Contents:

Author Info

  • Gürkan, G.
  • Ozdemir, O.
  • smeers, Y.

    (Tilburg University, Center for Economic Research)

Registered author(s):

    Abstract

    Abstract: In competitive electricity markets, markets designs based on power exchanges where supply bidding (barring demand-side bidding) is at the sole short run marginal cost may not guarantee resource adequacy. As alternative ways to remedy the resource adequacy problem, we focus on three different market designs in detail when demand is inelastic, namely an energy-only market with VOLL pricing (or a price cap), an additional capacity market, and operating-reserve pricing. We also discuss demand-side bidding (i.e., a price responsive demand) which can be seen as a categorically different alternative to remedy the resource adequacy problem. We consider a perfectly competitive market consisting of three types of agents: generators, a transmission system operator, and consumers; all agents are assumed to have no market power. For each market design, we model and analyze capacity investment choices of firms using a two-stage game where generation capacities are installed in the first stage and generation takes place in future spot markets at the second stage. When future spot market conditions are assumed to be known a priori (i.e., deterministic demand case), we show that all of these two-stage models with different market mechanisms, except operating-reserve pricing, can be cast as single optimization problems. When future spot market conditions are not known in advance (i.e., under demand uncertainty), we essentially have a two-stage stochastic game. Interestingly, an equilibrium point of this stochastic game can be found by solving a two-stage stochastic program, in case of all of the market mechanisms except operating-reserve pricing. In case of operatingreserve pricing, while the formulation of an equivalent deterministic or stochastic optimization problem is possible when operating-reserves are based on observed demand, this simplicity is lost when operatingreserves are based on installed capacities. We generalize these results for other uncertain parameters in spot markets such as fuel costs and transmission capacities. Finally, we illustrate how all these models can be numerically tackled and present numerical experiments. In our numerical experiments, we observe that uncertainty of demand leads to higher total generation capacity expansion and a broader mix of technologies compared to the investment decisions assuming average demand levels. Furthermore for the same VOLL (or price cap) level and under the assumptions of random demand with finite support and no forced outages, energy-onlymarkets with VOLL pricing tend to lead to total generation capacity below the peak load with a certain probability whereas energy markets with a forward capacity market or operating-reserve pricing result in higher investments. Finally, the regulator decisions (e.g., reserve capacity target) in capacity markets and operating-reserve pricing can be chosen in such a way that results in very similar investment levels and fuel mix of generation capacities in b

    Download Info

    If you experience problems downloading a file, check if you have the proper application to view it first. In case of further problems read the IDEAS help page. Note that these files are not on the IDEAS site. Please be patient as the files may be large.
    File URL: http://arno.uvt.nl/show.cgi?fid=130943
    Our checks indicate that this address may not be valid because: 404 Not Found. If this is indeed the case, please notify (Richard Broekman)
    Download Restriction: no

    Bibliographic Info

    Paper provided by Tilburg University, Center for Economic Research in its series Discussion Paper with number 2013-045.

    as in new window
    Length:
    Date of creation: 2013
    Date of revision:
    Handle: RePEc:dgr:kubcen:2013045

    Contact details of provider:
    Web page: http://center.uvt.nl

    Related research

    Keywords:

    This paper has been announced in the following NEP Reports:

    References

    References listed on IDEAS
    Please report citation or reference errors to , or , if you are the registered author of the cited work, log in to your RePEc Author Service profile, click on "citations" and make appropriate adjustments.:
    as in new window
    1. Chao, Hung-Po & Peck, Stephen C, 1998. "Reliability Management in Competitive Electricity Markets," Journal of Regulatory Economics, Springer, vol. 14(2), pages 189-200, September.
    2. Crew, Michael A & Fernando, Chitru S & Kleindorfer, Paul R, 1995. "The Theory of Peak-Load Pricing: A Survey," Journal of Regulatory Economics, Springer, vol. 8(3), pages 215-48, November.
    3. Peter Cramton & Steven Stoft, 2006. "The Convergence of Market Designs for Adequate Generating Capacity," Papers of Peter Cramton 06mdfra, University of Maryland, Department of Economics - Peter Cramton, revised 2006.
    4. Joskow, Paul L., 2008. "Capacity payments in imperfect electricity markets: Need and design," Utilities Policy, Elsevier, vol. 16(3), pages 159-170, September.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as in new window

    Cited by:
    1. Gürkan, Gül & Langestraat, Romeo, 2014. "Modeling and analysis of renewable energy obligations and technology bandings in the UK electricity market," Energy Policy, Elsevier, vol. 70(C), pages 85-95.

    Lists

    This item is not listed on Wikipedia, on a reading list or among the top items on IDEAS.

    Statistics

    Access and download statistics

    Corrections

    When requesting a correction, please mention this item's handle: RePEc:dgr:kubcen:2013045. See general information about how to correct material in RePEc.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: (Richard Broekman).

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If references are entirely missing, you can add them using this form.

    If the full references list an item that is present in RePEc, but the system did not link to it, you can help with this form.

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your profile, as there may be some citations waiting for confirmation.

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.