This file is part of IDEAS, which uses RePEc data


[ Papers | Articles | Software | Books | Chapters | Authors | Institutions | JEL Classification | NEP reports | Search | New papers by email | Author registration | Rankings | Volunteers | FAQ | Blog | Help! ]

Three methods for verifying and validating the simulation of a construction operation

Author info | Abstract | Publisher info | Download info | Related research | Statistics
Author Info
Jonathan Jingsheng Shi
Abstract

A simulation model must be verified to confirm that it describes correctly its intended real world process under study; moreover, the simulation results obtained must be a valid representation of the process. This study presents three activity-based white-box methods for assisting a user in verifying and validating construction simulations. The first method reports a simulation by listing all activities in the chronological order of their executions, so that a user can contrast the simulated progress against the actual progress in the real world. The second method summarizes the operating counts and mean durations of all activities over the simulated time period, to enable a user to evaluate whether all activities have been executed correctly during simulation. The third method generates an activity cycle report for any selected resource entity, so that a user can examine whether the entity is moving in the correct logical and chronological order during simulation. The three methods can be used jointly to debug a simulation model, so as to confirm that the simulation is correctly conducted and the obtained results are valid. The three methods are implemented in a simulation system in the form of corresponding reports. A concreting process is employed to illustrate these methods.

Download Info
To download:

If you experience problems downloading a file, check if you have the proper application to view it first. Information about this may be contained in the File-Format links below. In case of further problems read the IDEAS help page. Note that these files are not on the IDEAS site. Please be patient as the files may be large.

File URL: http://taylorandfrancis.metapress.com/link.asp?target=contribution&id=DKG8DWB6U9ALGPL1
File Format: text/html
File Function:
Download Restriction: Access to full text is restricted to subscribers.

As the access to this document is restricted, you may want to look for a different version under "Related research" (further below) or search for a different version of it.

Publisher Info
Article provided by Taylor and Francis Journals in its journal Construction Management & Economics.

Volume (Year): 20 (2002)
Issue (Month): 6 (September)
Pages: 483-491
Download reference. The following formats are available: HTML (with abstract), plain text (with abstract), BibTeX, RIS (EndNote, RefMan, ProCite), ReDIF
Handle: RePEc:taf:conmgt:v:20:y:2002:i:6:p:483-491

Contact details of provider:
Web page: http://taylorandfrancis.metapress.com/link.asp?target=journal&id=100154

Order Information:
Web: http://www.tandf.co.uk/journals/subscription.html

For technical questions regarding this item, or to correct its listing, contact: (Christopher F. Baum).

Related research
Keywords: Computer Simulation; Simulation Modelling; Validation; Verification; Construction Planning; Simulation Of Construction Operations; Construction Process;

Statistics
Access and download statistics

Did you know? The RePEc project started in 1997. Its precursor, NetEc, dates back to 1993.

This page was last updated on 2009-12-5.


This information is provided to you by IDEAS at the Department of Economics, College of Liberal Arts and Sciences, University of Connecticut using RePEc data on a server sponsored by the Society for Economic Dynamics.