Short-term performance of a production management system for make-to-stock factories may be quantified through the service rate per shift; long-term performance through the average monthly work in process (WIP). This may yield, for example, that WIP is minimized, while the probability of the service rate being higher than 95% still exceeds 0.90. By robustness the Japanese quality guru Taguchi meant that controllable factors (inputs) are selected such that good performance results, while the undesirable effects of environmental inputs are minimized. This paper, however, is the first to investigate robustness through risk analysis, which uses Latin hypercube sampling (LHS) to estimate the probabilities of specific system outputs for different environmental scenarios. To derive a confidence region for the resulting system performance, this paper uses bootstrapping. Short-term robustness is illustrated for a four-stage production line and several productioncontrol systems, namely Kanban, Conwip, Hybrid, and Generic. In this example, Hybrid turns out to be best. However, when risk is ignored, then Generic is best; so risk considerations do make a difference! The methodology can be easily applied to any practical production management situation, as it combines the standard techniques of simulation, heuristic optimization, risk analysis, and bootstrapping.

Download Info

If you experience problems downloading a file, check if you have the proper application to view it first. In case of further problems read the IDEAS help page. Note that these files are not on the IDEAS site. Please be patient as the files may be large.
File URL: http://arno.uvt.nl/show.cgi?fid=115153
Our checks indicate that this address may not be valid because: 404 Not Found. If this is indeed the case, please notify (Richard Broekman)
Download Restriction: no

File URL: http://arno.uvt.nl/show.cgi?fid=115152
Our checks indicate that this address may not be valid because: 404 Not Found. If this is indeed the case, please notify (Richard Broekman)
Download Restriction: no

Bibliographic Info

Paper provided by Tilburg University, Center for Economic Research in its series Discussion Paper with number 1998-070.

as in new window
Length:
Date of creation: 1998
Date of revision:
Handle: RePEc:dgr:kubcen:1998070

Contact details of provider:
Web page: http://center.uvt.nl

Related research

Keywords: robustness; risk; uncertainty; short-term; transient performance; production management;

Find related papers by JEL classification:

References

No references listed on IDEAS
You can help add them by filling out this form.

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as in new window

Cited by:
  1. Luis Vildosola, 2002. "Circular Variable Work In Process," Macroeconomics 0203004, EconWPA.

Lists

This item is not listed on Wikipedia, on a reading list or among the top items on IDEAS.

Statistics

Access and download statistics

Corrections

When requesting a correction, please mention this item's handle: RePEc:dgr:kubcen:1998070. See general information about how to correct material in RePEc.

For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: (Richard Broekman).

If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

If references are entirely missing, you can add them using this form.

If the full references list an item that is present in RePEc, but the system did not link to it, you can help with this form.

If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your profile, as there may be some citations waiting for confirmation.

Please note that corrections may take a couple of weeks to filter through the various RePEc services.