This file is part of IDEAS, which uses RePEc data


[ Papers | Articles | Software | Books | Chapters | Authors | Institutions | JEL Classification | NEP reports | Search | New papers by email | Author registration | Rankings | Volunteers | FAQ | Blog | Help! ]

Predicting downtime costs of tracked hydraulic excavators operating in the UK opencast mining industry

Author info | Abstract | Publisher info | Download info | Related research | Statistics
Author Info
David J. Edwards
Gary D. Holt
Frank C. Harris
Abstract

This paper describes the development of a model to predict the hourly cost of downtime (using regression equations) for tracked hydraulic excavators operating in the UK opencast mining industry. A three-stage process was utilized for the model's development. The first stage predicted machine cycle times, the second predicted hire costs per hour and the third used the outputs of the first two to forecast the cost of breakdown. Both cycle time and hire cost models were revealed to be good predictors, as exhibited by the 'high' R 2 values of 0.86 and 0.95, respectively. A plant expert employed within the Defence Logistics Organisation, UK Ministry of Defence, validated these regression models and the process by which downtime costs were predicted. Future research work will aim to enhance the predictive ability of the models developed, expand the research to cover other machine types, and reproduce the findings in graphical and tabular format to improve the interpretation of information generated.

Download Info
To download:

If you experience problems downloading a file, check if you have the proper application to view it first. Information about this may be contained in the File-Format links below. In case of further problems read the IDEAS help page. Note that these files are not on the IDEAS site. Please be patient as the files may be large.

File URL: http://taylorandfrancis.metapress.com/link.asp?target=contribution&id=FDHX9EYV0A2LLPKL
File Format: text/html
File Function:
Download Restriction: Access to full text is restricted to subscribers.

As the access to this document is restricted, you may want to look for a different version under "Related research" (further below) or search for a different version of it.

Publisher Info
Article provided by Taylor and Francis Journals in its journal Construction Management & Economics.

Volume (Year): 20 (2002)
Issue (Month): 7 (October)
Pages: 581-591
Download reference. The following formats are available: HTML (with abstract), plain text (with abstract), BibTeX, RIS (EndNote, RefMan, ProCite), ReDIF
Handle: RePEc:taf:conmgt:v:20:y:2002:i:7:p:581-591

Contact details of provider:
Web page: http://taylorandfrancis.metapress.com/link.asp?target=journal&id=100154

Order Information:
Web: http://www.tandf.co.uk/journals/subscription.html

For technical questions regarding this item, or to correct its listing, contact: (Christopher F. Baum).

Related research
Keywords: Construction Plant; Machine Cycle Time; Productivity; Downtime Cost; Regression Analysis;

Statistics
Access and download statistics

Did you know? Springer Verlag was the first commercial publisher to be listed on RePEc.

This page was last updated on 2010-1-1.


This information is provided to you by IDEAS at the Department of Economics, College of Liberal Arts and Sciences, University of Connecticut using RePEc data on a server sponsored by the Society for Economic Dynamics.