While the net present value (NPV) approach is widely accepted as the right framework for studying production and inventory control systems, average cost (AC) models are more widely used. For the well known EOQ model it can be verified that (under certain conditions) the AC approach gives near optimal results, but does this also hold for more complex systems? In this paper it is argued that for more complex systems, like multi-source systems, one has to be extremely careful in applying the AC approach on intuition alone, even when these systems are deterministic. Special attention is given to a two-source inventory system with manufacturing, remanufacturing, and disposal, and it is shown that for this type of models there is a considerable gap between the AC approach and the NPV approach.
Download Info
To download:
If you experience problems downloading a file, check if you have the
proper application to
view it first. Information about this may be contained
in the File-Format links below. In case of further problems read
the IDEAS help
page. Note that these files are not on the IDEAS
site. Please be patient as the files may be large.
Publisher Info
Paper provided by Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam. in its series Research Paper with number
ERS-2000-47-LIS Revision_Date: 2009-11-06.
References listed on IDEAS Please report citation or reference errors to , or , if you are the registered author of the cited work, log in to your RePEc Author Service profile, click on "citations" and make appropriate adjustments.:
Cited by: (explanations, Please report citation or reference errors to , or , if you are the registered author of the cited work, log in to your RePEc Author Service profile, click on "citations" and make appropriate adjustments.)