IDEAS home Printed from https://ideas.repec.org/a/taf/japsta/v30y2003i4p397-409.html
   My bibliography  Save this article

Economic statistical design of x ¥ control charts for systems with gamma ( 5 ,2) in-control times

Author

Listed:
  • Hajaj Al-Oraini
  • M. A. Rahim

Abstract

In this paper, gamma ( 5 ,2) distribution is considered as a failure model for the economic statistical design of x ¥ control charts. The study shows that the statistical performance of control charts can be improved significantly, with only a slight increase in the cost, by adding constraints to the optimization problem. The use of an economic statistical design instead of an economic design results in control charts that may be less expensive to implement, that have lower false alarm rates, and that have a higher probability of detecting process shifts. Numerical examples are presented to support this proposition. The results of economic statistical design are compared with those of a pure economic design. The effects of adding constraints for statistical performance measures, such as Type I error rate and the power of the chart, are extensively investigated.

Suggested Citation

  • Hajaj Al-Oraini & M. A. Rahim, 2003. "Economic statistical design of x ¥ control charts for systems with gamma ( 5 ,2) in-control times," Journal of Applied Statistics, Taylor & Francis Journals, vol. 30(4), pages 397-409.
  • Handle: RePEc:taf:japsta:v:30:y:2003:i:4:p:397-409
    DOI: 10.1080/0266476032000035430
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/0266476032000035430
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/0266476032000035430?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Prabhu, Sharad S. & Montgomery, Douglas C. & Runger, George C., 1997. "Economic-statistical design of an adaptive chart," International Journal of Production Economics, Elsevier, vol. 49(1), pages 1-15, March.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Ching-Hsin Wang & Feng-Chia Li, 2020. "Economic design under gamma shock model of the control chart for sustainable operations," Annals of Operations Research, Springer, vol. 290(1), pages 169-190, July.
    2. F L Chen & C H Yeh, 2011. "Economic statistical design for x-bar control charts under non-normal distributed data with Weibull in-control time," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(4), pages 750-759, April.
    3. Chen, Huifen & Cheng, Yuyen, 2007. "Non-normality effects on the economic-statistical design of charts with Weibull in-control time," European Journal of Operational Research, Elsevier, vol. 176(2), pages 986-998, January.
    4. M. A. Pasha & M. Bameni Moghadam & M. A. Rahim, 2020. "Effects of non-normal quality data on the integrated model of imperfect maintenance, early replacement, and economic design of $${\bar{X}}$$ X ¯ -control charts," Operational Research, Springer, vol. 20(4), pages 2519-2536, December.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. De Magalhaes, Maysa S. & Moura Neto, Francisco D., 2005. "Joint economic model for totally adaptive and R charts," European Journal of Operational Research, Elsevier, vol. 161(1), pages 148-161, February.
    2. De Magalhaes, Maysa S. & B. Costa, Antonio F. & Moura Neto, Francisco D., 2006. "Adaptive control charts: A Markovian approach for processes subject to independent disturbances," International Journal of Production Economics, Elsevier, vol. 99(1-2), pages 236-246, February.
    3. Linderman, Kevin & McKone-Sweet, Kathleen E. & Anderson, John C., 2005. "An integrated systems approach to process control and maintenance," European Journal of Operational Research, Elsevier, vol. 164(2), pages 324-340, July.
    4. Mahadik Shashibhushan B. & Shirke Digambar T., 2007. "Economic Design of A Modified Variable Sample Size and Sampling Interval Chart," Stochastics and Quality Control, De Gruyter, vol. 22(2), pages 273-293, January.
    5. Celano, Giovanni & De Magalhães, Maysa S. & Costa, Antonio F.B. & Fichera, Sergio, 2011. "A stochastic shift model for economically designed charts constrained by the process stage configuration," International Journal of Production Economics, Elsevier, vol. 132(2), pages 315-325, August.
    6. Chen, Yan-Kwang & Hsieh, Kun-Lin & Chang, Cheng-Chang, 2007. "Economic design of the VSSI control charts for correlated data," International Journal of Production Economics, Elsevier, vol. 107(2), pages 528-539, June.
    7. Lin, Yu-Chang & Chou, Chao-Yu, 2005. "On the design of variable sample size and sampling intervals charts under non-normality," International Journal of Production Economics, Elsevier, vol. 96(2), pages 249-261, May.
    8. Reza Pourtaheri, 2022. "Economic Statistical Design for Three-level Control Charts with Variable Sample Size," Sankhya B: The Indian Journal of Statistics, Springer;Indian Statistical Institute, vol. 84(1), pages 130-145, May.
    9. Lee, Pei-Hsi & Torng, Chau-Chen & Liao, Li-Fang, 2012. "An economic design of combined double sampling and variable sampling interval X¯ control chart," International Journal of Production Economics, Elsevier, vol. 138(1), pages 102-106.
    10. De Magalhães, M.S. & Costa, A.F.B. & Moura Neto, F.D., 2009. "A hierarchy of adaptive control charts," International Journal of Production Economics, Elsevier, vol. 119(2), pages 271-283, June.
    11. Torng, Chau-Chen & Lee, Pei-Hsi & Liao, Nai-Yi, 2009. "An economic-statistical design of double sampling control chart," International Journal of Production Economics, Elsevier, vol. 120(2), pages 495-500, August.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:japsta:v:30:y:2003:i:4:p:397-409. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/CJAS20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.