The supply function model of the English electricity spot market is extended to include a contract market and contestable entry, both of which have dramatic effects on the determination of equilibrium. I present an analytically tractable model that can be solved with contracts, variable numbers of competitors, and capacity constraints. In the case of constant marginal costs and linear demand, two outcomes are possible: if new plant is the same as existing plant and incumbents have insufficient capacity, entry will occur, but if new plant has lower variable costs then incumbents can invest to deter entry.
Download Info
To download:
If you experience problems downloading a file, check if you have the
proper application to
view it first. Information about this may be contained
in the File-Format links below. In case of further problems read
the IDEAS help
page. Note that these files are not on the IDEAS
site. Please be patient as the files may be large.
As the access to this document is restricted, you may want to look for a different version under "Related research" (further below) or search for a different version of it.
Volume (Year): 29 (1998) Issue (Month): 4 (Winter) Pages: 726-749 Download reference. The following formats are available: HTML
(with abstract),
plain text
(with abstract),
BibTeX,
RIS (EndNote, RefMan, ProCite),
ReDIF
Cited by: (explanations, Please report citation or reference errors to , or , if you are the registered author of the cited work, log in to your RePEc Author Service profile, click on "citations" and make appropriate adjustments.) This item has more than 25 citations. To prevent cluttering this page, these citations are listed on a separate page.