Multiple-Depot Integrated Vehicle and Crew Scheduling
Abstract
This paper presents two different models and algorithms for integrated vehicle and crew scheduling in the multiple-depot case. The algorithms are both based on a combination of column generation and Lagrangian relaxation. Furthermore, we compare those integrated approaches with each other and with the traditional sequential one on random generated as well as real-world data instances for a suburban/extra-urban mass transit system. To simulate such a transit system, we propose a new way of generating randomly data instances such that their properties are the same as for our real-world instances.Download Info
If you experience problems downloading a file, check if you have the proper application to view it first. In case of further problems read the IDEAS help page. Note that these files are not on the IDEAS site. Please be patient as the files may be large.Bibliographic Info
Paper provided by Erasmus University Rotterdam, Econometric Institute in its series Econometric Institute Report with number EI 2003-02.Length:
Date of creation: 17 Feb 2003
Date of revision:
Handle: RePEc:dgr:eureir:1765001684
Contact details of provider:
Web page: http://www.few.eur.nl/few
Related research
Keywords: crew scheduling; vehicle scheduling; integrated vehicle and crew scheduling;References
No references listed on IDEASYou can help add them by filling out this form.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.Cited by:
- Huisman, D. & Jans, R.F. & Peeters, M. & Wagelmans, A.P.M., 2003. "Combining Column Generation and Lagrangian Relaxation," Research Paper ERS-2003-092-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus Uni.
- Eliashberg, J. & Hegie, Q. & Ho, J. & Huisman, D. & Miller, S.J. & Swami, S. & Weinberg, C.B. & Wierenga, B., 2007.
"Demand-driven scheduling of movies in a multiplex,"
Econometric Institute Report
EI 2007-17, Erasmus University Rotterdam, Econometric Institute.
- Eliashberg, J. & Hegie, Q. & Ho, J. & Huisman, D. & Miller, S.J. & Swami, S. & Weinberg, C.B. & Wierenga, B., 2007. "Demand-Driven Scheduling of Movies in a Multiplex," Research Paper ERS-2007-033-MKT, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus Uni.
- Groot, S.W. de & Huisman, D., 2004. "Vehicle and crew scheduling: solving large real-world instances with an integrated approach," Econometric Institute Report EI 2004-13, Erasmus University Rotterdam, Econometric Institute.
Lists
This item is not listed on Wikipedia, on a reading list or among the top items on IDEAS.Statistics
Access and download statisticsCorrections
When requesting a correction, please mention this item's handle: RePEc:dgr:eureir:1765001684For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: (Anneke Kop).
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If references are entirely missing, you can add them using this form.
If the full references list an item that is present in RePEc, but the system did not link to it, you can help with this form.
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your profile, as there may be some citations waiting for confirmation.
Please note that corrections may take a couple of weeks to filter through the various RePEc services.

