IDEAS home Printed from https://ideas.repec.org/a/inm/ormnsc/v42y1996i11p1611-1625.html
   My bibliography  Save this article

Bottleneck Resource Allocation in Manufacturing

Author

Listed:
  • Anantaram Balakrishan

    (Smeal College of Business Administration, The Pennsylvania State University, University Park, Pennsylvania 16802)

  • Richard L. Francis

    (Department of Industrial and Systems Engineering, University of Florida, Gainesville, Florida 32611)

  • Stephen J. Grotzinger

    (6 Baris Lane, Hopewell Junction, New York 12533)

Abstract

Many resource-allocation problems in manufacturing and service operations require selecting integer-valued levels for various activities that consume "nondecreasing amounts" of limited resources. System productivity, to be maximized, is limited by the least productive (bottleneck) activity. We first review a basic bisection method that can solve this discrete, monotonic resource-allocation problem even with a nonlinear objective and constraints. We then generalize the basic algorithm to solve an enhanced version of the problem containing additional coupling constraints on the allocation decisions. This generalization applies to assembly-release planning (ARP) in a multiproduct assemble-to-forecast environment with part commonality. The ARP problem requires deciding the number of kits for each product to release for assembly in every time period, using the available parts, to achieve if possible the target service levels for all products and time periods or minimize the maximum deviation of the actual service levels from the targets. We also consider extensions of the ARP model incorporating precedence constraints and part substitutability, and show how to modify the bisection method to solve these problems.

Suggested Citation

  • Anantaram Balakrishan & Richard L. Francis & Stephen J. Grotzinger, 1996. "Bottleneck Resource Allocation in Manufacturing," Management Science, INFORMS, vol. 42(11), pages 1611-1625, November.
  • Handle: RePEc:inm:ormnsc:v:42:y:1996:i:11:p:1611-1625
    DOI: 10.1287/mnsc.42.11.1611
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/mnsc.42.11.1611
    Download Restriction: no

    File URL: https://libkey.io/10.1287/mnsc.42.11.1611?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Kolisch, Rainer, 1998. "Integrated scheduling, assembly area- and part-assignment for large scale, make-to-order assemblies," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 468, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    2. Kolisch, R., 2000. "Integrated scheduling, assembly area- and part-assignment for large-scale, make-to-order assemblies," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 127-141, March.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ormnsc:v:42:y:1996:i:11:p:1611-1625. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.