Advanced Search
MyIDEAS: Login to save this article or follow this journal

Hydropower Development in Nepal

Contents:

Author Info

  • Deepak Adhikari

    ()
    (Nepal Rastra Bank)

Registered author(s):

    Abstract

    Hydropower has been recognised as a sustainable source of energy with almost zero input cost. Its benefits are that it is non-polluting in the sense that it releases no heat or noxious gases, it has low operating and maintenance cost, its technology offers reliable and flexible operation, and hydropower stations have increased efficiencies along with long life. Nepal's huge potential in hydropower is still untapped. Though Nepal has not yet b een able to tap even one percent of its potential electricity capacity and 60 percent of Nepal's population is still deprived of electricity, it is fascinating to note that Nepal's start in 1911 in the hydropower generation almost dates back to a century. As a cheap, renewable source of energy with negligible environmental impacts, small hydropower has an important role to play in Nepal's future energy supply. Accordingly, micro-hydro system is becoming increasingly popular as an energy source in rural Nepal. Use of environmentally- friendly technologies and implementation of sound legal and institutional issues are critical to improve the reach of the population to hydropower. To make the Plan targets in the power sector a reality, directing more resources to the power projects focusing on rural population remains the pre-requisite. The major strategies of the power sector have been appropriately identified as promoting private sector participation in power generation and distribution, integrating rural electrification with rural economic development programs, and strengthening power infrastructure. The immense role of the power sector in contributing to the generation of broad-based, sustainable and high level of economic growth as well as improving the relative competitiveness of the economy both on a regional and global basis makes it imperative that the programs and activities on power sector development as visualized in the plans and policies be given the utmost urgency, priority and focus.

    Download Info

    If you experience problems downloading a file, check if you have the proper application to view it first. In case of further problems read the IDEAS help page. Note that these files are not on the IDEAS site. Please be patient as the files may be large.
    File URL: http://www.nrb.org.np/ecorev/pdffiles/vol18_art4.pdf
    Download Restriction: no

    Bibliographic Info

    Article provided by Nepal Rastra Bank, Research Department in its journal NRB Economic Review.

    Volume (Year): 18 (2006)
    Issue (Month): (April)
    Pages: 70-94

    as in new window
    Handle: RePEc:nrb:journl:v:18:y:2006:p:70-94

    Contact details of provider:
    Email:
    Web page: http://www.nrb.org.np/ecorev/
    More information through EDIRC

    Related research

    Keywords:

    References

    No references listed on IDEAS
    You can help add them by filling out this form.

    Citations

    Lists

    This item is not listed on Wikipedia, on a reading list or among the top items on IDEAS.

    Statistics

    Access and download statistics

    Corrections

    When requesting a correction, please mention this item's handle: RePEc:nrb:journl:v:18:y:2006:p:70-94. See general information about how to correct material in RePEc.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: (Dr. Bishnu Prasad Gautam).

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If references are entirely missing, you can add them using this form.

    If the full references list an item that is present in RePEc, but the system did not link to it, you can help with this form.

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your profile, as there may be some citations waiting for confirmation.

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.