of creation: 05 Mar 2008
    Date of revision:
    Handle: RePEc:hhb:gunwba:2008_413

    Contact details of provider:
    Postal: Dept of Business Adminstration, School of Business, Economics and Law, University of Gothenburg, Box 610, SE 405 30 Göteborg, Sweden
    Web page: http://www.handels.gu.se/fek/
    More information through EDIRC

    Related research

    Keywords: Cogeneration; duration diagrams; taxation principles; cost-benefit analyses; case studies;

    This paper has been announced in the following NEP Reports:

    References

    No references listed on IDEAS
    You can help add them by filling out this form.

    Citations

    Lists

    This item is not listed on Wikipedia, on a reading list or among the top items on IDEAS.

    Statistics

    Access and download statistics

    Corrections

    When requesting a correction, please mention this item's handle: RePEc:hhb:gunwba:2008_413

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: (Maria Persson).

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If references are entirely missing, you can add them using this form.

    If the full references list an item that is present in RePEc, but the system did not link to it, you can help with this form.

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your profile, as there may be some citations waiting for confirmation.

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.