Two heuristics for scheduling multiple projects with resource constraints

Author info | Abstract | Publisher info | Download info | Related research | Statistics
Author Info
Deng Maw Tsai, Huan Neng Chiu
Abstract

The purpose of this paper is to develop two efficient heuristic priority rules for the resource-constrained multiproject scheduling problem. The aptness of the two heuristic rules is analysed in terms of several dynamic characteristics of the scheduling problem. Fifteen heuristic rules presented in previous studies are used for comparison with the two heuristic rules on 4941 test problems which were generated by combining two, three or four projects from seven typical networks. The results indicate that the two proposed heuristics are superior to the other scheduling rules under the performance criteria of the minimum total project delay and the maximum number of times that a scheduling rule can obtain the best solution. Encouragingly, the two heuristic rules are proven to be adaptive and stable enough for scheduling under different problem sizes, network structures and degrees of resource tightness. As a result, the two proposed rules are the best representatives of the single priority rule method and the weighted combination search method, respectively. This study also includes a categorization process on which a project summary measure is based and then provides project schedulers with a convenient scheme to adopt appropriate scheduling rules.

Download Info
To download:

If you experience problems downloading a file, check if you have the proper application to view it first. Information about this may be contained in the File-Format links below. In case of further problems read the IDEAS help page. Note that these files are not on the IDEAS site. Please be patient as the files may be large.

File URL: http://taylorandfrancis.metapress.com/link.asp?target=contribution&id=XBQ0H3W3BNRDRQ7Q
File Format: text/html
File Function:
Download Restriction: Access to full text is restricted to subscribers.

As the access to this document is restricted, you may want to look for a different version under "Related research" (further below) or search for a different version of it.

Publisher Info
Article provided by Taylor and Francis Journals in its journal Construction Management & Economics.

Volume (Year): 14 (1996)
Issue (Month): 4 (July)
Pages: 325-340
Download reference. The following formats are available: HTML (with abstract), plain text (with abstract), BibTeX, RIS (EndNote, RefMan, ProCite), ReDIF
Handle: RePEc:taf:conmgt:v:14:y:1996:i:4:p:325-340

Contact details of provider:
Web page: http://taylorandfrancis.metapress.com/link.asp?target=journal&id=100154

Order Information:
Web: http://www.tandf.co.uk/journals/subscription.html

For technical questions regarding this item, or to correct its listing, contact: (Christopher F. Baum).

Related research
Keywords: Multiproject Scheduling; Heuristic Rules; Delay; Scheduling; Resource Allocation;

Other versions of this item:

References listed on IDEAS
Please report citation or reference errors to , or , if you are the registered author of the cited work, log in to your RePEc Author Service profile, click on "citations" and make appropriate adjustments.:
  1. Boctor, Fayer F., 1990. "Some efficient multi-heuristic procedures for resource-constrained project scheduling," European Journal of Operational Research, Elsevier, vol. 49(1), pages 3-13, November. [Downloadable!] (restricted)
Full references

Cited by:
(explanations, Please report citation or reference errors to , or , if you are the registered author of the cited work, log in to your RePEc Author Service profile, click on "citations" and make appropriate adjustments.)

  1. Sou-Sen Leu, Chung-Huei Yang, 1999. "A genetic-algorithm-based resource-constrained construction scheduling system," Construction Management & Economics, Taylor and Francis Journals, vol. 17(6), pages 767-776, November. [Downloadable!] (restricted)
  2. Huan Neng Chiu & Deng Maw Tsai, 2002. "An efficient search procedure for the resource-constrained multi-project scheduling problem with discounted cash flows," Construction Management & Economics, Taylor and Francis Journals, vol. 20(1), pages 55-66, January. [Downloadable!] (restricted)
  3. Sou-Sen Leu & Tzung-Heng Hung, 2002. "A genetic algorithm-based optimal resource-constrained scheduling simulation model," Construction Management & Economics, Taylor and Francis Journals, vol. 20(2), pages 131-141, March. [Downloadable!] (restricted)
Statistics
Access and download statistics

Did you know? RePEc and its associated services are free for contributors and users, and do not accept any advertising.

This page was last updated on 2010-1-1.


This information is provided to you by IDEAS at the Department of Economics, College of Liberal Arts and Sciences, University of Connecticut using RePEc data on a server sponsored by the Society for Economic Dynamics.