Cremers, Marloes Klein Haneveld, Wim van der Vlerk, Maarten (Groningen University)
Abstract
Abstract We consider a dynamic planning problem for the transport of elderly and disabled people. The focus is on a decision to make one day ahead: which requests to serve with own vehicles, and which ones to assign to subcontractors, under uncertainty of late requests which are gradually revealed during the day of operation. We call this problem the Dynamic Day-ahead Paratransit Planning problem. The developed model is a nonstandard two-stage recourse model in which ideas from stochastic programming and online optimization are combined: in the first stage clustered requests are assigned to vehicles, and in the dynamic second-stage problem an event-driven approach is used to cluster the late requests once they are revealed and subsequently assign them to vehicles. A genetic algorithm is used to solve the model. Computational results are presented for randomly generated data sets. Furthermore, a comparison is made to a similar problem we studied earlier in which the simplifying but unrealistic assumption has been made that all late requests are revealed at the beginning of the day of operation.
Download Info
To download:
If you experience problems downloading a file, check if you have the
proper application to
view it first. Information about this may be contained
in the File-Format links below. In case of further problems read
the IDEAS help
page. Note that these files are not on the IDEAS
site. Please be patient as the files may be large.
Publisher Info
Paper provided by University of Groningen, Research Institute SOM (Systems, Organisations and Management) in its series Research Report with number
07010.