Mahmood Zakeri, Paul O. Olomolaiye, Gary D. Holt, Frank C. Harris
Abstract
Construction productivity is rarely analysed in Iran. If productivity is to improve, current weaknesses must be identified. To this end data were collected through a structured questionnaire survey. By utilizing the relative index ranking technique, the identified problems were prioritized for detailed analysis and discussion. Results indicate that the five highest-ranking problems are: Materials shortage, weather and site conditions, equipment breakdown, drawing deficiencies/change orders, and lack of proper tools and equipment. Devastating war with neighbouring Iraq has led to a boom in construction activities leading to shortages of construction materials. The casual employment of the majority of construction operatives and poor managerial skills are the significant contributors to low productivity on Iranian construction sites.
Download Info
To download:
If you experience problems downloading a file, check if you have the
proper application to
view it first. Information about this may be contained
in the File-Format links below. In case of further problems read
the IDEAS help
page. Note that these files are not on the IDEAS
site. Please be patient as the files may be large.
As the access to this document is restricted, you may want to look for a different version under "Related research" (further below) or search for a different version of it.
Volume (Year): 14 (1996) Issue (Month): 5 (September) Pages: 417-426 Download reference. The following formats are available: HTML
(with abstract),
plain text
(with abstract),
BibTeX,
RIS (EndNote, RefMan, ProCite),
ReDIF
Cited by: (explanations, Please report citation or reference errors to , or , if you are the registered author of the cited work, log in to your RePEc Author Service profile, click on "citations" and make appropriate adjustments.)